← Back to search

Oakfield , Co Sligo , F91 K443

CONDITIONAL

Planning application 19329

Sligo - Sligo County Council

Proposed Development

development consisting of retention to alterations to front porch and velux roof window on front elevation to an existing dwelling.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    9 Aug 2019

  2. Decision: CONDITIONAL

    20 Sept 2019

  3. Decision due

    3 Oct 2019

  4. Grant issued

    23 Oct 2019

Application Details

Location
Oakfield , Co Sligo , F91 K443
Applicant
N/A
Application Type
RETENTION
Planning Authority
Sligo County Council
Site Area
278 ha

Timeline

Registration Date
9 August 2019
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
20 September 2019
Grant Date
23 October 2019
Permission Expires
22 October 2024

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

132m
20362CONDITIONAL19 Oct 2020

Development consisting of a new Advance Technology Unit consisting of office and light industrial/production space. Permission is also sought for vehicular and pedestrian entrance to site, signage, new timber post and rail site boundaries, car parking, cycle shelters, landscaping, a gas skid, underground storage tank, ESB substation, switch room, access road and all associated site works, The development has been the subject of a Screening for Appropriate Assessment in accordance with Article 6(3) of the EU Habitats Directive (Directive 92/43/EEC) and the Planning and Development Act 2000 as amended. The Screening for Appropriate Assessment will be submitted to the Planning Authority with The Planning Application.

IDA Business & Technology Park , Oakfield , Sligo

181m
18360CONDITIONAL10 Sept 2018

for site development works for future industrial/commercial development. The works will include site excavation, construction of a new site access road, new surface water and sanitary sewers , new watermain, new lighting and a new ESB substation at

Oakfield , Oakfield Road , Co. Sligo

303m
19123CONDITIONAL5 Apr 2019

for development consisting of the refurbishment of an existing two storey house (approx. 66 sqm) including demolition of two flat roof extensions, construction of a single storey extension to the north and east of the existing house (approx. 120 sq.m) possibly to be built in two phases, including south facing rooflights, demolition of existing agricultural buildings on site, relocation of existing site entrance, provision of a new on site wastewater treatment system, landscaping and all associated site works

Oakfield House , Oakfield , Co. Sligo

307m
22396CONDITIONAL24 Nov 2022

development consisting of the demolition of 2 existing external sheds, construction of new extensions and reconfigurations to the existing dwelling and all associated site works and services

1064 Oakfield Cottages , Oakfield , Co Sligo

328m
19174CONDITIONAL3 May 2019

for development consisting of (a) retain dwelling house as constructed in different location on a reduced site size as original planning permission PL 93/19125, (b) retain part of front boundary wall and property entrance as constructed which differs from original planning permission PL 93/19125, (c) decommission the existing septic tank and percolation area on site, (d) install a new waste water treatment system on site, (e) construct a new percolation area on land in the ownership of Sligo County Council

Twin Oaks , Oakfield , Co. Sligo

476m
17491CONDITIONAL22 Dec 2017

for development consisting of (a) retain and complete domestic garage on site currently constructed to ground floor level, (b) retain alterations to elevations of dwelling house as constructed on site, (c) retain location of dwelling house as built on site, together with all ancillary site works and services, (previous planning refs: PL13/366 and PL14/286)

Oakfield , Sligo

491m
2460498N/A20 Dec 2024

An extension to the existing access road and all associated infrastructure, including watermain, foul drainage network, pumping stations, stormwater drainage network and detention basin, electrical ducting, street lighting, footpaths, cycle tracks, landscaping and traffic signage. Phase 1 of these works was approved under planning application 18/360 in 2018, for which site works are now completed. The proposed scheme is a continuation of same and the development area is 4.59 Ha.

IDA Oakfield Business & Technology Park , Oakfield Sligo , Co. Sligo

491m
2560014CONDITIONAL20 Jan 2025

An extension to the existing access road and all associated infrastructure, including watermain, foul drainage network, pumping stations, stormwater drainage network and detention basin, electrical ducting, street lighting, footpaths, cycle tracks, landscaping and traffic signage. Phase 1 of these works was approved under planning application 18/360 in 2018, for which site works are now completed. The proposed scheme is a continuation of same and the development area is 4.59 Ha. The development has been subject of a Screening for Appropriate Assessment in accordance with Article 6(3) of the EU Habitats Directive (Directive 92/43/EEC) and the Planning and Development Act 2000 as amended. The Screening for Appropriate Assessment will be submitted with the Planning Application. The screening for Appropriate Assessment resulted in the requirement for a Natura Impact Statement (NIS) to be prepared in relation to the proposed development. The NIS will be submitted with the Planning Application.

IDA Oakfield Business & Technology Park , Oakfield Sligo , Co. Sligo

603m
19151CONDITIONAL17 Apr 2019

for development consisting of the construction of a 24 metre high free standing lattice communication structure and its associated antennae communication dishes and ground equipment, with associated ground-mounted equipment cabinets within a 2.4m high palisade fence compound at

ESB's Oakfield 38kv Substation , Townland of Oakfield , Co. Sligo

635m
2560521CONDITIONAL11 Dec 2025

(1) the construction of a new dwelling house (2) new garage (3) connections to existing public sewer (4) formation of a new site entrance (5) and all associated site works

Ard Na Veigh Road , Magheraboy , Sligo

Planning a project of your own?