ST COLMCILLE DURROW COMMUNITY CENTRE , BALLYBOUGHT , DURROW CO. OFFALY
N/APlanning application 1891
Offaly - Offaly County Council
Proposed Development
THE REPLACEMENT OF THE EXISTING ROOF WITH A NEW ROOF WITH CONDRON TILE/SENIOR TILE, AND THE REPLACEMENT OF 2 FLAT ROOFED EXTENSIONS WITH 2 NEW 35 DEGREE PITCHED ROOF CONSTRUCTIONS WITH CONDRON TILE/SENIOR TILE, AND THE EXTENSION OF THE TICKET OFFICE BY 5.4 SQ.M, AND THE REMOVAL OF THE EXISTING PLASTER RENDER FINISH TO THE FRONT PORCH AND TO LEAVE A POINTED STONE FINISH TO THE FRONT PORCH
Application Details
- Location
- ST COLMCILLE DURROW COMMUNITY CENTRE , BALLYBOUGHT , DURROW CO. OFFALY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
Timeline
- Registration Date
- 28 February 2018
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
REPLACEMENT OF THE EXISTING ROOF WITH A NEW ROOF WITH CONDRON TILE / SENIOR TILE, AND THE REPLACEMENT OF 2 FLAT ROOFED EXTENSIONS WITH 2 NEW 35 DEGREE PITCHED ROOF CONSTRUCTIONS WITH CONDRON TILE / SENIOR TILE, AND THE EXTENSION OF THE TICKET OFFICE BY 5.4 SQ. M, AND THE REMOVAL OF THE EXISTING PLASTER RENDER FINISH TO THE FRONT PORCH AND TO LEAVE A POINTED STONE FINISH TO THE FRONT PORCH. THE PROPOSED DEVELOPMENT IS WITHIN THE CURTILAGE OF 2 PROTECTED STRUCTURES, RPS 13-04 AND RPS 13-05 AS PER THE RECORD OF PROTECTED STRUCTURES - OFFALY COUNTY DEVELOPMENT PLAN 2014-2020
ST COLMCILLE DURROW COMMUNITY CENTRE , BALLYBOUGHT DURROW , CO OFFALY
REPLACEMENT UPGRADE OF THE SCHOOL'S EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
ST COLMCILLE'S NATIONAL SCHOOL , DURROW , TULLAMORE CO OFFALY R35 XY 40
PROPOSED CHANGES TO THE BUILDING DESIGN FOR ALREADY GRANTED PLANNING PERMISSION FOR NEW CHILD CARE FACILITY, EFFLUENT TREATMENT SYSTEM, ENTRANCE AND ALL ANCILLARY WORK - PLANNING REF: 15-22. THE CHANGES INCLUDE AN ADDITIONAL CLASSROOM TO THE SIDE OF THE PROPOSED BUILDING WITH SOME MINOR INTERNAL ALTERATIONS
BALLYBOUGHT , DURROW , CO OFFALY
ALTERATIONS AND EXTENSION TO REAR OF EXISTING CHILD CARE FACILITY TO ALLOW FOR RELOCATED TOILETS AND EXTENDED CLASSROOMS
BALLYBOUGHT DURROW , TULLAMORE CO OFFALY
RENOVATIONS TO EXISTING DWELLING WITH A NEW BUILD EXTENSION TO THE REAR, DEMOLITION OF TWO NUMBER EXISTING SHEDS AND RENOVATIONS TO LOWER THE ROOFLINE OF ONE OTHER EXISTING SHED
BALLYBOUGHT DURROW , TULLAMORE , CO. OFFALY
EXISTING EXTENSIONS TO THE REAR AND TO THE END OF THE ORIGINAL DWELLING HOUSE AND THE PLANNING PERMISSION REFERS TO THE INSTALLATION OF A PACKAGED WASTEWATER TREATMENT SYSTEM CONSISTING OF A NEW SEPTIC TANK WITH SECONDARY TREATMENT FOLLOWED BY A TERTIARY TREATMENT SYSTEM
BALLYBOUGHT , DURROW , TULLAMORE CO. OFFALY
RENOVATIONS TO EXISTING DWELLING WITH A NEW BUILD EXTENSION TO THE REAR, DEMOLITION OF TWO NUMBER EXISTING SHEDS, LOWERING THE ROOF LINE OF ONE OTHER SHED AND IN COMPLIANCE WITH PERMISSION GRANTED UNDER RETENTION/PERMISSION APPLICATION REFERENCE NUMBER 18/556, TO INSTALL PACKAGED WASTE WATER TREATMENT SYSTEM CONSISTING OF A NEW SEPTIC TANK WITH SECONDARY TREATMENT FOLLOWED BY A TERTIARY TREATMENT SYSTEM
BALLYBOUGHT , DURROW , TULLAMORE CO. OFFALY
EXTENSIONS TO THE REAR AND TO THE END OF THE ORIGINAL DWELLING HOUSE
BALLYBOUGHT , DURROW , TULLAMORE CO OFFALY
A DWELLING HOUSE, SEPTIC TANK AND PERCOLATION AREA, NEW SITE ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
BALLYBOUGHT , DURROW , TULLAMORE
the construction of a one-storey domestic side extension (401.6 sq m) consisting of an open plan kitchen-living-dining room, pantry, utility room, bathroom, games room, gym, sauna, and steam room. Permission is also sought for the upgrade of the existing septic tank system and percolation area to a wastewater treatment system and polishing filter and all associated site works at the above address.
Ballybought , Durrow , Co. Offaly
The submission window has closed
Observations on this application closed on Tuesday 3 April 2018, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?