SPRINGLAWN PAROCHIAL HOUSE , TOBER , CO OFFALY
CONDITIONALPlanning application 183
Offaly - Offaly County Council
Proposed Development
RESTORATION AND REPAIRS, ALTERATIONS AND ADDITIONS TO A PROTECTED STRUCTURE LISTED AS SPRING LAWN PAROCHIAL HOUSE, TOBER, CO. OFFALY. RPS 03/02 NIAH 14902002 WITHIN THE OFFALY COUNTY DEVELOPMENT PLAN 2014-2020. THE WORKS ARE TO INCLUDE THE RENOVATION AND RESTORATION OF THE EXISTING HOUSE, INTERNAL ALTERATIONS, MODIFICATIONS TO THE MAIN ENTRANCE AND BASEMENMT STAIRS. MINOR ALTERATIONS TO INTERNAL WALL LAYOUT. ALTERATIONS AND RENOVATIONS TO EXTERNAL WINDOWS AND DOORS. REPAIR AND RESTORATION WORKS TO THE ROOF, ADDITIONAL LINK AND ALTERATIONS TO STORAGE SHEDS AND ALL ASSOCIATED SITE WORKS
View the full application file on the council's planning portal →Application Timeline
Application received
2 Jan 2018
Decision: CONDITIONAL
22 Feb 2018
Decision due
26 Feb 2018
Grant issued
29 Mar 2018
Application Details
- Location
- SPRINGLAWN PAROCHIAL HOUSE , TOBER , CO OFFALY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
- Site Area
- 6.84 ha
- Floor Area
- 16.2 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 2 January 2018
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 22 February 2018
- Grant Date
- 29 March 2018
- Permission Expires
- 28 March 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
THE RESTORATION AND REPAIRS, ALTERATIONS AND ADDITIONS TO A PROTECTED STRUCTURE LISTED AS SPRING LAWN PAROCHIAL HOUSE, TOBER, CO. OFFALY RPS 03/02 NIAH 14902002 WITHIN THE OFFALY COUNTY DEVELOPMENT PLAN 2014-2020. THE WORKS ARE TO INCLUDE THE RENOVATION AND RESTORATION OF THE EXISTING HOUSE, INTERNAL ALTERATION TO THE REAR SITTING ROOM, MODIFICATIONS TO THE MAIN ENTRANCE, ENTRANCE HALL AND BASEMENT STAIRS. MINOR ALTERATIONS TO INTERNAL WALL LAYOUT. ALTERATIONS TO EXTERNAL WINDOWS AND DOORS TO THE BASEMENT AREA. REPAIRS AND RESTORATION WORKS TO THE ROOF, ADDITIONAL GLAZED LINK TO REAR YARD AND STORAGE SHEDS AND ALL ASSOCIATED SITE WORKS.
SPRINGLAWN PAROCHIAL HOUSE , TOBER , CO. OFFALY
RESTORATION AND REPAIRS, ALTERATIONS AND ADDITIONS TO A PROTECTED STRUCTURE LISTED AS SPRING LAWN PAROCHIAL HOUSE, TOBER, CO. OFFALY RPS 03/02 NIAH 14902002 WITHIN THE OFFALY COUNTY DEVELOPMENT PLAN 2014-2020. THE WORKS ARE TO INCLUDE THE RENOVATION AND RESTORATION OF THE EXISTING HOUSE, INTERNAL ALTERATION TO THE REAR SITTING ROOM, MODIFICATIONS TO THE MAIN ENTRANCE, ENTRANCE HALL AND BASEMENT STAIRS. MINOR ALTERATIONS TO INTERNAL WALL LAYOUT. ALTERATIONS TO EXTERNAL WINDOWS AND DOORS TO THE BASEMENT AREA. REPAIR AND RESTORATION WORKS TO THE ROOF, ADDITIONAL GLAZED LINK TO REAR YARD AND STORAGE SHEDS AND ALL ASSOCIATED SITE WORKS
SPRINGLAWN PAROCHIAL HOUSE , TOBER , CO. OFFALY
construction of a new dwelling house, detached garage, wastewater treatment system, storm water soakaways, new vehicular entrance and all associated site works
Tober(Tubber) , Clara , Co. Offaly
construction of a new dwelling house, detached garage, wastewater treatment system, storm water soakaways, new vehicular entrance and all associated site works
Tober(Tubber) , Clara , Co. Offaly
CONSTRUCTION OF A FOUR BEDROOM DWELLING. THE APPLICATION WILL ALSO INCLUDE A NEW VEHICLE AND PEDESTRIAN ENTRANCE, EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA, GARAGE AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE
TUBBER (TOBER) , CO. OFFALY
CONSTRUCTION OF A FOUR BEDROOM DWELLING. THE APPLICATION WILL ALSO INCLUDE A NEW VEHICLE AND PEDESTRIAN ENTRANCE, EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA, GARAGE AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE
TUBBER (TOBER) , CO. OFFALY
(i) DEMOLITION OF EXISTING COTTAGE AND SHED (ii) DEMOLITION OF EXISTING BLOCK BUILT BOUNDARY WALLS (iii) DECOMMISSIONING OF EXISTING SEPTIC TANK AND PERCOLATION AREA (iv) CONSTRUCTION OF A SINGLE STOREY CHILCARE FACILITY INCORPORATING A SESSIONAL PRE-SCHOOL FACILITY AND ALSO AFTER SCHOOL CARE (v) INSTALLATION OF NEW TREATMENT SYSTEM AND PERCOLATION AREA (vii) CONSTRUCTION OF NEW NAP PLASTERED BOUNDARY WALLS TO SELECTED BOUNDARIES (vii) NEW ENTRANCE AND PROVISION OF CAR PARKING WITH ON-SITE DROP OFF FACILITIES, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
TUBBER (TOBER) , CO OFFALY
construction of one number detached single storey dwelling , one number detached single storey garage, to upgrade existing entrance to public road, to connect to public watermain, to install a septic tank and percolation area and all associated site works
Tober , Co. Offaly
8 NUMBER FOUR BEDROOM AND 2 NUMBER THREE BED DWELLINGS. THE APPLICATION WILL ALSO INCLUDE A COMMUNTIY EFFLUENT TREATMENT UNIT, PERCOLATION AREA, NEW VEHICULAR ENTRANCE AND ASSOCIATED ACCESS ROADS, FOOTPATHS, PUBLIC OPEN SPACE AND ALL ASSOCIATED SITE WORKS AND DRAINAGE
TUBBER , CO. OFFALY
NINE, FOUR BEDROOM DWELLINGS. THE APPLICATION WILL ALSO INCLUDE A COMMUNITY EFFLUENT TREATMENT UNIT, PERCOLATION AREA, NEW VEHICULAR ENTRANCE AND ASSOCIATED ACCESS ROADS, FOOTPATHS, PUBLIC OPEN SPACE AND ALL ASSOCIATED SITE WORKS AND DRAINAGE
TUBBER , CO. OFFALY
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?