BISHOPSWOOD & TINACRANNAGH , CO. OFFALY

CONDITIONAL

Planning application 2328

Offaly - Offaly County Council

Proposed Development

WORKS ASSOCIATED WITH THE PROPOSED UPRATE OF THE EXISTING 110KV LINE IN THE TOWNLANDS OF BISHOPSWOOD AND TINACRANNAGH, CO. OFFALY. THE PROPOSED DEVELOPMENT (UPRATE) WITHIN THE FUNCTIONAL AREA OF OFFALY COUNTY COUNCIL RELATES TO APPROXIMATELY 1.6KM OF THE 110KV LINE AND COMPRISES:

  1. (1)
    THE REPLACEMENT ("RESTRINGING") OF THE EXISTING OVERHEAD LINE CIRCUIT CONDUCTOR AND WIRES WITH NEW HIGHER CAPACITY CONDUCTOR WIRES INCLUDING INSTALLATION OF A NEW FIBRE COMMUNICATION CONNECTION
  2. (2)
    THE REPLACEMENT OF 1 NO. WOODEN POLESETS AND 1 NO. STEEL MASTS - ANY REPLACEMENT STRUCTURES WILL BE CONSTRUCTED AT, OR IMMEDIATELY ADJACENT TO THE EXISTING STRUCTURES THEY WILL REPLACE. THEY WILL BE ALONG THE SAME ALIGNMENT AS EXISTING, THE HEIGHT DIFFERENCE WILL BE UP TO 4M AND THEY WILL BE OF A GENERALLY SIMILAR APPEARANCE, UNLESS OTHERWISE STATED
  3. (3)
    THE REPLACEMENT OF CROSSARMS AT 1 NO. WOODEN POLESETS
  4. (4)
    THE REPLACEMENT OF HARDWARE AND FITTINGS SUCH AS SUSPENSION CLAMPS, INSULATORS, AND VIBRATION DAMPENERS AT ALL STRUCTURES, AS REQUIRED
  5. (5)
    RE-CAPPING AND REMEDIAL WORKS FOR SHEAR BLOCKS AT 1 NO. STEEL MAST
  6. (6)
    INSTALLATION OF BIRD FLIGHT DIVERTERS
  7. (7)
    ALL ASSOCIATED SITE DEVELOPMENT WORKS, INCLUDING FOUNDATION UPGRADE WORKS AND STRAIN ASSEMBLIES
  8. (8)
    ALL ASSOCIATED TEMPORARY SITE DEVELOPMENT WORKS TO GAIN ACCESS TO THE EXISTING STRUCTURES INCLUDING CLEARANCE OF VEGETATION, DISASSEMBLY AND REASSEMBLY OF GATE POSTS/PIERS AND REMOVAL AND REINSTATEMENT OF EXISTING FENCING;
  9. (9)
    OTHER TEMPORARY ASSOCIATED AND ANCILLARY DEVELOPMENT WORKS REQUIRED FOR THE PURPOSE OF THE UPRATE OF THE EXISTING CIRCUIT, INCLUDING TEMPORARY GUARD POLES, CONSTRUCTION COMPOUNDS, THE INSTALLATION OF SILT TRAPS, SILT FENCES, STONE TRACKS, GROUND PROTECTION MATS AND TEMPORARY WATERCOURSE CROSSINGS. THE PROPOSED DEVELOPMENT IS PART OF A LARGER PROJECT WHICH INCLUDES UPRATE WORKS TO APPROXIMATELY 20KM OF 110KV LINE WITHIN THE FUNCTIONAL AREA OF LAOIS COUNTY COUNCIL FOR WHICH A SEPARATE PLANNING APPLICATION HAS BEEN LODGED WITH LAOIS COUNTY COUNCIL. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED FOR THE PROPOSED DEVELOPMENT
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    31 Jan 2023

  2. Decision due

    27 Mar 2023

  3. Decision: CONDITIONAL

    27 Mar 2023

  4. Grant issued

    4 May 2023

Application Details

Location
BISHOPSWOOD & TINACRANNAGH , CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
3.99 ha

Timeline

Registration Date
31 January 2023Other applications received that week
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
27 March 2023
Grant Date
4 May 2023
Permission Expires
3 May 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

22m
22656N/A20 Dec 2022

(WITH CONSENT & APPROVAL OF THE ELECTRICITY SUPPLY BOARD (ESB)) IS APPLYING TO OFFALY CO.CO & LAOIS CO.CO FOR PERMISSION FOR WORKS ASSOCIATED WITH THE PROPOSED UPRATE OF THE EXISTING 110 KV LINE BETWEEN STRUCTURE AM106 & THE EXISTING EM215 LOCATED AT PORTLAOISE 110 KV SUBSTATION IN THE TOWNLAND OF CLONMINAM, CO.LAOIS. THE PROPOSED DEVELOPMENT IS APPROXIMATELY 21.6 KM LONG AND COMPRISES 112 NO STRUCTURES (90 NO. WOODEN POLESETS & 22 NO. STEEL MASTS). APPROX 1.6 KM OF THE EXISTING CIRCUIT IS LOCATED WITHIN THE FUNCTIONAL AREA OF OCC. THE PROPOSED DEVELOPMENT (UPRATE) WITHIN THE FUNCTIONAL AREA OF OCC. THE PROPOSED DEV.WILL COMPRISE:1)THE REPLACEMENT ("RESTRINGING") OF THE EXISTING OVERHEAD LINE CIRCUIT CONDUCTOR AND WIRES WITH NEW HIGHER CAPACITY CONDUCTOR WIRES INCL INSTALLATION OF A NEW FIBRE COMMUNICATION CONNECTION;2) THE REPLACEMENT OF THE EXISTING EARTHWIRE WITH NEW EARTHWIRE BETWEEN STRUCTURES 204 & 215; 3) THE REPLACEMENT OF 46 NO. WOODEN POLESETS & 4 NO- STEEL MASTS — ANY REPLACEMENT STRUCTURES WILL BE CONSTRUCTED AT, OR IMMEDIATELY ADJACENT TO THE EXISTING STRUCTURES THEY WILL REPLACE. THEY WILL BE ALONG THE SAME ALIGNMENT AS EXISTING, THE HEIGHT DIFFERENCE WILL BE UP TO 4M AND THEY WILL BE OF A GENERALLY SIMILAR APPEARANCE, UNLESS OTHERWISE STATED;4) THE REPLACEMENT OF CROSSARMS AT 20 NO. WOODEN POLESETS;5) THE REPLACEMENT OF HARDWARE AND FITTINGS SUCH AS SUSPENSION CLAMPS, INSULATORS, & VIBRATION DAMPENERS AT ALL STRUCTURES, AS REQ. 6) THE REPLACEMENT OF BAR MEMBERS AT 10 NO. STEEL MASTS;7) RE-CAPPING & REMEDIAL WORKS FOR SHEAR BLOCKS AT 6 NO. STEEL MAST;8) INSTALLATION OF BIRD FLIGHT DIVERTERS BETWEEN STRUCTURES 111 & 113, & BETWEEN STRUCTURES 204 & 215;9) ALL ASSOCIATED SITE DEVELOPMENT WORKS, INCL FOUNDATION UPGRADE WORKS & STRAIN ASSEMBLIES;10) ALL ASSOCIATED WORKS WITHIN THE PORTLAOISE 110 KV SUBSTATION TO ACCOMMODATE THE UPRATED 110 KV OVERHEAD LINE INCL UPRATING OF THE PORTLAOISE BAY IN PORTLAOISE 110 KV SUBSTATION; ALL ASSOCIATED TEMPORARY SITE DEVELOPMENT WORKS TO GAIN ACCESS TO THE EXISTING STRUCTURES INCL CLEARANCE OF VEGETATION, DISASSEMBLY & REASSEMBLY OF GATE POSTS / PIERS & REMOVAL & REINSTATEMENT OF EXISTING FENCING;11) OTHER TEMP ASSOCIATED & ANCILLARY DEV WORKS REQ FOR THE PURPOSE OF THE UPRATE OF THE EXISTING CIRCUIT, INCL TEMP GUARD POLES, CONSTRUCTION COMPOUNDS, THE INSTALLATION OF SILT TRAPS, SILT FENCES, STONE TRACKS, GROUND PROTECTION MATS & TEMP WATERCOURSE CROSSINGS. A NIS HAS BEEN PREPARED FOR THE PROPOSED DEVELOPMENT

THE TOWNLANDS OF BISHOPSWOOD TINACRANNAGH , CO. OFFALY

458m
19482CONDITIONAL11 Oct 2019

A DWELLING HOUSE, GARAGE, NEW SITE ENTRANCE, SEPTIC TANK AND PERCOLATION AREA, AND ALL ASSOCIATED WORKS

BISHOPSWOOD , PORTARLINGTON , CO OFFALY

459m
19463N/A24 Sept 2019

A DWELLING HOUSE, GARAGE, NEW SITE ENTRANCE, SEPTIC TANK AND ALL ASSOCIATED WORKS

BISHOPSWOOD , PORTARLINGTON , CO OFFALY

529m
2360261CONDITIONAL10 Jul 2023

develop as follows: (i) 136 no. battery storage units; (ii) 17 no. MV skids (PCS + MV/LV Transformer solution); (iii) a new site access and onsite access tracks; (iv) electrical and communications cabling; (v) pole-mounted security cameras; (vi) security fencing and security gates; (vii) a temporary construction compound; (viii) all associated and ancillary site development, landscaping and reinstatement works, over a total site area of ca.3.4 hectares. The operational lifetime of the proposed development is 35-years.

Bracklone , Portarlington , Co. Laois

613m
19511REFUSED1 Nov 2019

CONSTRUCTION OF A NEW BUNGALOW, INSTALLATION OF A PROPRIETARY TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED WORKS

BISHOPSWOOD , PORTARLINGTON , CO OFFALY

614m
19437N/A9 Sept 2019

CONSTRUCTION OF A NEW BUNGALOW, INSTALLATION OF A PROPRIETARY TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED WORKS

BISHOPSWOOD , PORTARLINGTON , CO OFFALY

654m
20362CONDITIONAL10 Aug 2020

SINGLE STOREY DWELLING, ENTRANCE, WASTE WATER TREATMENT SYSTEM WITH RAISED POLISHING FILTER AND ALL ASSOCIATED SITE WORKS

BISHOPSWOOD , PORTARLINGTON , CO. OFFALY

697m
20149CONDITIONAL23 Apr 2020

SINGLE STOREY DWELLING, GARAGE, ENTRANCE, WASTE WATER TREATMENT SYSTEM WITH RAISED POLISHING FILTER AND ALL ASSOCIATED SITE WORKS

BISHOPSWOOD , PORTARLINGTON , CO. OFFALY

764m
17619CONDITIONAL21 Nov 2017

demolish fire damaged dwelling, construction of two storey (contemporary style) private residence, single storey domestic garage, connection to residence with glazed link, replacement of existing septic tank with wastewater treatment system and polishing filter and auxillary site works

Lea Road , Portarlington , Co. Laois

853m
2460195CONDITIONAL30 May 2024

new single storey 5 bedroom dwelling and associated domestic garage including on site tertiary treatment System & infiltration/ treatment area, new site entrance and all ancillary site works at Bishopswood, Portarlington, Co. Offaly.

Bishopswood , Portarlington , Offaly

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?