← Back to search

ERRY ARMSTRONG BALLYCUMBER RD , CLARA , CO. OFFALY

CONDITIONAL

Planning application 23334

Offaly - Offaly County Council

Proposed Development

A SOLAR PANEL ARRAY CONSISTING OF UP TO 500KWP (C.1968M2) OF SOLAR PANELS FIXED TO METAL FRAMES AND FIXED TO THE GROUND, UNDERGROUND CABLE DUCTS, SECURTIY FENCING, CCTV MASTS, SECURITY LIGHTING AND ALL ASSOCIATED WORKS

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    18 Jul 2023

  2. Further information requested

    8 Sept 2023

  3. Further information received

    3 Oct 2023

  4. Decision: CONDITIONAL

    25 Oct 2023

  5. Decision due

    30 Oct 2023

  6. Grant issued

    29 Nov 2023

Application Details

Location
ERRY ARMSTRONG BALLYCUMBER RD , CLARA , CO. OFFALY
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.782 ha

Timeline

Registration Date
18 July 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 October 2023
Grant Date
29 November 2023
Permission Expires
28 November 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
23308N/A29 Jun 2023

A SOLAR PANEL ARRAY CONSISTING OF UP TO 500KWP (C.1968M2) OF SOLAR PANELS FIXED TO METAL FRAMES AND PLACED ON THE GROUND, UNDERGROUND CABLE DUCTS, SECURTIY FENCING, CCTV MASTS, SECURITY LIGHTING AND ALL ASSOCIATED WORKS

ERRY ARMSTRONG BALLYCUMBER ROAD , CLARA , CO. OFFALY

1m
23267N/A8 Jun 2023

A SOLAR PANEL ARRAY CONSISTING OF UP TO 500KWP (C.1968M2) OF SOLAR PANELS FIXED TO METAL FRAMES AND PLACED ON THE GROUND, UNDERGROUND CABLE DUCTS, SECURTIY FENCING, CCTV MASTS, SECURITY LIGHTING AND ALL ASSOCIATED WORKS

BALLYCUMBER ROAD , CLARA , CO. OFFALY R35 PK24

79m
22237REFUSED11 May 2022

EXISTING GROUND FLOOR EXTENSION TO REAR AND SIDE OF EXISTING HOUSE AS CONSTRUCTED AND ALL ASSOCIATED SITE WORKS

142 LAKEVIEW , CLARA , CO. OFFALY

79m
22454CONDITIONAL31 Aug 2022

THE REMOVAL OF AN EXISTING BOUNDARY WALL ACROSS THE FRONT BOUNDARY OF THE SITE CREATING A NEW ENTRANCE TOGETHER WITH ALL ASSOCIATED SITE WORKS

142 LAKEVIEW , CLARA , CO. OFFALY

80m
22410N/A15 Aug 2022

THE REMOVAL OF AN EXISTING BOUNDARY WALL ACROSS THE FRONT BOUNDARY OF THE SITE CREATING A NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS

142 LAKEVIEW , CLARA , CO. OFFALY

80m
2660094CONDITIONAL25 Feb 2026

existing ground floor extension to rear and side of existing dwelling as constructed and all associated site works

142 Lake View , Clara , Co. Offaly

80m
2560668N/A19 Dec 2025

of existing ground floor extension to rear and side of existing dwelling as constructed and all associated site works

142 Lake View , Clara , Co. Offaly

90m
2560043CONDITIONAL24 Feb 2025

a 3-bed, 2-storey dwelling, attached to the gable of existing house at No.52 Marian Square, with new vehicular access and on-site car parking and all associated site works

52a Marian Square , Clara , County Offaly

344m
2560140N/A24 Apr 2025

existing potable water borehole for use in the commercial production of water at proposed new bottling plant together with all associated site works

Clashawaun , Clara , Co. Offaly

345m
2460489N/A6 Dec 2024

partial “change of use” from existing Leisure Centre to a Water Bottling Facility. The development will include the following: Raw Materials Store, Finished Products Store, Packing and Unpacking Areas, Clean Room/Bottling Area, Small Laboratory, various Office Areas and Welfare Facilities together with all associated site development works. Permission is also sought for the construction of a new pump house building and all associated pumping equipment (to replace existing temporary demountable pump house structure) and all associated site works. Retention permission is also sought for the temporary demountable pump house structure

Clashawaun , Clara , Co. Offaly

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?