Proposed Development
development consisting of the decommissioning of existing septic tank and percolation area and proposed Tricel Novo waste water treatment unit, pump sump, two Puraflo modules on a gravel distribution layer and associated site works
View the full application file on the council's planning portal →Application Timeline
Application received
8 Mar 2021
Decision: CONDITIONAL
30 Apr 2021
Decision due
2 May 2021
Grant issued
11 Jun 2021
Application Details
- Location
- 'Limcarra' , Ballincar , Co. Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.124 ha
Timeline
- Registration Date
- 8 March 2021
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 30 April 2021
- Grant Date
- 11 June 2021
- Permission Expires
- 10 June 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
The development will consist of the demolition of two single storey extensions, one to the side (north west) and one to the rear (south west) of the existing house, demolition of the existing chimneys, addition of a new chimney flue, removal of a flat roof to the side (south east) elevation and replacement with a pitched roof, alterations to the existing openings, provision of a new deck to the rear, provision of a new connection to the public effluent treatment system and all associated site works and services.
Ravenbrook , Ballincar , Co. Sligo
•decommission existing septic tank and provide connection to public sewer. •widen existing vehicular entrance to site. •renovation and extension of existing dwelling house with single storey extension to front and 2 storey extension to rear with associated alterations to elevations and plans and all other associated works - CONDITION NO. 2 COMPLIED WITH
Ballincar , Rosses Point , Co. Sligo
to demolish of one redundant boiler chimney (east elevation), removal of existing pop-out pitched roof and replacement with a flat roof (south elevation), refurbish dormer (east elevation), garage conversion (east elevation), construction of new extension and terrace to the rear (south elevation), provision of skylights (east elevation), replace existing cladding with render (north elevation), alteration to porch depth, alteration to porch and first floor openings (north elevation), provide a new connection to the public effluent treatment system and all associated site works and services
Cedar Lodge , Ballincar , County Sligo
new residential development that includes 12 new dwelling units, comprising of 2 no. 5 bedroom houses, 6 no. 3 bedroom houses, 2 no. 2 bedroom apartments, 2 no. 1 bedroom apartments, associated private, communal and public open space, signage, works to site boundaries, creation of new pedestrian link and access road, associated car and bicycle parking, service connections and all other associated site works and services
Ballincar Townland , Ballincar , Co. Sligo
for development consisting of the construction of a single domestic dwelling, detached garage, on-site wastewater treatment system and percolation area and all associated site works
Ballincar , Co. Sligo
PR - development consisting of the retention of a single storey entrance porch constructed to the front of detached single storey dwelling house
'Glenwood' , Ballincar , Co Sligo
development consisting of ground floor pitched roof extension to rear and shallow flat roof extension to proposed master bedroom, closing off existing set back porch on southeast corner to include within house, alterations to ground floor plan including 1 no. new window opening to east elevation and alterations to existing external windows and doors and all associated site works
Hazelhatch , Ballincar , Rosses Point
The development will consist of: Construction of 3No. new dwelling houses and all associated works which will include: 1.) House 1: Detached single storey plus dormer level dwelling house with storage shed; 2.) House 2: Detached single storey plus dormer level dwelling house with storage shed; 3.) House 3: Detached single storey plus dormer level dwelling house with storage shed; & 4.) the construction of new vehicular entrances to each house from the existing access road to the west of the site and all associated site works and service connections. This planning application is accompanied by a Natura Impact Statement (NIS).
Ballincar , Co. Sligo , Co. Sligo
The development will consist of the provision of 3 no. new dwelling houses which will comprise: - House Type A - 4-bedroom detached family home (267.4sqm) with storage shed (15.7sqm); - House Type B - 4-bedroom detached family home (265.5sqm) with storage shed (15.7sqm); and - House Type C - 4-bedroom detached family home (272.4sqm) with storage shed (15.7sqm). The development will include the construction of new vehicular entrances to each house from the existing access road to the west of the site and all associated site works and service connections. This planning application is accompanied by a Natura Impact Statement (NIS).
Ballincar , Co. Sligo , N/A
development consisting of the construction of a new single storey dwelling and domestic garage, on-site wastewater treatment system and polishing filter, and all other associated site works and services. The proposed application is accompanied by a Natura Impact Statement
Ballincar , Co. Sligo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?