Scoil Mhuire , Patrick Street , Trim Co. Meath
CONDITIONALPlanning application TA180741
Meath - Meath County Council
Proposed Development
the development will consist of a) the removal of two existing prefabricated temporary classroom units and replacement with a two storey temporary prefabricated unit which will include a toilet block, a store and two 49sqm classrooms and b) the erection of a prefabricated science laboratory as well as all associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
5 Jul 2018
Decision: CONDITIONAL
24 Aug 2018
Decision due
29 Aug 2018
Grant issued
5 Oct 2018
Application Details
- Location
- Scoil Mhuire , Patrick Street , Trim Co. Meath
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Meath County Council
- Site Area
- 1.33 ha
Timeline
- Registration Date
- 5 July 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 24 August 2018
- Grant Date
- 5 October 2018
- Permission Expires
- 4 October 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
the erection of 1 number, single storey prefabricated temporary classroom unit as well as all associated site works on the grounds
Scoil Mhuire , Patrick Street , Trim Co. Meath
the erection of 1 number single storey prefabricated temporary classroom unit as well as all associated site works on the grounds of
Scoil Mhuire , Patrick Street Trim , Co. Meath
the two existing 14 metre telecommunications timber support structures with antennas attached (16.5m overall height) and associated equipment within the exchange compound
Eir Exchange , Castle Street , Trim Co Meath
the removal of two existing 14 metre telecommunications timber support structures with antennas attached (of 16.5m overall height) and the construction of a proposed new 18 metre monopole support structure (overall height 19.5 metres) carrying new telecommunications antennas, dishes and associated equipment, together with new ground level equipment cabinets, fencing and all associated site works
Eir Exchange , Castle Street , Trim Co Meath
the development will consist of a proposed dormer window to rear elevation, internal renovations & alterations in the attic, all elevational changes, and all associated site works. The Trim Parochial House is located within the curtilage of the protected structure of St. Patrick's Church (91278).
Trim Parochial House Patrick Street , Trim , Co. Meath
the development being retained consists of change of use of carport to side of dwelling previously granted planning permission under planning reference no. TA/190773 to home office and gym to include modifications to elevations together with all associated site works
Manorlands , Trim , Co. Meath
re-constructing existing roof to form new dormer extension at first floor level, new single storey porch to front, single storey extension to rear of existing dwelling together with a single storey extension to front on north west side of dwelling. The development also includes new detached domestic garage and all associated site works. Significant further information/revised plans submitted on this application
Manorlands , Trim , Co. Meath
the development will consist of installation of p.v. solar panels on the rear of roof to dwelling house together with all associated site works
Manorlands , Trim , Co Meath
alterations and an extension to the third floor of the existing hotel to provide for a new spa with outdoor thermal area as follows: (i) removal of 2 no. bedrooms at 3rd floor level to provide a spa / thermal area (244 sq.m) including elevational alterations as necessary, (ii) provision of a spa reception area, 3 no. changing rooms and lockers, 1 no. guest WC, 1 no. accessible WC, a rasul (heat experience) with accompanying shower in the anti-chamber; (iii) extension of the spa / thermal facilities out to the Rooftop terrace (156 sq.m) at the same level to the east of the existing hotel to provide an outdoor thermal experience with a sauna, plant room, hydrotherapy pool, hot tubs, cold plunge pool, 2 no. showers, and 4 no. seaweed baths; and (iv) all other associated engineering works, drainage, landscaping, lighting, and ancillary works necessary to facilitate the development
Trim Castle Hotel , Castle Street , Trim Co. Meath.
the development will consist of: Alterations to the first floor of the existing hotel to provide for additional bedrooms which will consist of: (i) change of use of restaurant area at 1st floor level to provide for 7 no. en-suite bedrooms; (ii) change to internal layout to provide for associated corridors, internal doors and necessary alterations. There are no external changes proposed; and (iv) all other associated engineering works, drainage, landscaping, lighting, and ancillary works necessary to facilitate the development
Trim Castle Hotel , Castle Street , Trim Co Meath
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?