← Back to search

Hazelwood Demesne , Hazelwood , Co Sligo

CONDITIONAL

Planning application 2360266

Sligo - Sligo County Council

Proposed Development

A one and a half storey dwelling, domestic garage, proprietary waste water treatment unit and percolation area and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    6 Oct 2023

  2. Further information requested

    27 Nov 2023

  3. Further information received

    26 Feb 2024

  4. Decision: CONDITIONAL

    17 Apr 2024

  5. Decision due

    21 Apr 2024

  6. Grant issued

    22 May 2024

Application Details

Location
Hazelwood Demesne , Hazelwood , Co Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.28 ha
Floor Area
253 sq m
Residential Units
1

Timeline

Registration Date
6 October 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
17 April 2024
Grant Date
22 May 2024
Permission Expires
21 May 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

87m
2660132CONDITIONAL8 Apr 2026

Construct new detached dwelling house with onsite wastewater treatment system, connection to public services and all associated site works

Hazelwood Demesne , Hazelwood , Sligo

240m
2460214CONDITIONAL18 Jun 2024

alterations to front, side and rear elevations, roof and ridge height of existing dwelling. Part single-storey, part two-storey extension to rear and side of existing dwelling. Widening of existing vehicular entrance and all ancillary siteworks

Hazelwood Avenue , Sligo , F91 ECK3

286m
20121REFUSED20 Apr 2020

Development consisting of the following; Permission to retain existing single storey detached structure on site used as a granny flat. Permission to extend existing structure to become permanent residential dwelling house with alterations to elevations of existing structure. Installation of new onsite wastewater treatment system to serve the property with all associated site works.

Hazelwood Avenue , Hazelwood , Sligo

465m
21225CONDITIONAL9 Jun 2021

Development consisting of carrying out the reinstatement of a stone breakwater and the removal of silt build up from a boat slipway. A Natura Impact Statement will accompany this application.

Shores of Lough Gill , Hazelwood Demesne Td , Co. Sligo

660m
2460379CONDITIONAL23 Oct 2024

first floor of dwelling house not permitted under PL12378 with associated alterations to elevations and plans, sunroom extension to side of dwelling house and wastewater treatment system installed on site with all associated site works

Belvedere House , Hazelwood Road , Sligo

720m
2360238CONDITIONAL7 Sept 2023

To construction a 19.5 meter long, 5 m height concrete wall at end of our exist Astroturf Pitch, so we can develop drills and games using the wall, to improve the skills set of our underage and senior teams for continual enjoyment of Soccer, Gaelic football and Hurling, which is all played at Calry Saint Joseph's Community Pitches.

Kiltycahill , Calry , Co. Sligo

746m
1947CONDITIONAL14 Feb 2019

for development consisting of the demolition of existing domestic garage, to construct a single storey extension to the rear and side of an existing private dwelling and a two storey extension to Eastern side of domestic dwelling and front porch. To construct a domestic garage, upgrade the existing waste water treatment system to EPA code of practice and all ancillary works

Kiltycahill , Hazelwood Demesne , Co. Sligo

749m
2460156CONDITIONAL7 May 2024

to install a new waste water treatment system with percolation

Hazelwood Road Hazelwood Sligo F91N7V0 ,

861m
17135CONDITIONAL10 Apr 2017

development consisting of: (1) demolition of rear extension, front porch and existing septic tank (2) construction of a fully serviced single storey extension to front and a single storey stepped extension to the rear (3) upgrading of existing septic tank to new wastewater treatment system with percolation area and (4) all ancillary site works

10 The Cottages , Kiltycahill , Calry

936m
08231CONDITIONAL15 Aug 2019

for a 10 year planning permission at an approximately 29.1 hectare site, the site is part of a larger overall development site measuring approximately 30.9 hectares that straddles the administrative boundary between Sligo Borough Council and Sligo County Council........... The overall development comprises of the construction of 791 no. residential units, 2 no. creches and 3 no. retail units. This application site provides for 733 no. residential units (13 no. of which straddle the administrative boundary), 2 no. creches and 3 no. retail units and is divided in two by and accessed off the R286 Dromahair Road with the northern portion measuring approximately 7.6 hectares and the southern portion measuring approximately 21.5 hectares. This planning application relates to lands within the administrative boundary of Sligo County Council only. The application provides for improvements to the R286 Dromahair Road, site landscaping including outdoor games area to the south of the proposed development, all site services and utilities including a foul pumping station, attenuation areas, entrances and access roads, all associated surface carparking, public lighting and site development works. The concurrent planning application will be lodged with Sligo Borough Council for the remainder of the proposed development comprising 58 no. units and the 13 no. units that straddle the administrative boundary between Sligo Borough Council and Sligo County Counci, all on a site of approximately 1.8 hectares. An Environmental Impact Statement is also submitted

Hazelwood Demense , Hazelwood , Co. Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?