← Back to search

BALLYFORE , CROGHAN , CO. OFFALY

CONDITIONAL

Planning application 20602

Offaly - Offaly County Council

Proposed Development

(1.) A DETACHED DOMESTIC SHED (2.) INCREASE OF OVERALL HEIGHT OF EXISTING HOUSE AND FIVE ROOFLIGHT WINDOWS IN THE REAR ELEVATION AND ANY ASSOCIATED WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    2 Dec 2020

  2. Decision: CONDITIONAL

    1 Feb 2021

  3. Decision due

    4 Feb 2021

  4. Grant issued

    12 Mar 2021

Application Details

Location
BALLYFORE , CROGHAN , CO. OFFALY
Applicant
N/A
Application Type
RETENTION
Planning Authority
Offaly County Council
Site Area
0.27 ha
Floor Area
111.52 sq m
Residential Units
1

Timeline

Registration Date
2 December 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
1 February 2021
Grant Date
12 March 2021
Permission Expires
11 March 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

554m
23158CONDITIONAL11 Apr 2023

CONSTRUCTION OF A SINGLE STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTEWATER TREATMENT SYSTEM AND A NEW SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS

BALLYFORE , CROGHAN , CO. OFFALY

555m
23127N/A24 Mar 2023

THE CONSTRUCTION OF A SINGLE STOREY DWELLING AND A DOMESTIC GARAGE AND A WASTE WATER TREATMENT SYSTEM AND A NEW SITE ENTRANCE AND ALL ASSOCIATED SITE WORKS

BALLYFORE , CROGHAN , CO. OFFALY

847m
21577CONDITIONAL20 Sept 2021

THE CONSTRUCTION OF A DWELLING AND A DOMESTIC GARAGE AND A WASTEWATER TREATMENT SYSTEM AND A VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE WORKS

BALLYBEG , CROGHAN , CO. OFFALY

881m
2660131CONDITIONAL13 Mar 2026

the construction of a single storey dwelling and a domestic garage and a waste water treatment system and a vehicular entrance and all associated site works

Ballybeg , Croghan , Offaly

1.3km
19385N/A30 Jul 2019

THE LOWERING AND LEVELLING OF GROUND ON LAND FOR AGRICULTURAL PURPOSES BY REMOVAL OF MOUNDS / HILLS; THE CONSTRUCTION OF A TEMPORARY HAUL ROAD AND ALL ASSOCIATED ANCILLARY FACILITIES. THE DURATION OF THE WORKS IS FOUR YEARS

DERRYARKIN , RHODE , CO OFFALY

1.3km
19455N/A17 Sept 2019

DEVELOPMENT CONSISTING OF THE EXTRACTION OF MATERIAL FROM MY LAND BY REMOVAL OF MOUNDS / HILLS FOR IMPROVED AGRICULTURAL PURPOSES; THE CONSTRUCTION OF A TEMPORARY HAUL ROAD WHERE SURPLUS MATERIAL (GENERAL FILL MATERIAL/BOULDER CLAY) WILL BE TRANSPORTED TO SUPPLY THE YELLOW RIVER WIND FARM TURBINE PROJECT, AN BORD PLEANALA REF. NO. PL19.PA0032 AND ALL ASSOCIATED ANCILLARY FACILITIES. THE DURATION OF THE WORKS IS FOUR YEARS

DERRYARKIN , RHODE , CO OFFALY

1.4km
17251CONDITIONAL11 Jul 2017

(A) 1 NO. NEW TWO STOREY TYPE DWELLING HOUSE, (B) 1 NO. NEW DOMESTIC GARAGE, (C) INSTALLATION OF A NEW ON-SITE EFFLUENT TREATMENT (D) NEW VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

DERRYARKIN , CROGHAN , RHODE

1.7km
2560480N/A10 Oct 2025

1. An overall application area of c. 19.5 hectares; 2. Phased extraction of sand and gravel (wet working) over an area of c. 11.7 hectares with processing that includes crushing and screening and all ancillary works and structures; 3. Provision of new site facilities to include wheelwash (c. 35m²), weighbridge (c. 69m²); mobile welfare pod facility (c. 16m²) consisting of office, canteen, toilet and drying room; dedicated parking area, perimeter vegetation planting and fencing; 4. Access to the site will be via an existing entrance onto the local access road to the north of the site; 5. Progressive restoration of the site to naturally regenerated wildlife habitat and a permanent water body; 6. The proposed development life is for 15 years to complete extraction and restoration operations.

Derryarkin Townland , Croghan Rhode , Co. Offaly

1.7km
2560511CONDITIONAL23 Oct 2025

1. An overall application area of c. 19.5 hectares; 2. Phased extraction of sand and gravel (wet working) over an area of c. 11.7 hectares with processing that includes crushing and screening and all ancillary works and structures; 3. Provision of new site facilities to include wheelwash (c. 35m²), weighbridge (c. 69m²); mobile welfare pod facility (c. 16m²) consisting of office, canteen, toilet and drying room; dedicated parking area, perimeter vegetation planting and fencing; 4. Access to the site will be via an existing entrance onto the local access road to the north of the site; 5. Progressive restoration of the site to naturally regenerated wildlife habitat and a permanent water body; 6. The proposed development life is for 15 years to complete extraction and restoration operations. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of this planning application

Derryarkin Townland , Croghan Rhode , Co. Offaly

1.8km
21247CONDITIONAL27 Apr 2021

A 23 YEAR PERMISSION FOR A 44.0 HECTARE EXTENSION TO AN EXISTING AUTHORISED SAND AND GRAVEL PIT COMPRISING OF THE FOLLOWING: AN EXTRACTION AREA OF 43.8 HA.; REMOVAL OF 10.2 HA. OF COMMERCIAL FORESTRY AND REMOVAL OF OVERBURDEN MATERIAL FROM THE REMAINING 33.6 HECTARES OF THE PROPOSED EXTRACTION AREA; EXTRACTION OF SAND AND GRAVEL BY MECHANICAL MEANS; UPGRADING OF THE EXISTING INTERNAL HAUL ROAD MEASURING 0.2 HA.; TRANSPORTATION OF EXTRACTED MATERIAL TO THE EXISTING AUTHORISED MANUFACTURING AREA FOR PROCESSING VIA THE INTERNAL HAUL ROAD; LANDSCAPING AND RESTORATION OF THE SITE INCLUDING SCREENING BERMS; ALL ASSOCIATED ANCILLARY FACILITIES/WORKS. THE APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR)

DERRYARKIN & BUNSALLAGH TOWNLANDS , RHODE , CO. OFFALY