← Back to search

BALLYKEAN GEASHILL , TULLAMORE , CO. OFFALY

REFUSED

Planning application 21526

Offaly - Offaly County Council

Proposed Development

A PIG FINISHING UNIT, 2 NO MEAL BINS AND ASSOCIATED SITE WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS) RELATING TO THIS PROPOSED DEVELOPMENT WILL BE SUBMITTED WITH THIS PLANNING APPLICATION

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    25 Aug 2021

  2. Decision due

    19 Oct 2021

  3. Decision: REFUSED

    19 Oct 2021

  4. Appeal submitted

    15 Nov 2021

  5. Appeal decided: REFUSED

    4 Aug 2023

Application Details

Location
BALLYKEAN GEASHILL , TULLAMORE , CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.72 ha

Timeline

Registration Date
25 August 2021
Status
APPLICATION FINALISED
Decision
REFUSED
Decision Date
19 October 2021

An Coimisiún Pleanála Appeal

Appeal Reference
ABP 311957 21
Decision
REFUSED
Submitted
15 November 2021
Decided
4 August 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20134N/A14 Apr 2020

A PIG FINISHING UNIT, 2 NO. MEAL BINS AND ASSOCIATED SITE WORKS

BALLYKEAN GEASHILL , TULLAMORE , CO. OFFALY

0m
21406N/A1 Jul 2021

A PIG FINISHING UNIT, 2 NO MEAL BINS AND ASSOCIATED SITE WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT (NIS) RELATING TO THIS PROPOSED DEVELOPMENT WILL BE SUBMITTED WITH THIS PLANNING APPLICATION

BALLYKEAN , GEASHILL TULLAMORE , CO. OFFALY

22m
2460500N/A10 Dec 2024

a)Construct 1 No. ancillary storage shed together with all ancillary structures and associated site works, and, b)amend/modify/remove Condition No. 16 (relating to a Special Development Contribution) attached to planning permission ref: 13/71 previously granted to this farm

Ballykean Geashill , Tullamore , Co. Offaly

22m
2460518CONDITIONAL18 Dec 2024

a) construct 1 No. ancillary storage shed together with all ancillary structures and associated site works, and, b) amend/modify/remove Condition No. 16 (relating to a Special Development Contribution) attached to planning permission ref: 13/71 previously granted to this farm

Ballykean Geashill , Tullamore , Co. Offaly

545m
21641CONDITIONAL15 Oct 2021

(A) REAR EXTENSION & (B) NEW RAISED ROOF TO CREATE FIRST FLOOR DORMER LEVEL USING EXISTING VEHICULAR ENTRANCE & ALL ASSOCIATED SITE WORKS

BALLYKEAN , GEASHILL , CO. OFFALY

607m
2460165N/A16 May 2024

the demolition of an existing extension to the rear of dwelling and of existing outbuilding. Construction of a single storey curved roof extension to rear of existing bungalow with flat roof link building. Revisions to internal layout of existing dwelling and all associated site works and services

Snowdrop Cottage , Ballykean Geashill , Co. Offaly

607m
2460198CONDITIONAL3 Jun 2024

the demolition of existing outbuilding and construction of a single storey curved roof extension to rear of existing bungalow with flat roof link building. Revisions to internal layout of existing dwelling and all associated site works and services

Snowdrop Cottage , Ballykean Geashill , Co. Offaly

611m
2049CONDITIONAL19 Feb 2020

A SINGLE STOREY PORCH TO THE FRONT OF AN EXISTING SINGLE STOREY DWELLING

BALLYKEAN , GEASHILL , CO. OFFALY (R35 PC61)

613m
19561N/A26 Nov 2019

A SINGLE STOREY PORCH TO THE FRONT OF AN EXISTING SINGLE STOREY DWELLING

BALLYKEAN , GEASHILL , CO OFFALY (R35 PC61)

837m
23438CONDITIONAL22 Dec 2023

(A) DWELLING HOUSE AND DOMESTIC GARAGE AS CONSTRUCTED AND (B) ALTERATIONS TO SITE LAYOUT AND SITE BOUNDARY AND ASSOCIATED SITE WORKS AS CONSTRUCTED CONTRARY TO PLANNING PERMISSION GRANTED UNDER REFERENCE 07/1486.

BALLYKEAN , GEASHILL CO. OFFALY , R35 KO90

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?