Benbulben Court , Clarion Road , Ballytivnan
N/APlanning application 22288
Sligo - Sligo County Council
Proposed Development
development consisting of the construction of a third floor comprising of 6 additional apartments to the existing building including connection of all associated site services
View the full application file on the council's planning portal →Application Timeline
Application received
23 Aug 2022
Application withdrawn
12 Oct 2022
Application Details
- Location
- Benbulben Court , Clarion Road , Ballytivnan
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.493 ha
- Floor Area
- 588 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 23 August 2022
- Status
- WITHDRAWN
- Decision
- N/A
- Withdrawn
- 12 October 2022
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to construct extension to Hotel Executive Apartment Building permitted under planning reference PD30/03 and modified by planning reference PD183/03. The extension will be 3 storey comprising recreation space at ground floor level with accommodation space at first and second floor level
Clarion Road , Ballytivnan , Sligo Co. Sligo
to construct a playground with associated fencing and landscaping
Clarion Road , Ballytivnan Sligo , Co. Sligo
for development consisting of the change of use of 21 executive hotel apartments to student accommodation with minor internal alterations in a detached 3 storey block located to the rear of the Clayton Hotel with all associated site works. The development is located on the grounds and within the curtilage of Protected Structures
Clarion Road , Ballytivnan , Co. Sligo
development consisting of demolition of existing industrial/commercial building and to construct a 4-storey student accommodation building comprising 28 no. student apartment units with 104 bedspaces, comms room, laundry, storage facilities, refuse area, carparking area, bicycle parking area, landscaped open space and all ancillary site services
Clarion Road , Ballytivnan , Sligo
Replacement of 3no. signs and all associated site development works. Sign 1 (4.2m x 0.4m) is a low-level wall mounted illuminated sign at the left hand side of the main entrance. Sign 2 (4.2m x 0.4m) is a low-level wall mounted illuminated sign at the right hand side of the site entrance. Sign 3 (1.4m x 3.5m) is non illuminated triangle totem sign at the main site entrance at
Clayton Hotel Sligo , Clarion Road , Ballytivnan Ballinode Co. Sligo
Development consisting of the construction of a new single storey extension, with a gross floor area of 117sq.metres together with all associated site works and connections to all public utilities
Ballytivnan Townland , Clarion Road , Sligo
1. Construction of a single storey extension to the north side of the existing school building to contain a single classroom and 4 no. S.E.T. rooms. 2. Connection to existing services on site and all ancillary site works connected with the works mentioned above.
Clarion Rd , Ballytivnan , Sligo
Development consisting of (i) 336m2 of roof mounted Photovoltaic Panels, (ii) a new 2 Tonne LPG storage tank and (iii) a new Heat Pump, together with all associated site works and services.
Block P ATU Ash Lane Sligo , Ash Lane , Sligo
development consisting of (i) 400m2 of roof mounted Photovoltaic Panels, (ii) a new 2 tonne LPG storage tank and (iii) a new heat pump, together with all associated site works and services
Block P ATU Sligo , Ash Lane , Sligo
Atlantic Technological University Sligo, intend to apply to Sligo County Council for planning permission for development at Block G, ATU Sligo, Ash Lane, Sligo. The development to Block G will consist of (i) 400m2 of roof mounted Photovoltaic Panels, (ii) the erection of a roof mounted Heat pump and (iii) the installation of a revolving door and the relocation of the accessible entrance door at the front entrance, together with all associated site works and services.
Atlantic Technological University , Ash Lane , Sligo
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.