← Back to search

Stoneparks , Bal;lymote , Co. Sligo

N/A

Planning application 2360212

Sligo - Sligo County Council

Proposed Development

(1) the demolition of a 2 no. existing single storey semi-detached dwellings (F56 VK49 & F56 CH58) to allow for (2) the construction of 10 no. single-storey semi-detached two-bedroom dwellings, together with the construction of a new vehicular junction onto Teeling Street, a pedestrian walkway onto Teeling Street, on-site storm water attenuation, connection to the public existing sewer systems, works to the site boundaries and all associated site development works including lighting and hard and soft landscaping

View the full application file on the council's planning portal →

Application Details

Location
Stoneparks , Bal;lymote , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.441 ha

Timeline

Registration Date
15 August 2023
Status
INCOMPLETED APPLICATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

0m
2360225CONDITIONAL30 Aug 2023

(1) The demolition of a 2 no. existing single storey semi-detached dwellings (F56 VK49 & F56 CH58) to allow for (2) the construction of 10 no. single-storey semi-detached two-bedroom dwellings, together with the construction of a new vehicular junction onto the local road, a pedestrian walkway onto the same local road, on-site storm water attenuation, connection to the public existing sewer systems, works to the site boundaries and all associated site development works including lighting and hard and soft landscaping

Stoneparks , Ballymote , Co Sligo

42m
2460385CONDITIONAL29 Oct 2024

This development will consist of retention and completion of Units No.1 and No.2, to include 2no. habitable rooms and 1no. en-suite in the attic space to both units, with stairs provided on ground floor, from that granted under P23/60225, including all other ancillary site works and services.

DunBohan Stoneparks , Ballymote , Co. Sligo

103m
22190CONDITIONAL31 May 2022

development consisting of (i) construction of a dormer dwelling house, (ii) construction of a domestic shed, (iii) construction of retaining wall to the rear, (iv) connection to all services and, (v) carrying out of all ancillary site works - CONDITION 9 COMPLIED WITH

Stonepark Td , Ballymote , Co Sligo

125m
2362CONDITIONAL30 May 2023

development consisting of change of use from existing office building to a chemist on the ground floor with reconfiguration of existing office area to the first floor. Permission to include for increased width of shop entrance doors and a new single door to service the first floor office area. Permission for a canopy sign over the shop door and all associated site development works

Teeling Street , Ballymote , Co. Sligo

127m
2360057CONDITIONAL29 Mar 2023

development consisting of to build an infill development to existing site comprising of two storied building, made up of ground floor commercial unit & level 01 apartment

Teeling Street , Ballymote , County Sligo

132m
2560308N/A25 Jul 2025

a) 1 no. two storey, 4 bed house. b) 2 no. two storey, 3 bed semi detached houses. c) All associated site works

Teeling Street , Ballymote , Co. Sligo

149m
22343CONDITIONAL18 Oct 2022

development consisting of (1) Demolition of the doctors surgery building on adjacent site; (2) Demolition of the fuel storage store, cold rooms and roof cover to storage areas; (3) Removal of the portable toilet cabin and storage container; (4) Construction of a single storey & porch extensions (100.9 sq.m) to the existing service station building with ancillary Off-licence use; (5) Reconfiguration of the internal ground floor layout of the existing building to provide retail area (89.9 sq.m), including Off-licence use (10.2 sq.m), seating area (18 sq.m) and deli area (27 sq.m); (6) Construction of a new fuel storage shed (50.8 sq.m); (7) Extension to the service station site to provide additional car parking including 2 no. EV charging points, improved traffic circulation, relocated car wash, external seating area, bicycle parking, reorientated pump islands, new fuel dispenser, forecourt & canopy extensions, new remote dispenser & truck forecourt and all associated site & drainage works

Top Oil Ballymote Service Station at Abbey Terrace , Ballymote , Co. Sligo

154m
19496CONDITIONAL10 Dec 2019

PP - development consisting of (1) Construction of extension to rear and side of existing dwelling house; (2) Carry out alterations and refurbishments to existing dwelling house associated with the proposed works, together with all ancillary site works

No. 11 Castle Burn , Stoneparks , Ballymote

154m
2560254CONDITIONAL19 Jun 2025

Revise existing vehicular access, site boundaries and parking area to the front of existing building containing two apartments, all of which was granted under previous permission ref P.04/1359

Stonepark , Ballymoate , Co. Sligo

174m
20347N/A7 Oct 2020

development consisting of the change of use of office units to an apartment unit, together with all ancillary site works and services

Teeling St. , Ballymote , Co. Sligo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?