Tinamuck West , Moate , Co.Offaly

CONDITIONAL

Planning application 2560428

Offaly - Offaly County Council

Proposed Development

The development will consist of permission to demolish part of, alter, renovate and extend existing dwelling. Permission is also sought to construct a garage, relocate existing entrance, install a new wastewater treatment system and polishing filter & decommission existing septic tank and all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Sept 2025

  2. Decision: CONDITIONAL

    7 Nov 2025

  3. Decision due

    11 Nov 2025

  4. Grant issued

    15 Dec 2025

Application Details

Location
Tinamuck West , Moate , Co.Offaly
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
0.235 ha
Floor Area
273.5 sq m
Residential Units
1

Timeline

Registration Date
17 September 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
7 November 2025
Grant Date
15 December 2025
Permission Expires
14 December 2030

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2560420N/A12 Sept 2025

to demolish part of, alter, renovate and extend existing dwelling. Permission is also sought to construct a garage, relocate existing entrance, install a new wastewater treatment system and polishing filter & decommission existing septic tank and all associated site works.

Tinamuck West , Moate , Co.Offaly

304m
22267CONDITIONAL27 May 2022

CONSTRUCTION OF A FRONT, SIDE AND REAR EXTENSION INCLUDING ALTERATIONS TO EXISTING OPES, TO EXISTING DWELLING HOUSE, DECOMMISSIONING OF EXISTING SEPTIC TANK AND INSTALLATION OF A SINGLE DWELLING TREATMENT SYSTEM AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

TINAMUCK EAST , MOATE , CO. OFFALY N37 Y521

474m
17479N/A5 Dec 2017

THE CONSTRUCTION OF A THREE BEDROOM DWELLING AND GARAGE ALONG WITH EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA. THE APPLICATION WILL ALSO CONSIST OF ALL ASSOCIATED SITE-WORKS, LANDSCAPING AND DRAINAGE

TINAMUCK , TUBBER , CO. OFFALY

476m
1822CONDITIONAL19 Jan 2018

THE CONSTRUCTION OF A THREE BEDROOM DWELLING AND GARAGE ALONG WITH EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA. THE APPLICATION WILL ALSO CONSIST OF ALL ASSOCIATED SITE-WORKS, LANDSCAPING AND DRAINAGE

TINAMUCK WEST , TUBBER , CO. OFFALY

534m
17333CONDITIONAL7 Sept 2017

THE CONSTRUCTION OF (A) 1 NO. TWO-STOREY SINGLE FAMILY HOME TOGETHER WITH ALL ASSOCIATED SERVICES AND PROPRIETARY EFFLUENT TREATMENT TANK AND POLISHING FILTER, (B) ALTERATION AND CONVERSION OF EXISTING BUNGALOW, (ADJACENT TO ROADWAY), FROM RESIDENTIAL USE TO GARAGE, STORE AND OUTBUILDINGS, (C) ALTERATIONS TO LOCATION OF EXISTING VEHICULAR ENTRANCE UNTO PUBLIC ROAD AND ALL OTHER ANCILLARY SITE WORKS

TINAMUCK EAST , TOBER , MOATE CO. OFFALY

1.3km
22468REFUSED9 Sept 2022

CONSTRUCTION OF A TWO BEDROOM DWELLING AND GARAGE. THE APPLICATION WILL ALSO INCLUDE AN EFFLUENT TREATMENT SYSTEM WITH PERCOLATION AREA AND ALL ASSOCIATED SITE-WORKS, BOUNDARY TREATMENTS AND DRAINAGE

KILFOYLAN TOBER , MOATE , CO. OFFALY

1.5km
177219CONDITIONAL4 Dec 2017

The erection of an agricultural fodder shed in existing farm yard and all ancillary works on farm

Ballynamuddagh , Moate , Co Westmeath

1.5km
19600CONDITIONAL17 Dec 2019

DWELLING HOUSE, THE SITE BOUNDARIES AS CONSTRUCTED AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

MOOROCK , BALLYCUMBER , TULLAMORE CO OFFALY

1.6km
2445CONDITIONAL22 Apr 2024

THE ERECTION OF DWELLING HOUSE WITH PROVISION FOR FUTURE DEVELOPMENT OF ATTIC, INSTALLATION OF EFFLUENT WASTE WATER TREATMENT SYSTEM INCLUDING PERCOLATION SYSTEM, AND ALL ANCILLARY WORKS

KILFOYLAN , TUBBER , CO. OFFALY

1.6km
22433CONDITIONAL25 Aug 2022

CONSTRUCTION OF DWELLING HOUSE, DOMESTIC GARAGE, EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA

KILFOYLAN , TUBBER , CO. OFFALY

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?