← Back to search

Boyle Road , Gorteen Td , Co. Sligo

CONDITIONAL

Planning application 20409

Sligo - Sligo County Council

Proposed Development

development consisting of the construction of a dwelling house, garage, septic tank and percolation area on site, together with all ancillary site works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    3 Dec 2020

  2. Decision: CONDITIONAL

    25 Jan 2021

  3. Grant issued

    31 Mar 2021

  4. Decision due (upcoming)

    31 May 2028

Application Details

Location
Boyle Road , Gorteen Td , Co. Sligo
Applicant
N/A
Application Type
EXTENSION OF DURATION
Planning Authority
Sligo County Council
Site Area
0.38 ha
Floor Area
271.5 sq m
Residential Units
1

Timeline

Registration Date
3 December 2020
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
25 January 2021
Grant Date
31 March 2021
Permission Expires
30 March 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
20247N/A27 Jul 2020

Development consisting of construction of a dwelling house, garage, septic tank and percolation area on site, together with al ancillary site works and services

Boyle Road , Gorteen Td , Co Sligo

305m
19115CONDITIONAL1 Apr 2019

Development consisting of the construction of a new industrial steel structured storage warehouse with rear loading bays, along with all ancillary site works

Gorteen , Coolavin Barony , Co Sligo

325m
2660066CONDITIONAL20 Feb 2026

to construct a new steel structured storage warehouse shed with front loading bays, along with all ancillary site works

Gorteen , Coolavin Barony , Co. Sligo

344m
1855CONDITIONAL28 Feb 2018

for development consisting of the construction of a new industrial steel structured storage warehouse with side loading bay, along with all ancillary site works

Gorteen , Coolavin Barony , Co. Sligo

1.1km
21252CONDITIONAL30 Jun 2021

Development consisting of (1) construction of a new detached dwelling house (2) construction of a domestic garage and (3) proposed effluent treatment system and percolation area and all associated site works

Lisbaleely , Co. Sligo

1.2km
17492CONDITIONAL22 Dec 2017

for development consisting of the demolition of an existing uninhabitable house, the enlarging of an existing entrance/site access and the construction of a new dwelling house and the installation of a septic tank/percolation area and all ancillary works

Lisbaleely , Gurteen , Co. Sligo

1.2km
19100CONDITIONAL20 Mar 2019

Development consisting of elevational changes to the development permitted on site under reference PL17/492 and all ancillary works.

Lisbaleely , Gurteen , Co Sligo

1.2km
194N/A9 Jan 2019

Development consisting of elevational changes in accordance with the drawings to planning reference PL17/492 and all ancillary works

Lisbaleely , Gurteen , Co Sligo

1.3km
12127CONDITIONAL16 May 2017

(a) retention & completion of existing dwelling on the site of previously demolished habitable dwelling and (b) retention of septic tank and new percolation area together with all associated site works

Cuilprughlish , Gurteen , Co. Sligo

1.3km
2360251CONDITIONAL20 Sept 2023

(1) part demolition of the existing single storey extension to the rear of my dwelling house (2) a new single-story extension to the side and rear of my existing dwelling house (3) modifications to the existing front and side elevations to include alterations to the existing windows and front door, alterations to the existing garage door and alterations to the existing flat roof extensions (4) and all associated site works

Main Street , Gorteen , Co Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?