← Back to search

Saint Mary’s O’Moore Street , Tullamore , Co. Offaly

N/A

Planning application 2460403

Offaly - Offaly County Council

Proposed Development

a). Construct a new 2 storey extension to the rear of the existing dwelling house; b). renovate the existing dwellinghouse including elevational changes; c). demolish existing rear extension to dwelling house d). construction of a garden shed (e). all associated site works and services.

View the full application file on the council's planning portal →

Application Details

Location
Saint Mary’s O’Moore Street , Tullamore , Co. Offaly
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.02 ha
Floor Area
208.7 sq m
Residential Units
1

Timeline

Registration Date
11 October 2024
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2460508N/A13 Dec 2024

a). Construct a new 2 storey extension to the rear of the existing dwelling house; b). renovate the existing dwellinghouse including elevational changes; c). demolish existing rear extension to dwelling house d). construction of a garden shed (e). all associated site works and services.

Saint Mary’s O’Moore Street , Tullamore , Co. Offaly R35EH66

0m
2560077CONDITIONAL18 Mar 2025

a) Construct a new 2 storey extension to the rear of the existing dwelling house / derelict structure; b). renovate the existing dwellinghouse / derelict structure; including elevational changes; c). demolish existing rear extension to dwelling house / derelict structure; d). construction of a garden shed (e). all associated site works and services.

Saint Mary’s O’Moore Street , Tullamore , Co. Offaly

7m
2560035CONDITIONAL12 Feb 2025

the elevational and layout changes to the existing house previously granted under planning permission reference TU282895

O'Moore Street , Tullamore , Co Offaly

43m
2638CONDITIONAL23 Apr 2026

AN EXISTING SINGLE STOREY EXTENSION TO THE REAR OF EXISTING DWELLING AND FULL PLANNING PERMISSION FOR THE ERECTION OF A NEW 2 STOREY EXTENSION TO THE REAR OF EXISTING DWELLING

11 O'MOORE STREET , TULLAMORE , CO.OFFALY

54m
2118CONDITIONAL21 Jan 2021

RECONSTRUCTION AND EXTENSION TO HOUSE. THIS IS A PROTECTED STRUCTURE REF. 23-312, VICTORIA TERRACE

VICTORIA TERRACE O'MOORE STREET , SPOLLANSTOWN , TULLAMORE CO. OFFALY

61m
23361CONDITIONAL15 Aug 2023

THE CONSTRUCTION OF A TWO-STOREY REAR EXTENSION (30 SQ M) ADJOINING THE EXISTING REAR EXTENSION TO THE EXISTING PROTECTED STRUCTURE AND ALL ASSOCIATED SITE WORKS AT THE ABOVE ADDRESS. THE EXISTING DWELLING IS A PROTECTED STRUCTURE RPS NO. 23-311.

BOW HOUSE O'MOORE STREET , TULLAMORE , CO. OFFALY R35 X3T0

65m
21315CONDITIONAL24 May 2021

CHANGE OF USE FROM DWELLING HOUSE TO OFFICES. THIS IS A PROTECTED STRUCTURE

4 CORMAC STREET , TULLAMORE , CO. OFFALY

73m
21112N/A9 Mar 2021

EXTENSION & ALTERATIONS TO THE REAR OF EXSTING TOWN HOUSE AND ALL ANCILLARY SITE WORKS. THE EXISTING DWELLING IS A PROTECTED STRUCTURE LISTED UNDER OFFALY COUNTY COUNCIL RECORD OF PROTECTED STRUCTURES (RPS 23-397)

EARL HOUSE O'MOORE STREET , TULLAMORE CO. OFFALY , R35H2C6

73m
21173CONDITIONAL1 Apr 2021

EXTENSION & ALTERATIONS TO THE REAR OF EXISTING TOWN HOUSE AND ALL ANCILLARY SITE WORKS. THE EXISTING DWELLING IS A PROTECTED STRUCTURE -RPS 23-397 LISTED UNDER THE TULLAMORE TOWN & ENVIRONS DEVELOPMENT PLAN 2010-2016 (EXTENDED UNTIL 2020)

EARL HOUSE O'MOORE STREET TULLAMORE , CO. OFFALY , R35 H2C6

75m
1936CONDITIONAL1 Feb 2019

1) RETENTION OF CONVERTED 2 STOREY OFFICE BUILDING AT THE REAR OF EXISTING OFFICE PREMISES, 2) RETENTION PERMISSION TO RETAIN GROUND FLOOR OFFICE EXTENSION TO THE REAR OF EXISTING OFFICE PREMISES AND REAR 2 STOREY CONVERTED OFFICE BUILDING, AND ALL ASSOCIATED SITE WORKS. THE WORKS ARE WITHIN THE CURTILAGE OF PROTECTED STRUCTURE, REFERENCE NUMBER 23-376

5 CORMAC STREET , TULLAMORE , CO OFFALYR35 K821

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?