Yew Point Hodson Bay , Barrymore Kiltoom , Athlone Co. Roscommon

CONDITIONAL

Planning application 2560020

Roscommon - Roscommon County Council

Proposed Development

Permission for minor amendments to the sustainable eco-tourism project previously approved under Planning Ref. No. PD/23/60204. The development, situated on a 59.71-hectare (147.55-acre) site, is a low-density visitor destination designed with minimal environmental impact, utilizing renewable energy, sustainable materials, and reversible construction methods. The proposed amendments are:

  1. a.
    minor relocation southward by c.7 metres of the permitted Environmental Induction Building with bicycle parking (8 spaces) relocated adjacent to the building
  2. b.
    A small increase in the building’s floor area (from the permitted area of c.111 sq.m. to c.142 sq.m.), to include a café/restaurant (c.107 sq.m.) area, kitchen (c.28 sq.m.) and storage (c.6 sq.m.) to serve guests and staff only, enhancing the environmental education experience, with associated amendments to the building’s elevations.
  3. c.
    The addition of an external covered walkway (c.86 sq.m.) connecting the Environmental Induction Building as amended to the existing WC/shower facilities building. The application is supported by an addendum Natura Impact Statement (NIS) to the original NIS submitted under Ref. No. PD/23/60204 at
View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Jan 2025

  2. Decision: CONDITIONAL

    13 Mar 2025

  3. Decision due

    17 Mar 2025

  4. Grant issued

    17 Apr 2025

Application Details

Location
Yew Point Hodson Bay , Barrymore Kiltoom , Athlone Co. Roscommon.
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Roscommon County Council
Site Area
59.71 ha

Timeline

Registration Date
21 January 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
13 March 2025
Grant Date
17 April 2025
Permission Expires
15 February 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

10m
2360204CONDITIONAL3 Nov 2023

Permission for development consisting of: a) Conservation and protection of all existing woodland areas and the natural environment as a fundamental objective of the development, b) Regeneration of the former woodland areas towards the centre of the Yew Point peninsula, now largely depleted following generations of agricultural activity, with the extensive planting of native tree species of Irish provenance, c) Construction of 36 no. timber eco-cabins providing 12 no. family cabins and 24 no. two-person cabins raised on stilts above ground levels, to conserve existing ground conditions and preserve through routes for movement of wildlife. The cabins arranged in five clusters confined to the southern portion of the lands, carefully respond to their specific site context, respecting existing woodlands and topographical conditions, d) Provision of 4 no. timber guest shelters distributed across the site, and a covered shelter to facilitate the charging and storing of electric golf buggies, e) Extension and refurbishment of the existing building/shop, with minor internal reconfigurations and the upgrading of the exterior with slatted timber screens, new doors and windows and a covered deck area, f) Construction of an Environmental Induction Area to facilitate the immersion of guests in environmental topics and the principles of fully sustainable living, and inform them, specifically, on the ecology and biodiversity of the Yew Point/Lough Ree area, g) All cabins and other new structures are designed to minimise environmental impact and disruption through the off-site fabrication of the main components, careful siting and reversible forms of construction. Materials of low embedded carbon are to be used and operational carbon is minimised through the use of renewable sources of energy. Surface water run-off is dealt with by strategically located Rain Gardens to filter and slowly release rainwater into the ground, h) Sustainable energy sources with the use of renewable solar photovoltaic panels as the primary source of energy generation for the entire development, i) Provision of slatted timber entrance gate structure to provide vehicular access and a covered pedestrian entrance with related signage, j) Construction of 1 no. reinforced "Grass-crete" surfaced car park at the existing site entrance providing 48 no. car parking spaces in total (1 no. car parking space per cabin and 12 no. staff car parking spaces). The car parking provision includes 10 no. EV charg

Yew Point Hodson Bay , townlands of Barrymore Kiltoom Athlone , Co. Roscommon

861m
2560175N/A18 Apr 2025

Retention Permission and Permission: retention for the development of a maintained and improved chalet structure, boundary treatment, gated access and a proposed new level access on a site of 0.11 Ha. The retained works and development are as defined and confined to ABP Reference: 313742, refurbished chalet, boundary and gate. The new proposed development comprises the replacement of the existing level access stone finish and its removal and replacement with the insertion of a modular, cellular grasscrete parking surface at

Chalet 3 Barry More Townland , Hodson Bay , Athlone

1.1km
2262CONDITIONAL9 Feb 2022

Permission for development consisting of the following recreational facilities: Part A. Landside installations details of which are outlined below: 1. 2 No. marquees for use as a reception and wet suit distribution, measuring 9m X 9m X 6.6m high and 21m X 15m X 7.8M high; 2. 1 No. 9m X 9m X 3.8m high disabled changing marquee; 3. 1 No. 9m X 9m X 4.7m high safety briefing marquee; 4. 9 No. 12m X 6m X 3.3m high changing marquees; 5. 3 No. 12m X 15M X 5m high marquees for use as a customer observation area, a dining area and a gift shop; 6. 1 No. 4m X 8m X 3.7m high café marquee; 7. 2 No. 3m X 6m X 3m high prefabricated office buildings; 8. Outdoor showers 5m X 6m; 9. Realignment of existing fencing. All the marquees will be coloured white. The proposed development includes all ancillary and enabling site works. The changing rooms and coffee shop will be connected by gravity to existing public sewerage. Part B. Waterside Installations, details of which are outlined below: 1. Main waterpark consisting of inflatable platforms, slides and climbing walls with overall dimensions of 35m X 40m X 8m high; 2. Inflatable junior waterpark measuring 8m X 15m X 5.2 high; 3. No. 1 inflatable water slide measuring 15m X12m X12m high; 4. No. 1 inflatable water slide measuring 31m x 22m x 16m high; 5. No. 1 inflatable water slide measuring 20m X 8m X 13m high; 6. No. 1 inflatable water slide measuring 32m X 16m X 13m high; 7. 50 No. cylindrical shaped inflatable safety booms 4m by .4m diameter. All of the above installations are inflatable PVC structures which are permanently fixed to the lake bed using ropes and anchors. Proposed Operation Periods: It is intended that the overall facility will be operational annually between the 15th March and the 15th of October. The facility will operate during daylight hours only and will not operate past 21:00 hours on any day (a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application) at

Barrymore Townland , Hodson Bay , Kiltoom Athlone

1.8km
2360194CONDITIONAL27 Oct 2023

Permission for the construction of a new two storey dwelling (280 sqm) and associated ancillary works to facilitate the development including site development works, parking, drainage, foul connection to the mains drainage and landscaping at

Hodson's Bay , Barrymore Townland Athlone , Co. Roscommon

1.9km
2347REFUSED17 Feb 2023

Permission for the construction of a single new dwelling including a new connection to the public mains, all associated landscaping and earthworks and all associated drainage at

Hodson Bay , Barrymore , Athlone

1.9km
2334N/A10 Feb 2023

Permission for development consisting of the construction of a single new dwelling including a new connection to the public mains, all associated landscaping and earthworks and all associated drainage at

Hodson's Bay , Barrymore , Athlone