Proposed Development
A SINGLE STOREY MASONRY CONSTRUCTED OUTBUILDING AND A SINGLE STOREY STEEL FRAMED, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE OF THE PROPERTY
View the full application file on the council's planning portal →Application Details
- Location
- SHEAN EDENDERRY , CO. OFFALY , R45 KN92
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Offaly County Council
Timeline
- Registration Date
- 11 February 2022
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
1) A SINGLE STOREY, MASONRY CONSTRUCTED, PITCHED ROOF BUILDING AND 2) A SINGLE STOREY, STEEL FRAMED, PITCHED ROOF, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE (FOR ANCILLARY USE) TO THE EXISTING DWELLING
SHEAN , EDENDERRY , CO. OFFALY R45 KN92
A SINGLE STOREY MASONRY CONSTRUCTED OUTBUILDING AND A SINGLE STOREY STEEL FRAMED, TIMBER CLAD OUTBUILDING TO THE REAR/SIDE OF THE PROPERTY
SHEAN , EDENDERRY CO. OFFALY , R45 KN92
LEVELLING OF AGRICULTURAL LANDS BY THE IMPORTATION OF CLEAN, UNCONTAMINATED SOIL AND STONE MATERIALS UNDER ARTICLE 27 OF THE EUROPEAN COMMUNITIES (WASTE DIRECTIVE) REGULATIONS 2011, AS AMENDED. AN ARTICLE 6(3) OF THE HABITATS DIRECTIVE SCREENING FOR APPROPRIATE ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT
BALLYKILLEEN , SHEAN EDENDERRY , CO.OFFALY
LEVELLING OF AGRICULTURAL LANDS BY THE IMPORTATION OF CLEAN, UNCONTAMINATED SOIL AND STONE MATERIALS UNDER ARTICLE 27 OF THE EUROPEAN COMMUNITIES (WASTE DIRECTIVE) REGULATIONS 2011, AS AMENDED. AN ARTICLE 6(3) OF THE HABITATS DIRECTIVE SCREENING FOR APPROPRIATE ASSESSMENT REPORT HAS BEEN PREPARED IN RESPECT OF THE PROPOSED DEVELOPMENT
BALLYKILLEEN , SHEAN EDENDERRY , CO.OFFALY
Retention of the existing apartments in the existing basement of the dwelling house. Permission is also sought to retain and complete for the existing outbuilding to the south boundary of the site. Permission is also sought to install a secondary treatment system and polishing filter all associated site works at the above address.
Shean , Edenderry , Co. Offaly
the existing apartments in the existing basement of the dwelling house. Permission is also sought to retain and complete for the existing outbuilding to the south boundary of the site. Permission is also sought to install a secondary treatment system and polishing filter all associated site works
Shean , Edenderry , Co. Offaly
change of the use of the existing stables (Block A 88.6sqm, Block B 339.8sqm, Block C 90.7sqm) and domestic garage (Block D 188.8 sqm) to accommodate 8 no. tourism self catering short term let apartments at ground level., Permission is also sought to install a secondary treatment system and polishing filter and all associated site works
Shean , Edenderry , Co. Offaly
change the use of the existing stables (Block A 88.6sqm, Block B 339.8sqm, Block C 90.7sqm) and domestic garage (Block D 188.8 sqm) to accommodate 8 no. tourism self catering short term let apartments at ground level. Permission is also sought to install two secondary treatment systems and polishing filters, one of which will be used for Blocks A-C and the other for Block D and all associated site works
Shean , Edenderry , Co. Offaly
(A) 1 NO. NEW STOREY AND HALF TYPE DWELLING HOUSE, (B) 1 NO. NEW DOMESTIC GARAGE, (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) USE EXISTING VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORK
BALLYKILLEEN , EDENDERRY , CO. OFFALY
construction of 1 no. agricultural hay storage shed (215.2sqm) and 1 no. stables (215.2sqm) consisting of 10 stable cubicles and tack room. Permission is also sought for a new agricultural entrance onto the public road and a dung heap (70sqm) and effluent tank and all associated site works
Shean , Edenderry , Co. Offaly
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?