← Back to search

28 St Patricks Terrace , Temple Street , Sligo

CONDITIONAL

Planning application 2119

Sligo - Sligo County Council

Proposed Development

Development consisting of construction of new vehicular entrance to dwelling house with all associated works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    29 Jan 2021

  2. Decision: CONDITIONAL

    11 Mar 2021

  3. Decision due

    25 Mar 2021

  4. Grant issued

    19 May 2021

Application Details

Location
28 St Patricks Terrace , Temple Street , Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.02 ha

Timeline

Registration Date
29 January 2021
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
11 March 2021
Grant Date
19 May 2021
Permission Expires
18 May 2026

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

100m
2460055CONDITIONAL26 Feb 2024

alterations to domestic dwelling house (Protected Structure RPS Ref 187SE) including replacement of non-historic windows, interior alterations, reroofing of existing lean to structure to rear, construction of a new detached glasshouse in the rear garden and all associated work

2 Hanley Terrace Temple St. Sligo F91NRP0 ,

101m
233CONDITIONAL16 Jan 2023

development consisting of (1) Retention of 3 no. dormer windows to the rear of dwelling house at roof level allowing for larger internal attic storage space and including access stairs from first floor level to attic level; and (2) Retention of 2 no. roof windows to the front and 1 no. roof window to the rear of dwelling house; and (3) Retention of an extension to the garage at the rear of the dwelling house. The dwelling is a protected structure - NIAH Ref: 32012068

2 Hanley Terrace , Temple Street , Sligo

108m
1978N/A6 Mar 2019

for development consisting of (a) remove existing single storey rear extension and attached chimney structure, (b) construct a two storey extension to the rear of dwelling house, (c) construct a single storey hobby/play room at end of back garden, (d) install a first floor bedroom window on gable wall of existing dwelling house and (e) remove existing front boundary garden wall to provide off street car parking

12 St. Patrick's Tce , Sligo

136m
2397N/A20 Oct 2023

to erect a small extension (6M x 2M) at the gable end of the existing building

Market Place , Sligo , F91 EVK4

144m
21223CONDITIONAL9 Jun 2021

Development consisting of the renovation of the existing building including new glazed curtain walling to entrance, provision of PV solar panels to roof, additional skylights to roof, internal alterations and associated site works

Sligo Business Centre , Market Place , Sligo

147m
2360101REFUSED4 May 2023

development which will consist of (a) alterations to front and side elevations (b) construction of a new rear extension to existing dwelling house, together with all associated site works

No.5 St. Patricks Terrace , Temple St. , Co. Sligo

150m
2660168CONDITIONAL6 May 2026

change of use of existing ground floor vacant commercial units (total floor area 450m2) at Print House to use as short stay residential letting comprising of 9 self-contained rooms with associated communal spaces, alterations to elevations and all associated works with associated works

Ground Floor , Print House , Market Place

151m
2295CONDITIONAL16 Mar 2022

development consisting of construction of a split-level extension and all associated site works. The proposed development is within the Cathedral Architectural Conservation Area.

Hawkswell Theatre , Temple Street , Sligo

153m
20352REFUSED12 Oct 2020

development consisting of 58 No. Dwelling units comprising (1) 8 No. 4 bedroom semi-detached 2 -storey dwellinghouses, 2 No. 3 bedroom semi-detached 2-storey dwellinghouses, 2 No. Blocks of 2-storey terraced houses with 2 No. 4 bedroom dwellinghouses and 4 No. 3-bedroom dwellinghouses in each block, total 22 No. housing units. (2) 1 No. 5-storey apartment block(including basement) comprising 16 No. 2-bedroom apartments and 1 No. 6-storey apartment block (including basement) comprising 10 No. 3-bedroom apartments and 10 No. 2-bedroom apartments, with internal circulation and services areas in each block, total 36 apartments, also with associated car and bicycle parking, bin storage and storage areas and circulation at each apartment block basement level, all together with connection to existing public sewer network via Summerhill Village including all necessary enabling works, creation of new access from Circular Road and also estate road network and paths including traffic calming measures as shown, creation of public open spaces, works to site boundaries as shown, and all other ancillary site works and services including ESB sub-station and public lighting as shown

Magherboy and Caltragh , Circular Road , Sligo

153m
2360084CONDITIONAL18 Apr 2023

The development will comprise the construction of 53 no. new residential units on a 1..19 ha site consisting of: • 19 no. 1 bed duplex units • 15 no. 2 bed apartments • 19 no. 3/4 bed duplex units The works will consist of the creation of a new site access from Circular Road that includes a raised tabletop with a controlled pedestrian crossing, car parking and bicycle parking, foul pumping station and rising main to an existing public foul sewer on Circular Road, sustainable drainage system, street lighting, open space, landscaping and all ancillary site works.

Circular Road , Townlands of Magheraboy and Caltragh , Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?