Sligo Chill Freeze , Rathrippon , Collooney

CONDITIONAL

Planning application 1899

Sligo - Sligo County Council

Proposed Development

PR - For development consisting of retention of changes to the existing Warehouse comprising the following: (A) Changes to front (West) elevation of Unit No. 3 to comprise the replacement of a single loading door at grade with 2 No. Loading doors incorporating dock levellers and seals and personnel door with external galvanised steps and (B) Small single storey extension to the rear (East) of Unit No. 4 to comprise a loading dock with single loading door, dock leveller and associated loading ramp and external galvanised steps.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Mar 2018

  2. Decision: CONDITIONAL

    14 May 2018

  3. Decision due

    23 May 2018

  4. Grant issued

    15 Jun 2018

Application Details

Location
Sligo Chill Freeze , Rathrippon , Collooney
Applicant
N/A
Application Type
RETENTION
Planning Authority
Sligo County Council
Site Area
1.26 ha

Timeline

Registration Date
29 March 2018
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
14 May 2018
Grant Date
15 June 2018
Permission Expires
14 June 2023

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

92m
2360210CONDITIONAL15 Aug 2023

construction of first floor extension (240m2 total floor area) to existing light industrial unit to provide ancillary office and staff accommodation to serve existing business with alterations to existing plans and elevations together with all associated site works

Unit 4B Union Road Business Park , Collooney , Co. Sligo

161m
22228CONDITIONAL5 Jul 2022

development consisting of: (1) change of use to part of the undertakers business to use as a funeral home and crematorium, (ii) construction of a first floor mezzanine and stairs to be used as offices and storage ancillary to the business, (iii) proposed changes to fenestration to the front, south side and rear elevations to accommodate these changes, (iv) change of cladding to the first floor facades of the front and side elevations with window surrounds and louvres, (v) construction of a veranda to the front and south side, (vi) construction of a porte conchere to front entrance, (vii) proposed gas tank and air cooler unit in 2m high walled area located to the south, (viii) carrying out of all ancillary site works

Unit 3 , Union Road Business Park , Collooney

185m
2460256CONDITIONAL31 Jul 2024

for elevation changes in the form of the installation of an aluminium brise soleil system on the west elevation, new external openings, new fenced compound, external store and site signage, together with all site ancillary works

Mayo Sligo and Leitrim ETB NZEB Centre of Excellence Unit 1 , Union Rd Business Park , Collooney Co. Sligo

185m
2460226N/A1 Jul 2024

Permission for new external openings, new fenced compound, external store and site signage, together with all ancillary works at Mayo, Sligo and Leitrim ETB NZEB Centre of Excellence, Unit 1, Union Rd, Business Park, Collooney, Co. Sligo, F91 E161.

Mayo Sligo and Leitrim ETB NZEB Centre of Excellence , Union Rd Business Park , Collooney Co. Sligo

186m
21428CONDITIONAL26 Oct 2021

development consisting of the change of use of existing warehouse unit, permitted under PL04/1470 to use as an Educational Training Centre with all associated works

Unit 1 , Union Road Business Park , Collooney

203m
14346CONDITIONAL10 Jan 2020

development consisting of the following: - (1) change of use & amalgamation of existing units 10, 11, 12 & 13 from warehouse & office space to light industrial unit which will be used to manufacture plastic products (floor area = 2293m2); (2) carrying out of alterations to elevations of existing building; (3) provision of first floor office space in existing building with additional floor area of 231m2; (4) construction of an extension to side elevation with additional floor area of 266m2, provision of 6 no. silos for raw material storage, each with a capacity of 99.7m3, a rain water harvesting tank and water chiller; (5) relocation of existing site entrance and construction of new boundary walls and fencing; (6) revised car parking layout and provision of loading bays; (7) signage & 3 no. flag poles and (8) carrying out of ancillary site development works

Units 10 11 12 & 13 GWI Business Park , Union Road , Collooney

224m
18109CONDITIONAL9 Apr 2018

PP - for development consisting of the following: to carry out preliminary and preparatory site works for reduction of existing ground levels on site with temporary vehicle access, associated facilities all associated works.

Union Road , Collooney , Co. Sligo

233m
2318N/A13 Feb 2023

Development consisting of 1. Retain boundary wall (2.54m in height) and entrance as constructed 2. Retain hard surface measuring 1140 m2 and 748 m2 for the storage of metal and end of life vehicles respectively 3. Retain existing shed and office 4. Retain and complete partially constructed precious metals shed 5. All ancillary works associated with the above. A Natura Impact Statement (NIS) accompanies this application

Collooney Co. Sligo , , Collooney

234m
20399CONDITIONAL23 Nov 2020

Development consisting of the following; permission for subdivision of Unit No. 9 (total floor area 1726 m2) into 2 separate units and all associated works. Previous permission 04/1477 refers

Union Road , Collooney , Co Sligo

300m
17114CONDITIONAL27 Mar 2017

development consisting of the upgrading of the Collooney Wastewater Treatment Plant and will generally comprise the following: change of use of existing single-storey control building to storage building (c.16m2); construction of secondary treatment tanks with associated air blowers and pumps; erection of single-storey administration and control building (c.47.85m2); proposed utility yard area comprising associated equipment including screens, grit removers and odour control; conversion of existing aeration tank to stormwater holding tanks; conversion of existing clarifier to a sludge holding tank and all ancillary site development works including hard and soft landscaping and boundary treatments

Collooney Wastewater Treatment Plant , Union Road , Collooney