Ballyoughter , Ballaghaderreen , Co. Roscommon
CONDITIONALPlanning application 2460120
Roscommon - Roscommon County Council
Proposed Development
Permission for the following: (1) Construction of a new domestic garage with all associated site works at
View the full application file on the council's planning portal →Application Timeline
Application received
11 Mar 2024
Decision: CONDITIONAL
3 May 2024
Decision due
5 May 2024
Grant issued
11 Jun 2024
Application Details
- Location
- Ballyoughter , Ballaghaderreen , Co. Roscommon.
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Roscommon County Council
- Site Area
- 0.333 ha
- Floor Area
- 48 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 11 March 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 3 May 2024
- Grant Date
- 11 June 2024
- Permission Expires
- 10 June 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Permission for the following: (1) Construction of a new detached dwelling house; (2) Proposed effluent treatment system and percolation area with all associated site works at
Ballyoughter , Ballaghaderreen , Co. Roscommon
for the development of a grid system service facility within a total site area of up to 0.55 hectares , to include 1 no. single storey electrical substation building, 1 no. customer switchgear container, 15 no. electrical inverter/transformer station modules (SKIDS) 10 no. containerised battery storage modules on concrete support structures, 20 no. heating, ventilation and air conditioning units (HVAC units) access tracks and upgraded site entrance, associated electrical cabling an ducting, security gates, perimeter security fencing, CCTV security monitoring system, culvert, landscaping works and all associated ancillary infrastructure on land at
Ballyoughter , Ballaghadereen , Co. Roscommon
Permission is sought for Grid System Services Limited, applying for a 10 year permission to develop an Energy Storage System, which will connect to the nearby ESB Tonroe 110kV Electricity Substation on land at Ballyoughter, Ballaghaderreen, County Roscommon. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at
Ballyoughter , Ballaghaderreen , Co. Roscommon.
Permission is sought for Grid System Services Limited, applying for a 10 year permission to develop an Energy Storage System , which will connect to the adjoining ESB Tonroe 110kV Electricity Substation on land at Ballyoughter, Ballaghaderreen, County Roscommon. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c.2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at
Ballyoughter , Ballaghaderreen , Co. Roscommon.
Permission is sought for Grid System Services Limited, applying for a 10-year permission to develop an Energy Storage System, which will connect to the adjoining ESB Tonroe 110kV Electricity Substation. The proposed development will have a projected life span of 35 years. The development will consist of the construction of 1) enclosed battery energy storage system within a site compound on a total of up to c. 2.33 hectare site, to include: 1 no. single storey 110kV customer substation, control and switch rooms; up to 44 battery blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); up to 11 transformer and inverter units; including access tracks and site entrance along existing roadway; associated electrical cabling and ducting; security gates, 2.6m palisade perimeter security fencing; CCTV system; landscaping works and all other associated ancillary infrastructure at
Ballyoughter , Ballaghaderreen , Co. Roscommon.
Permission for development at a c.1.6 ha site on ESB lands at the existing Tonroe 110kV Substation. The development will consist of a physical extension of c. 313 sq.m to the existing electricity substation compound and will include: (a) Site clearance works including the partial removal of: 1) Existing palisade fence along the north-eastern compound boundary; and 2) Existing vegetation along the north-eastern compound boundary. (b) Provision of new electrical plant and equipment including: 1) 1 No. prefabricated MV GIS module and foundation (c. 32m2 and c. 4.7m high); 2) 2 No. 38/20 kV 15 MVA transformers, associated bunds and firewall (c. 15m2 and 5.1 m high); 3) Extension of existing 38kV busbar with 2 no. new 38kV cubicles (c. 6.5m high); 4) Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; and 5) Site development works including provision of extension of lighting; internal access road; new fencing; provision of site services including drainage; and all other ancillary works at
Kilcolman and Ballyoughter , Ballaghaderreen , Co. Roscommon.
for development of: (a) The alteration and re-roofing of the existing dwelling house, including raising the ridge level similar to that of the adjacent dwelling house, in turn providing additional first floor accommodation. Also the improvement of the on site parking/turning. (b) The retention of the existing domestic garage/shed together with all ancillary site works at
28 Kilcolman Estate , Ballaghaderreen , Co. Roscommon
to 1. demolish existing house and to construct replacement house on similar footprint. 2. to construct new domestic garage and new site entrance and all ancillary site development works at
Kilcolman , Ballaghaderreen , Co. Roscommon
for the construction of a 317 square metre detached single storey 'Log Cabin Type' Childcare Facility to be located on the site of the existing Emergency Reception and Orientation Centre (EROC) with all associated site works at
Abbeyfield Hotel , Sligo Road , Kilcolman Townland
Planning Permission for the construction of a two storey extension to the Abbeyfield Hotel EROC centre to provide additional accommodation with a single storey corridor link to the existing EROC Centre, an Astro Turf Pitch, a Play Area and all associated site development works at
Sligo Rd Kilcolman Td , Ballaghaderreen , Co. Roscommon
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?