GREENVILLE/GARRYDUFF , TUBBER , CO. OFFALY
CONDITIONALPlanning application 21193
Offaly - Offaly County Council
Proposed Development
CONSTRUCTION OF A STOREY AND A HALF DWELLING, DETACHED RESIDENTIAL GARAGE, PROPRIETARY TREATMENT SYSTEM, PERCOLATION AREA & ALL ANCILLARY SITE WORKS AS PER SUBMITTED DRAWINGS
View the full application file on the council's planning portal →Application Timeline
Application received
9 Apr 2021
Further information requested
3 Jun 2021
Further information received
24 Aug 2021
Decision due
20 Sept 2021
Decision: CONDITIONAL
20 Sept 2021
Grant issued
27 Oct 2021
Application Details
- Location
- GREENVILLE/GARRYDUFF , TUBBER , CO. OFFALY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
- Site Area
- 0.84 ha
- Floor Area
- 329.7 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 9 April 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 20 September 2021
- Grant Date
- 27 October 2021
- Permission Expires
- 26 October 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
CONSTRUCTION OF A FOUR BEDROOM DWELLING WITH GARAGE. THE APPLICATION WILL ALSO INCLUDE THE ADDITION OF A NEW BOUNDARY TO THE EAST OF THE SITE, TREATMENT UNIT WITH PERCOLATION AREA AND ALL ASSOCIATED SITE-WORKS AND DRAINAGE
KIPPEENDUFF/BOLART NORTH , CLARA , CO. OFFALY
EXISTING TWO STOREY EXTENSION AT REAR OF EXISTING DWELLING TO INCLUDE ON GROUND FLOOR A CHIMNEY, KITCHEN, DINING, UTILITY, W.C. AND STAIRS AND ON FIRST FLOOR 2 BEDROOMS, LANDING AND BATHROOM
CLOUGHATANNY , CLARA , CO. OFFALY
EXISTING TWO STOREY EXTENSION AT REAR OF EXISTING DWELLING TO INCLUDE ON GROUND FLOOR A CHIMNEY, KITCHEN, DINING, UTILITY, W.C. AND STAIRS AND ON FIRST FLOOR 2 BEDROOMS, LANDING AND BATHROOM
CLOUGHATANNY , CLARA , CO. OFFALY
1. DEMOLITION OF AN EXISTING SINGLE STOREY EXTENSION TO THE SIDE (NORTH-EAST) OF THE EXISTING DWELLING HOUSE AND PERMISSION TO CONSTRUCT A NEW TWO STOREY EXTENSION IN ITS PLACE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS. 2. RETENTION PERMISSION IS SOUGHT FOR AN EXISTING DOMESTIC SHED TO THE REAR OF THE EXISTING DWELLING HOUSE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS
CLOGHATANNY , BALLYCUMBER , CO OFFALY
EXTENSION TO GARAGE, FUEL SHEDS, OUTBUILDINGS, DOMESTIC KENNELS AND BOILER HOUSE
CLOUGHATANNY , CLARA , CO. OFFALY
THE CONSTRUCTION OF A DETACHED TWO STOREY DWELLING, DETACHED DOMESTIC GARAGE, ONSITE WASTE WATER TREATMENT SYSTEM, CONNECTION TO NECESSARY SERVICES, BOUNDARY TREATMENTS TOGETHER WITH ALL ASSOCIATED SITE WORKS
CLOGHATANNY , CLARA , CO. OFFALY
A SLATTED CATTLE SHED AND PERMISSION FOR A SEPARATE MULTIPLE-USE AGRICULTURE BUILDING WITH WASTE COLLECTION CHANNEL AND ASSOCIATED ANCILLARY SITE WORKS
KILMANAGHAN , CLARA , CO. OFFALY
A new dwelling, gated entrance, garage; percolation area with septic tank system and all ancillary site works.
Gorteen , Tubber , Co.Offaly
A NEW DWELLING, GATED ENTRANCE, GARAGE; PROPRIETARY TREATMENT SYSTEM WITH DISCHARGE TO A PACKAGED TERTIARY UNIT AND ALL ANCILLARY SITE WORKS
GORTEEN , TUBBER , CO. OFFALY
construction of a side extension onto our existing dwelling and carry out internal alterations and renovations to the existing dwelling, resulting in a partial reconfiguration of the internal layout of the existing dwelling to create a self-contained granny flat, and also to decommission existing septic tank and replace with new treatment plant with percolation area and all associated site works
Kilfoylan , Moate , Co.Offaly
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?