live from the council registerThis application is on Offaly County Council's own register and has not yet reached the national planning dataset, which runs a fortnight or more behind. Some details, such as the map and site boundary, appear once it does.
Proposed Development
the following:
- (i)EirGrid compound comprising EirGrid control building and external Air Insulated Switchgear (AIS)
- (ii)Independent Power Producer (IPP) compound, adjoining the north-western area of the proposed substation, comprising IPP control building, external grid transformer and AIS, and an underground electrical connection to the energy storage development permitted under planning application Ref. 2460289
- (iii)underground 110kV electrical connection from the proposed substation to the existing Derryiron 110kV transmission node, including cabling in the public road (L10093-2)
- (iv)underground 110kV electrical connection from the proposed substation to underground transmission cable in the public road (L10093-2) consented under ABP-309491-21
- (v)new vehicular access road (“spine road”) connecting to the RGEP road network, providing access to the proposed 110kV substation, revised access arrangements to the development permitted under planning application Ref. 2460289, and planning application Ref. 20238
- (vi)new foul sewer line, serving the proposed 110kV substation and the development permitted under planning applications Ref. 2460289 and Ref. 20238, discharging to the existing local public network
- (vii)removal of existing disused medium voltage substation and ancillary items,
- (viii)all associated civil engineering and electrical engineering works, including underground electrical cables and ducting, temporary construction compound, surface water and foul water drainage, landscaping, lighting and security fencing
Application Details
- Location
- Clonin, Coolcor, Rhode, Co. Offaly
- Applicant
- N/A
- Application Type
- N/A
- Planning Authority
- Offaly County Council
Timeline
- Registration Date
- N/A
- Status
- N/A
- Decision
- Pending