← Back to search

9 Kingsfort , Ballintogher , Co Sligo

CONDITIONAL

Planning application 2247

Sligo - Sligo County Council

Proposed Development

Development consisting of the following works: 1. Retention of existing first floor attic conversion from storage to habitable rooms along with 3 roof lights to front and 1 one rear, 2. Replace 2 no. existing Velux windows to the rear with 2 flat roof dormers with windows suitable for escape and rescue, 3. Include one additional Velux window to front, 4. Construction of a flat roof extension to rear of house 35m2 floor area, 5. Elevational changes to existing south side gable to form new window and door opening for access to newutility room along with all associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    11 Feb 2022

  2. Decision: CONDITIONAL

    6 Apr 2022

  3. Decision due

    7 Apr 2022

  4. Grant issued

    13 May 2022

Application Details

Location
9 Kingsfort , Ballintogher , Co Sligo
Applicant
N/A
Application Type
RETENTION
Planning Authority
Sligo County Council
Site Area
0.086 ha
Floor Area
37 sq m
Residential Units
3

Timeline

Registration Date
11 February 2022
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
6 April 2022
Grant Date
13 May 2022
Permission Expires
12 May 2027

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

83m
20130CONDITIONAL30 Apr 2020

Development consisting of the following works: 1. Demolition of existing shelter structure located to the east of existing school; 2. Construction of a new classroom and link corridor extension to the east and north sides of the existing school including signage; 3. Provision of alterations to staffroom block to west side of existing school; 4. Elevation changes to the existing school; 5. Provision of new access ramp and external steps to front (north) of school and provision of a new playground to rear (south) of school; 6. Connection of foul drainage to existing public sewer, connection of surface water into existing system on site and all associated site works

Kingsfort , Ballintogher , Co Sligo

83m
17305CONDITIONAL9 Aug 2017

for development consisting of the construction of an additional temporary prefab type classroom, connect to all public services and construct a new school sign on the front gable of the school together with all associated ancillary works

Kingsfort , Ballintogher , Co. Sligo

186m
18105CONDITIONAL5 Apr 2018

Development consisting of the construction of five, two storey detached dwelling houses on existing vacant sites located to the east of existing house number six.

Kingsfort Manor , Ballintogher , Co Sligo

186m
2360381CONDITIONAL23 Dec 2023

(a) construct one detached two storey dwelling house on vacant site number one, (b) construct two semi-detached two storey dwelling houses on vacant site number thirty six and thirty seven and (c) construct one detached two storey dwelling house on vacant site number thirty eight

Kingsfort Manor Housing Estate , Ballintogher , Co. Sligo

221m
17123CONDITIONAL3 Apr 2017

development consisting of the construction of 1 no. two-storey detached dwelling house and 2 no. two-storey semi-detached dwelling houses on vacant sites located to the south of house no. 35. Permission is also sought for completion of the public footpath, road, vehicle turning area and site services adjacent to these proposed dwelling houses

Kingsfort Manor , Ballintogher , Co. Sligo

263m
20125CONDITIONAL27 Apr 2020

PP & PR - development consisting of the following: retention of a change of use from commercial use to a child care facility and all ancillary services. We also apply for full planning permission to construct a car parking facility on the site

Tiratick , Ballintogher , Co Sligo

424m
2660268N/A3 Jul 2026

We, St. Michaels GAA Club, wish to apply for full planning permission for the following works: 1. permission to upgrade the existing clubhouse from a single storey to a two-storey structure, the extended building will encompass larger changing room facilities on the ground floor. 2. The 1st floor will include a meeting room, kitchen area, viewing balcony and additional toilet facilities. 3. To construct 2 no. ground floor single storey extensions to the existing clubhouse to include additional toilet facilities and storage facilities. 4. To construct a pedestrian pathway around the perimeter of the facility to include low level lighting. 5. To construct a pedestrian pathway to connect both existing GAA pitches. 6. To construct spectator perimeter fencing on both pitches. 7. To fit solar panels to the roof of the new 2 storey building. 8. To construct a new spectator stand, scoreboard and all ancillary works. The works are located at St. Michaels GAA Club, Kingsfort, Ballintogher, Co. Sligo.

St. Michaels GAA Club , Kingsfort Ballintogher , Co. Sligo

497m
15132CONDITIONAL22 Apr 2020

development consisting of the construction of a domestic garage together with all associated ancillary works

Altvelid , Ballintogher , Co. Sligo

511m
2560171CONDITIONAL5 May 2025

1. Construction of a new storey and a half type dwelling 2. Construction of a new wastewater treatment plant and percolation area in accordance with EPA Code of Practice 3. Construction of a new vehicular entrance and access road to serve dwelling 4. All associated site development works

Rathgeean , Ballintogher , Co. Sligo

552m
22183N/A24 May 2022

Development consisting of (1) construction of a storey and half dwelling house with a single storey wing attached to the east, (ii) installation of a wastewater treatment system and percolation area, (iii) lowering the ground and setting back roadside boundary to the east of the new entrance to improve road safety and sightlines and, (iv) carrying out of all ancillary site works

Woodfield Td. , Ballintogher East ED. , Co Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?