← Back to search

Galros East Whigsborough Ballycollin , and Eglish , County Offaly

N/A

Planning application 2660563

Offaly - Offaly County Council

Proposed Development

RENEWABLE ENERGY DIRECTIVE III (RED III) DEVELOPMENT.The proposed development (to be known as ‘Cush Wind Farm Phase II’) for which planning permission is sought will comprise: I.Three (3 no.) wind turbines with an overall ground-to-blade tip height ranging from 199.1 metres to 200 metres, a rotor diameter ranging from 158 metres to 175 metres, and a hub height ranging from 111.6 metres to 120.9 metres; II. Associated turbine foundations, crane hardstanding areas and temporary turbine component storage and assembly areas; III. Approximately 1.7 kilometres of new internal wind farm access tracks; IV.An electrical switch room building with a gross floor area of approximately 96.2 square metres, within a compound of approximately 429 square metres, enclosed by approximately 2.6 metre high palisade fencing and gates; V. Underground electrical and communications cabling connecting the proposed turbines to the adjoining permitted Cush Wind Farm (An Coimisiún Pleanála Reference ABP-318816-24) and to the proposed electrical switch room; VI. One (1 no.) site entrance from the L300321 local road to serve the electrical switch room; VII. Use of the construction phase site entrance from the N62 national road, the operation phase site entrance from the L300321 local road, and the temporary construction compounds permitted as part of Cush Wind Farm; VIII. All associated and ancillary site development, excavation, construction, landscaping, spoil deposition and reinstatement works, including the provision of site drainage infrastructure and environmental mitigation measures; and IX. A 35-year operational life from the date of commissioning of the entire proposed development. The site of the proposed development has a total area of approximately 87 hectares. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development and accompany the planning application. The EIAR and NIS also assess the proposed development in combination with the following off-site associated infrastructure and works: •A grid connection comprising approximately 5 kilometres of 33 kV underground electricity line connecting the proposed electrical switch room in Eglish to the national electricity network, through the townlands of Eglish, Ballynaguilsha, Shanacloon, Cloncarban, Clonbeale Beg Glebe and Mullanafawnia, County Offaly. • Accommodation works along the turbine component haul route from the Port of Galway to the win

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    28 Oct 2026

  2. Decision due (upcoming)

    22 Dec 2026

Application Details

Location
Galros East Whigsborough Ballycollin , and Eglish , County Offaly.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Offaly County Council
Site Area
87.12 ha

Timeline

Registration Date
28 October 2026Other applications received that week
Status
NEW APPLICATION
Decision
N/A
Decision Due
22 December 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

1.2km
2660404CONDITIONAL30 Jul 2026

an extension and alterations to an existing dwelling, new detached garage, new site entrance, treatment system and percolation area and all associated site works

Whigsborough , Fivealley , Birr Co. Offaly

1.3km
22401N/A10 Aug 2022

(I) THE CONTINUED OPERATION OF THE EXISTING 80 METRE METEOROLOGICAL MAST, WHICH WAS ERECTED AS EXEMPTED DEVELOPMENT IN ACCORDANCE WITH CLASS 20A, SCHEDULE 2, OF THE PLANNING AND DEVELOPMENT REGULATIONS 2001 (AS AMENDED), AND ALL ANCILLARY INFRASTRUCTURE AND ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS; AND (II) THE INCREASE IN HEIGHT OF THE EXISTING METEOROLOGICAL MAST FROM 80 METRES TO A HEIGHT OF 100 METRES. THE OPERATIONAL LIFETIME OF THE PROPOSED DEVELOPMENT WILL BE UP TO FIVE YEARS. THIS PLANNING APPLICATION IS ACCOMPANIED BY AN APPROPRIATE ASSESSMENT SCREENING REPORT

GALROS WEST , COUNTY OFFALY

1.3km
22444CONDITIONAL29 Aug 2022

(I) THE EXISTING 80 METRE METEOROLOGICAL MAST, WHICH WAS ERECTED AS EXEMPTED DEVELOPMENT IN ACCORDANCE WITH CLASS 20A, SCHEDULE 2, OF THE PLANNING AND DEVELOPMENT REGULATIONS 2001 (AS AMENDED), AND ALL ANCILLARY INFRASTRUCTURE AND ASSOCIATED SITE DEVELOPMENT AND REINSTATEMENT WORKS; AND (II) PERMISSION TO INCREASE THE HEIGHT OF THE EXISTING METEOROLOGICAL MAST FROM 80 METRES TO A HEIGHT OF 100 METRES. THE OPERATIONAL LIFETIME OF THE PROPOSED DEVELOPMENT WILL BE UP TO FIVE YEARS. THIS PLANNING APPLICATION IS ACCOMPANIED BY AN APPROPRIATE ASSESSMENT SCREENING REPORT

GALROS WEST FIVEALLEY , BIRR , CO. OFFALY

1.6km
19485CONDITIONAL11 Oct 2019

CONSTRUCTION OF A NEW DWELLING HOUSE, FORM NEW ENTRANCE, INSTALL EFFLUENT TREATMENT UNIT WITH PERCOLATION AREA & ALL ASSOCIATED SITE WORKS

GALROS EAST , FIVEALLEY , BIRR CO OFFALY

1.7km
21651CONDITIONAL20 Oct 2021

CONSTRUCTION OF A NEW SINGLE STOREY DWELLING, NEW VEHICULAR ENTRANCE, DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS, AND ALL ASSOCIATED SITE WORKS

EGLISH FIVEALLEY , BIRR , CO. OFFALY

1.7km
2371CONDITIONAL23 Feb 2023

DOMESTIC GARAGE, FUEL SHED AND ALL ASSOCIATED SITE WORKS AND SERVICES

COOLOGE FIVEALLEY , BIRR , CO. OFFALY

1.9km
2660504N/A25 Sept 2026

A) demolition of the existing side extension; B) construction of a new front porch; and C) construction of a new two storey extension to the rear and a single-storey extension to the side. Permission is also sought for a new treatment system and percolation area and a new site entrance together with all associated site works.

Coologe , Fivealley , Birr

1.9km
2660515N/A30 Sept 2026

A) demolition of the existing side extension; B) construction of a new front porch; and C) construction of a new two storey extension to the rear and a single-storey extension to the side. Permission is also sought for a new treatment system and percolation area and a new site entrance together with all associated site works

Coologe , Fivealley , Birr

1.9km
2167CONDITIONAL16 Feb 2021

CONSTRUCTION OF A DWELLING HOUSE, DETACHED DOMESTIC GARAGE, INSTALLATION OF SEPTIC TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS

COOLOGE FIVEALLEY , BIRR , CO. OFFALY

1.9km
22548N/A21 Oct 2022

AN EXTENSION TO THE EXISTING DWELLING, ALTERATIONS TO THE EXISTING DWELLLING AND ALL ASSOCIATED SITE WORKS

BOOLINARIG BIG , BIRR , CO. OFFALY

Affected by this application?

Open for submissions
9days left to make a submission

Observations close on Tuesday 1 December 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.

Check if you have grounds — free

Two questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?