Proposed Development
DWELLING HOUSE, GARAGE, EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS AND SERVICES
View the full application file on the council's planning portal →Application Timeline
Application received
23 Dec 2021
Decision due
25 Feb 2022
Decision: CONDITIONAL
25 Feb 2022
Grant issued
11 Apr 2022
Application Details
- Location
- CLONCON , TULLAMORE , CO. OFFALY
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Offaly County Council
- Site Area
- 0.449 ha
- Floor Area
- 350.84 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 23 December 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 25 February 2022
- Grant Date
- 11 April 2022
- Permission Expires
- 10 April 2027
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
(1) construction of a new external underground slatted slurry storage tank for livestock use including feed barriers and feeding area to rear of existing farm building, completed with associated siteworks, and (2) Retention Permission for farm building for housing of livestock as constructed including associated siteworks. The proposed development is within the curtilage of a protected structure, Cloncon, number 33-03, NIAH Reference 14917009.
Cloncon , Tullamore , Co Offaly
The development consists of (1) Permission to construct a new external underground slatted slurry storage tank for livestock use including feed barriers and feeding area to rear of existing farm building, completed with associated siteworks, and (2) Retention Permission for farm building for housing of livestock as constructed including associated siteworks. The proposed development is within the curtilage of a protected structure, Cloncon, number 33-03, NIAH Reference 14917009.
Cloncon , Tullamore , Co Offaly
CONSTRUCTION OF A SINGLE STOREY PORCH EXTENSION TO THE SOUTH, SINGLE STOREY EXTENSIONS TO THE NORTH, AMENDMENTS TO EXISTING WINDOW AND DOOR OPES TO THE NORTH, ADDITIONAL WINDOW OPES TO THE EAST & WEST (ALL AT GROUND FLOOR LEVEL). A FIRST-FLOOR EXTENSION TO THE NORTH TO INCREASE ACCOMMODATION TO PREVIOUSLY APPROVED ATTIC CONVERSION INCLUDING A BALCONY, ROOFLIGHTS AND ALL ASSOCIATED INTERNAL MODIFICATIONS AND SITEWORKS
CLONCON , TULLAMORE , CO. OFFALY
THE CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING, DOMESTIC OUTBUILDING, A PROPOSED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER, ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCE
CLONCON , TULLAMORE , CO.OFFALY
THE CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING WITH A DOMESTIC GARAGE, A PROPOSED SEPTIC TANK AND PERCOLATION AREA, ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCE
CLONMINCH , TULLAMORE , CO. OFFALY
A SINGLE STOREY EXTENSION TO THE REAR OF AN EXISTING DETACHED GARAGE WITH ASSOCIATED SITE WORKS
CLONMINCH TULLAMORE , CO. OFFALY , R35 E575
FRONT BOUNDARY AND ENTRANCE AS CONSTRUCTED
CLONMINCH , TULLAMORE , CO. OFFALY
CONSTRUCTION OF ONE 4.2MW WIND TURBINE WITH AN OVERALL TIP HEIGHT OF UP TO 150M; THE CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS
CLONMINCH , TULLAMORE , CO. OFFALY
THE CONSTRUCTION OF ONE WIND TURBINE WITH AN OVERALL HEIGHT OF UP TO 150M; THE CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISON OF A SITE ENTRANCE AND AN ACCESS TRACK WITH IN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRIC CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THE DEVELOPMENT WILL HAVE A TOTAL OUTPUT OF UP TO AND NOT GREATER THAN 5MW'S
CLONMINCH , TULLAMORE , CO. OFFALY
Construction of a new dwelling house, install an effluent treatment unit with percolation area and all ancillary site works
Clonminch , Tullamore , Co. Offaly
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?