← Back to search

Adervoher Td , Easkey East ED , Co Sligo

N/A

Planning application 21283

Sligo - Sligo County Council

Proposed Development

Development of lands consisting of .8853 hectares as 'Easkey Glamping Village' to consist of the following elements: Amenities building consisting of a reception area, communal outdoor and indoor kitchen, dining, laundry room and bathrooms. (Total area of 223.60m2); Communal area with Firepit, BBQ, outdoor seating and play area; 3 no. storey and half Glamping Barns (21sqm. each X 4.1 high); 7 no. Glamping Pods (21sqm. each X 3.1 high); 2 no. 2-person Bell tents (3m Dia, height 2.1m); 2 no. 4-person Bell tents (4m Dia, height 2.5m); Pitch tent area; Proposed landscaping works to the site; to extend existing access road from R297; 12 no. car parking spaces for use by the Glamping Site users; proposed planting for screening and privacy to the east of the site; connection to all existing services and carrying out of all ancillary site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    21 Jul 2021

  2. Further information requested

    10 Sept 2021

  3. Further information received

    11 Feb 2022

  4. Application withdrawn

    25 Feb 2022

Application Details

Location
Adervoher Td , Easkey East ED , Co Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.8853 ha

Timeline

Registration Date
21 July 2021
Status
WITHDRAWN
Decision
N/A
Withdrawn
25 February 2022

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
22133CONDITIONAL12 Apr 2022

development consisting of proposed development of lands consisting of 0.8853 hectares as 'Easkey Glamping Village' to consist of the following elements: (i) Works to the front roadside boundary to enable safe access and suitable sightlines, (ii) Amenities building consisting of a reception area, communal outdoor and indoor kitchen, dining, laundry room, bathrooms & bin store (Total area of 223.60 m2), (iii) Communal Area with Firepit, BBQ, outdoor seating and play area, (iv) 3no. storey and half Glamping Barns (21sqm. Each x 4.1m high), (v) 7no. Glamping Pods (21sqm. Each x 3.1m high), (vi) 2no. 2-person Bell tents (3m Dia, height 2.1m) (vii) 2no. 4-person Bell tents (4m Dia, height 2.5m), (vii) 7no. Pitch tents, (ix) Proposed landscaping works to the site to extend existing access road from R297, (x) Proposed car park, (xi) Proposed 5m wide planting for screening and privacy to the east of the site, (xii) Connection to all existing services and carry out all ancillary site works

Adervoher Td , Easkey East ED , Co. Sligo

142m
2560165CONDITIONAL30 Apr 2025

(1) construction of new entrance, boundary wall and car parking area; (2) construction of an all-weather pitch with associated fencing, ball stop netting and running/cycling track; (3) construction of playground and walking track; (4) construction of a changing facility; (5) connection to existing services and (6) carrying out of ancillary site works including passive lighting and landscaping

Aderavoher , Easkey , Co. Sligo

212m
2460114REFUSED18 Apr 2024

(1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed detached dwelling houses (62 no. total units (58 houses, 4 apartments)); (2) the extension and connection of the existing access road and estate services and (3) to carry out ancillary site works

Aderavoher , Easkey , Co. Sligo

212m
2460106N/A9 Apr 2024

Planning permission for (1) construction of 4 no. 1 Bed apartments, 10 no. 2 Bed semi-detached dwelling houses, 18 no. 3 Bed semi-detached dwelling houses, 16 no. 4 Bed semi-detached dwelling houses and 14 no. 4 Bed detached dwelling houses (62 no. total units (58 houses, 4 apartments)); (2) the extension and connection of the existing access road and estate services and (3) to carry out ancillary site works at Aderavoher, Easkey, Co.Sligo.

Aderavoher , Easkey , Co. Sligo

267m
18496CONDITIONAL17 Dec 2018

for development consisting of the construction of a dwelling house, domestic garage and connect to public utilities, together with all associated site works

Bunowna Td , Easky , Co. Sligo

289m
1731CONDITIONAL6 Feb 2017

development consisting of the demolition of an existing derelict dwelling house and construction of a new dwelling house and domestic garage with septic tank and percolation area

Cloonagleavragh , Easkey , Co. Sligo

294m
19168N/A30 Apr 2019

for development consisting of 1. The demolition of the existing rear extension and existing shed. 2. Proposed extension to the rear and side of the existing dwelling. 3. Raising the roof of the existing dwelling to accommodate a first floor level 4. Change to all elevations and fenestration

Adervaher , Easkey , Co. Sligo

294m
20124CONDITIONAL24 Apr 2020

Development consisting of the following: 1. the demolition of the existing rear extension and existing shed, 2. proposed extension to the rear and side of the existing dwelling, 3. changes to all elevations and fenestration.

Aderavoher , Easkey , Co Sligo

302m
17107CONDITIONAL22 Mar 2017

development consisting of the construction of a new single storey extension together with works to the existing school at Colaiste Iascaigh (formerly Easkey Vocational School). (Part of the existing school contain a Protected Structure; Sligo Record of Protected Structures 2011-2017 Register No. 87 and National Inventory of Architectural Heritage Reg. No: 32306013). The works shall include the construction of new school accommodation of 312 sqm floor area to include generally; 2 no. classrooms, science lab and prep area, sanitary accommodation and new boiler house. Works to the existing school shall include: the demolition of existing external gas service enclosure; reconfiguration and refurbishment of the existing science lab building. The new building and all works are to be connected to all existing public utilities together with all associated site development works

Colaiste Iascaigh , Bunowna , Easkey

302m
19424CONDITIONAL11 Oct 2019

Development consisting of the installation of 116 sq.metres of temporary prefabricated accommodation together with all associated site works and connection to existing services and utilities. The accommodation includes 2 no. single storey classrooms each with floor area of 58 sqm. Part of the existing school contains a protected structure; Sligo record of protected structures 2017-2023 register no. 87 and national inventory of architectural heritage register no. 32306013.

Colaiste Iascaigh , Bunowna Td , Easkey

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?