Sligo Airport Business Park , Killaspugbrone Td , Strandhill
N/APlanning application 19492
Sligo - Sligo County Council
Proposed Development
development consisting of
- (1)to construct a two-storey office building (1150m2)
- (2)construct access road with entrance onto the business park road
- (3)construct a bicycle storage shelter
- (4)construct a refuse storage compound
- (5)construct a front boundary wall
- (6)erect site signage and signage on building
- (7)provide car parking
- (8)connect to services
- (9)carry out all ancillary site works
Application Timeline
Application received
6 Dec 2019
Further information requested
6 Feb 2020
Further information received
20 Mar 2020
Application withdrawn
15 May 2020
Application Details
- Location
- Sligo Airport Business Park , Killaspugbrone Td , Strandhill
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.388 ha
Timeline
- Registration Date
- 6 December 2019Other applications received that week
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 15 May 2020
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consisting of the change of use of ground and first floor unit from commercial/light industrial building to childcare facility
Killaspugbrone , Strandhill , Co. Sligo
development consisting of the retention of the use of the ground and first floor from permitted commercial/light industrial (PL 01/358) use to use as a child care facility
Unit 3 Strandhill Business Park , Killaspugbrone , Strandhill
development consisting of the installation of a 6m extension to an existing 18m lattice telecommunications support structure to enable the relocation of existing Operators antenna and dish equipment together with associated ground equipment cabinets and associated site works
Killaspugbrone Td. , Strandhill , Co. Sligo
the construction of a Prefabricated Portal Frame Hangar to accommodate aircraft within the boundary of the airport for a temporary period of 5 years
Sligo Airport , Killaspugbrone , Strandhill Co. Sligo
development consisting of construction of a new dwelling, a new garage, a new gateway for vehicular access, a septic tank and percolation area and all associated site works.
Larass , Strandhill , Co. Sligo
for development consisting of the construction of a new dwelling, a new garage, a new gateway for vehicular access, a septic tank and percolation area, and all associated site works
Larass , Strandhill , Co. Sligo
Development consisting of construction of a new dwelling, a new garage, a new gateway for vehicular access, a septic tank and percolation area and associated site works. The permission is sought as a redesign of the existing permission granted for a dwelling PL18/365 on 16/01/2019.
Larass , Strandhill , Co Sligo
Development consisting of the addition of a new window on ground floor, alterations to window size and positions, alterations to rooflight dimensions and a reduction in the height and width of the garage from that permitted under the Planning Application Ref. 19218. Planning Permission is sought for a new flue, a change in dimensions (from that permitted under Planning Permission Ref. 19218) to covered outdoor area on the East elevation, a new covered outdoor area on the West elevation and a new stone boundary wall at the existing site entrance.
Larass , Strandhill , Co. Sligo
development consisting of (a) demolition of existing shed on site (b) construct a single storey dwelling house on site (c) connect to public sewer, togther with all ancillary site works and services
Killaspugbrone , Strandhill , Co. Sligo
for a capped and plastered block wall 26 metres long, height varies from 1.25 metres to 3 metres high. The wall is on the Western boundary of the existing house. The wooden fence that continues the Western boundary has been reduced to 2 metres high
Larass , Strandhill , Co. Sligo
The submission window has closed
Observations on this application closed on Saturday 18 January 2020, five weeks after it was received. The authority cannot accept a late submission.