← Back to search

Castleore , Ballintogher , Co. Sligo

CONDITIONAL

Planning application 18464

Sligo - Sligo County Council

Proposed Development

Development consisting of demolition of existing hay shed and construction of a new 3 bay dry bed sheep shed as well as a dungstead together with all ancillary site works and services.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Nov 2018

  2. Decision: CONDITIONAL

    25 Jan 2019

  3. Decision due

    1 Feb 2019

  4. Grant issued

    27 Feb 2019

Application Details

Location
Castleore , Ballintogher , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.784 ha

Timeline

Registration Date
29 November 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 January 2019
Grant Date
27 February 2019
Permission Expires
26 February 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
181N/A10 Jan 2018

for the development consisting of the demolition of existing hay shed and construct a new 3 bay dry bed sheep shed as well as a dungstead together with all ancillary site works and services

Castleore , Ballintogher , Co. Sligo

434m
2290CONDITIONAL9 Mar 2022

development consisting of Planning Permission to Extend & Renovate existing dwelling house. Planning Permission to Retain a Biocycle effluent treatment unit and raised percolation bed in lieu of a septic tank and puraflo effluent treatment unit (which is at variance with previous permission granted under PL 03/127)

Dromore Td , ED Ballintogher East , Co. Sligo

542m
2360087CONDITIONAL25 Apr 2023

construct new detached dwelling house with onsite wastewater treatment system, detached domestic garage, connection to public services and all associated site works

Correagh , Ballintogher , Co. Sligo

1.2km
20125CONDITIONAL27 Apr 2020

PP & PR - development consisting of the following: retention of a change of use from commercial use to a child care facility and all ancillary services. We also apply for full planning permission to construct a car parking facility on the site

Tiratick , Ballintogher , Co Sligo

1.3km
22294CONDITIONAL6 Sept 2022

development consisting of construction of single storey type domestic dwelling with liveable accommodation in the roof space, a new site entrance, construct a domestic waste water treatment system to EPA code of practice standards together with all associated ancillary works

Cartronhugh , Ballintogher , Co. Sligo

1.3km
15132CONDITIONAL22 Apr 2020

development consisting of the construction of a domestic garage together with all associated ancillary works

Altvelid , Ballintogher , Co. Sligo

1.3km
20130CONDITIONAL30 Apr 2020

Development consisting of the following works: 1. Demolition of existing shelter structure located to the east of existing school; 2. Construction of a new classroom and link corridor extension to the east and north sides of the existing school including signage; 3. Provision of alterations to staffroom block to west side of existing school; 4. Elevation changes to the existing school; 5. Provision of new access ramp and external steps to front (north) of school and provision of a new playground to rear (south) of school; 6. Connection of foul drainage to existing public sewer, connection of surface water into existing system on site and all associated site works

Kingsfort , Ballintogher , Co Sligo

1.3km
17305CONDITIONAL9 Aug 2017

for development consisting of the construction of an additional temporary prefab type classroom, connect to all public services and construct a new school sign on the front gable of the school together with all associated ancillary works

Kingsfort , Ballintogher , Co. Sligo

1.3km
18105CONDITIONAL5 Apr 2018

Development consisting of the construction of five, two storey detached dwelling houses on existing vacant sites located to the east of existing house number six.

Kingsfort Manor , Ballintogher , Co Sligo

1.4km
2247CONDITIONAL11 Feb 2022

Development consisting of the following works: 1. Retention of existing first floor attic conversion from storage to habitable rooms along with 3 roof lights to front and 1 one rear, 2. Replace 2 no. existing Velux windows to the rear with 2 flat roof dormers with windows suitable for escape and rescue, 3. Include one additional Velux window to front, 4. Construction of a flat roof extension to rear of house 35m2 floor area, 5. Elevational changes to existing south side gable to form new window and door opening for access to newutility room along with all associated site works

9 Kingsfort , Ballintogher , Co Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?