Towlands of Carrowmore , and Carrownyclowan , County Sligo
CONDITIONALPlanning application 20251
Sligo - Sligo County Council
Proposed Development
PP - for development consisting of a ten-year planning permission for a renewable energy development with a 30-year operational life (from the date of commissioning along with a recreational and amenity facility. The entirety of the renewable energy development constitutes the provision of a ten-turbine wind farm and associated site works on lands in both Counties Leitrim and Sligo. The development will consist of: i. Construction of 2 no. wind turbines with a maximum overall blade tip height of up to 170 metres and associated hardstand areas; ii. 1 no. permanent Meteorological Mast with a maximum height of up to 100 metres, iii. All associated underground electrical and communications cabling connecting the turbines to the proposed wind farm 38kV electricity substation (which is proposed to be located in the townland of Garvagh Glebe, Co Leitrim); iv. Upgrade of existing tracks, roads and provision of new site access roads; v. Recreation and amenity works, including marked trails and associated recreation and amenity signage; vi. Site drainage; vii. Permanent signage; viii. Ancillary forestry felling to facilitate construction and operation of the proposed development; and ix. All associated site development works. A concurrent planning application is being lodged with Leitrim County Council in relation to the elements of the project that are within County Leitrim (which include the provision of 8 no. wind turbines, electrical substation, underground cabling, connection to national electricity grid, access tracks/roads, access junction improvements, amenity works and all associated works). An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development and will be submitted with the application.
View the full application file on the council's planning portal →Application Timeline
Application received
29 Jul 2020
Further information requested
17 Sept 2020
Further information received
21 Apr 2021
Decision due
15 Jun 2021
Decision: CONDITIONAL
15 Jun 2021
Appeal submitted
20 Feb 2025
Application Details
- Location
- Towlands of Carrowmore , and Carrownyclowan , County Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 44.08 ha
Timeline
- Registration Date
- 29 July 2020
- Status
- APPEALED
- Decision
- CONDITIONAL
- Decision Date
- 15 June 2021
An Coimisiún Pleanála Appeal
- Appeal Reference
- ABP-321866-25
- Submitted
- 20 February 2025
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
development consisting of an existing lattice type temporary meteorological mast 80m in height and associated instrumentation and works and the continuation of its use to measure local climate conditions for a period of a further five years
Garvagh Glebe , Co. Leitrim
development located in the townlands of Bargowla, Boleymaguire, Braudphark, Derreens, Derrybofin, Derrycullinan, Derrycullinan Beg, Drummanacappul, Garvagh, Garvagh Glebe, Glassalt, Lisfuiltaghan, Seltan, Sheena and Tinnybeg, County Leitrim consisting of : (a) Construction of 8 No. Wind turbines with a maximum overall blade tip height of up to 170 metres, and associated hard-stand areas; (b) 1no. 38kV permanent electrical substation including a control building with welfare facilities, all associated electrical plant and equipment, security fencing, all associated underground cabling, waste water holding tank and all ancillary works; (c) all associated underground electrical and communications cabling connecting the turbines to the proposed wind farm substation; (d) all works associated with the connection of the proposed wind farm to the national electricity grid, via underground cabling to the existing Garvagh substation; (e) upgrade of existing tracks and roads, provision of new site access roads and hard-stand areas; (f) the partial demolition and alteration of two agricultural buildings in the townlands of Sheena and associated junction access and road works to the existing yard, agricultural buildings and agricultural lands in the townlands of Sheena and Derrybofin to provide link road primarily for construction traffic off the R280. this link road will be for the delivery of abnormal roads to the site during the construction period and may be used during the operational period if necessary or to facilitate the decommissioning of the wind farm. Following construction, access to the link road will be closed off and the yard / agricultural building will revert to its use for agricultural purposes except if and when required for delivery of abnormal loads during the operation period of the wind farm or to facilitate the decommissioning of the wind farm (g)1 no. borrow pit; (h) 2 no. peat and spoil repository areas; (i)2 no. temporary construction compounds; (j) recreation and amenity works including marked trails, boardwalk and viewing area, provision of a permanent amenity car park, and associated recreation and amenity signage; (k) site drainage; (l) permanent signage, (m) ancillary forestry felling to facilitate construction and operation of the proposed development and (n) all associated site development works. An Environment Impact Assessment Report (EIAR) and a Natura Impact Statement have been prepared in respect of the proposed development
Townlands as above ,
a twenty (20) year planning permission for continuations of the operational life of the existing wind farm (SCC Reg. Ref 98/533 & ABP Pl Ref. 21.110572 as amended by SCC Reg Ref.04/1315) from the date of expiration (23rd June 2025) of the current permission. No modifications are proposed to the existing wind farm which comprises the follow elements: a. 4 no. existing wind turbines with a hub height of 44m and a rotor diameter of 52m; b. Existing 1 no. onsite electrical substation compound which includes a control building, welfare facilities, associated electrical plant and equipment, security fencing, associated underground cabling; c. All associated existing underground electrical and communications cabling connecting the turbines to the on-site substation; d. Existing site access tracks of c.1.5km in length and 4 no. turbines hardstandings; e. Existing site drainage and; f. All existing ancillary infrastructure, associated site fencing and signage
Carrane Hill Wind Farm , townlands of Carrownadargny near Geevagh , County Sligo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?