← Back to search

KINNITTY CASTLE HOTEL , CASTLETOWN KINNITTY , BIRR CO. OFFALY

CONDITIONAL

Planning application 19474

Offaly - Offaly County Council

Proposed Development

DEVELOPMENT THAT WILL CONSIST OF THE ALTERATION AND MATERIAL CHANGE OF USE OF EXISTING COACH HOUSE AND STABLE OUTBUILDINGS TO THE REAR OF KINNITTY CASTLE HOTEL, TO A PROPOSED CRAFT DISTILLERY AND VISITOR CENTRE. THE ALTERED BUILDINGS WILL CONTAIN SPACE FOR THE FOLLOWING: DISTILLERY PROCESS, BOTTLING, STORAGE, RETAIL AREA, TASTING AREA AND BAR, CRAFT WORKSHOPS, ANCILLARY STAFF AREAS AND TOILETS. THE WORKS WILL INCLUDE REPAIRS AND ALTERATIONS TO THE EXISTING BUILDINGS AND SITE DEVELOPMENT WORKS INCLUDING NEW COURTYARD SCREEN WALL, LANDSCAPING TO COURTYARD, FOUL AND SURFACE WATER DRAINAGE. THE PROPOSED DEVELOPMENT CONSISTS OF WORK TO A PROTECTED STRUCTURE

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Oct 2019

  2. Further information requested

    27 Nov 2019

  3. Further information received

    26 May 2020

  4. Decision due

    27 Aug 2020

  5. Decision: CONDITIONAL

    27 Aug 2020

  6. Grant issued

    22 Oct 2020

Application Details

Location
KINNITTY CASTLE HOTEL , CASTLETOWN KINNITTY , BIRR CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
3.4 ha

Timeline

Registration Date
3 October 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 August 2020
Grant Date
22 October 2020
Permission Expires
21 October 2025

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

3m
19459N/A20 Sept 2019

DEVELOPMENT CONSISTING OF THE ALTERATION AND MATERIAL CHANGE OF USE OF EXISTING COACH HOUSE AND STABLE OUTBUILDINGS TO THE REAR OF KINNITTY CASTLE HOTEL, TO A PROPOSED CRAFT DISTILLERY AND VISITOR CENTRE. THE ALTERED BUILDINGS WILL CONTAIN SPACE FOR THE FOLLOWING: DISTILLERY PROCESS, BOTTLING, STORAGE, RETAIL AREA, TASTING AREA AND BAR, CRAFT WORKSHOPS, ANCILLARY STAFF AREAS AND TOILETS. THE WORKS WILL INCLUDE REPAIRS AND ALTERATIONS TO THE EXISTING BUILDINGS AND SITE DEVELOPMENT WORKS INCLUDING NEW COURTYARD SCREEN WALL, LANDSCAPING TO COURTYARD, FOUL AND SURFACE WATER DRAINAGE. THE PROPOSED DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE.

KINNITY CASTLE HOTEL , CASTLETOWN KINNITY , BIRR CO OFFALY

565m
2053CONDITIONAL24 Feb 2020

CONSTRUCTION OF A 30M HIGH MULTI-USER LATTICE TELECOMMUNICATIONS STRUCTURE, CARRYING ANTENNA AND DISHES ENCLOSED WITHIN A 2.4M HIGH PALISADE FENCE COMPOUND INCLUDING NEW ACCESS TRACK TOGETHER WITH ASSOCIATED GROUND EQUIPMENT AND ASSOCIATED SITE WORKS

KINNITY GAA CLUB , CASTLETOWN AND GLINSK TD , KINNITY CO OFFALY

643m
2626N/A18 Mar 2026

(A) AS BUILT RAFT FOUNDATION FOR PROPOSED RESIDENTIAL UNIT AND (B) PLANNING PERMISSION TO ERECT STEEL FRAMED RESIDENTIAL UNIT ON EXISTING RAFT FOUNDATION, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER ALL ANCILLARY SITE WORKS

THE WALK , KINNITTY , CO.OFFALY

821m
19587CONDITIONAL10 Dec 2019

THE CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING AND DOMESTIC GARAGE, A PROPOSED SEPTIC TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS, INCLUDING THE UPGRADE OF AN EXISTING AGRICULTURAL TRACK AND A PROPOSED SITE ENTRANCE

LISMONEY , KINNITTY BIRR , CO OFFALY

855m
17254CONDITIONAL14 Jul 2017

CONSTRUCTION OF (i) CUBICLE HOUSE WITH SLATTED TANKS (ii) CRUSH/HANDLING YARD (iii) DAIRY WASH TANK AND ALL ASSOCIATED SITE WORKS

LISMONEY , KINNITTY BIRR , CO. OFFALY

857m
17229N/A28 Jun 2017

CONSTRUCTION OF (I) CUBICLE HOUSE WITH SLATTED TANKS (II) CRUSH/HANDLING YARD (III) DAIRY WASH TANK AND ALL ASSOCIATED SITE WORKS.

LISMONEY , KINNITTY , BIRR

1.1km
21691CONDITIONAL5 Nov 2021

CONSTRUCTION OF 1 NO. DWELLING, GARAGE, SEPTIC TANK & PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

LETTYBROOK CADAMSTOWN , BIRR , CO. OFFALY

1.2km
2660398N/A24 Jul 2026

change of house design from that granted permission under planning file ref. 25/60199, with all associated site works

Castletown , Kinnity , Birr Co.Offaly

1.2km
2660428N/A14 Aug 2026

change of house design from that granted permission under planning file ref. 25/60199, with all associated site works

Castletown , Kinnity , Birr Co.Offaly

1.2km
2560199CONDITIONAL26 May 2025

the construction of a new extension to the rear and side of the existing house, the refurbishment of the existing house including internal and external alterations, the removal of the existing front porch, the construction of a separate garage, and all associated site development works.

Castletown , Kinnity , Birr Co Offaly

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?