← Back to search

Lands to the North of Radisson Blu Hotel & Spa Sligo , Ballincar Rosses Point , Co. Sligo

CONDITIONAL

Planning application 2360310

Sligo - Sligo County Council

Proposed Development

development consisting of Permission for Retention of 5 X 2000L over ground gas storage tanks with associated landscaping and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    10 Nov 2023

  2. Decision: CONDITIONAL

    8 Jan 2024

  3. Decision due

    13 Jan 2024

  4. Grant issued

    13 Feb 2024

Application Details

Location
Lands to the North of Radisson Blu Hotel & Spa Sligo , Ballincar Rosses Point , Co. Sligo
Applicant
N/A
Application Type
RETENTION
Planning Authority
Sligo County Council
Site Area
0.011 ha

Timeline

Registration Date
10 November 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
8 January 2024
Grant Date
13 February 2024
Permission Expires
12 February 2029

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

35m
2360137CONDITIONAL6 Jun 2023

the erection of 22 no. single story glamping pods, and 1 no. storage building, with associated landscaping, site works and services

Lands to the North of Radisson Blu Hotel & Spa Sligo , Ballincar Rosses Point , Co. Sligo

152m
2660090N/A5 Mar 2026

Full Planning Permission for the installation of 2 no. modular, portable Padel tennis courts, complete with artificial grass surface, 4m high fencing around sections of the Padel courts perimeter and 6m high integrated LED lighting and all other ancillary site works

The Radisson Blu Hotel , Ballinca Rosses Point , Co. Sligo

158m
2560537N/A18 Dec 2025

for the installation of 2 no. modular, portable Padel tennis courts, complete with artificial grass surface, 4m high fencing around sections of the Padel courts perimeter and 6m high integrated LED lighting and all other ancillary site works

The Radisson Blu Hotel , Ballincar Rosses Point , Co. Sligo

181m
2660026CONDITIONAL28 Jan 2026

new residential development that includes 12 new dwelling units, comprising of 2 no. 5 bedroom houses, 6 no. 3 bedroom houses, 2 no. 2 bedroom apartments, 2 no. 1 bedroom apartments, associated private, communal and public open space, signage, works to site boundaries, creation of new pedestrian link and access road, associated car and bicycle parking, service connections and all other associated site works and services

Ballincar Townland , Ballincar , Co. Sligo

189m
2660097N/A10 Mar 2026

Planning Permission to: 1) Construct a lean-to glazed annex to the rear, 2) Construct a glazed conservatory to the northwest elevation, 3) Construct a first-floor extension to the northeast elevation, 4) Install a new pitched roof onto the existing single story flat roof extension on the northeast elevation, 5) Install a new door and window in lieu of an existing window on the south elevation, 6) Remove bedroom to extend existing W.C. on the first floor and, 7) Carry out all ancillary site works at 1 Ballincar Heights, Ballincar Td., Rosses Point, Co. Sligo. F91NN27.

1 Ballincar Heights , Ballincar Td. , Rosses Point Co. Sligo.

189m
2660202CONDITIONAL29 May 2026

1) Construct a lean-to glazed annex to the rear, 2) Construct a glazed conservatory to the northwest elevation, 3) Construct a first-floor extension to the northeast elevation, 4) Install a new pitched roof onto the existing single story flat roof extension on the northeast elevation, 5) Install a new door and window in lieu of an existing window on the south elevation, 6) Remove bedroom to extend existing W.C. on the first floor 7) Install new packaged intermittent filter modules and infiltration area and connect to existing septic tank and, 8) Carry out all ancillary site works

1 Ballincar Heights , Ballincar Td. , Rosses Point Co. Sligo.

189m
2460341N/A7 Oct 2024

We, Maeve Ann & Conor Mitchell, intend to apply to Sligo County Council for Planning Permission to: 1) Construct a single-storey extension to the rear, 2) Construct a first-floor extension to the northeast elevation, 3) Construct a new domestic shed to the rear, 4) Convert the existing domestic shed into a home gym with an additional front window and new stone cladding, 5) New stone cladding on the south and east elevations of the existing single storey extension and, 5) Carry out all ancillary site works at 1 Ballincar Heights, Ballincar Td., Rosses Point, Co. Sligo. F91NN27.

1 Ballincar Heights , Ballincar Td. , Rosses Point Co. Sligo.

198m
20134CONDITIONAL1 May 2020

PR - development consisting of the retention of a single storey entrance porch constructed to the front of detached single storey dwelling house

'Glenwood' , Ballincar , Co Sligo

198m
17425CONDITIONAL9 Nov 2017

for development consisting of the construction of a single domestic dwelling, detached garage, on-site wastewater treatment system and percolation area and all associated site works

Ballincar , Co. Sligo

260m
16487CONDITIONAL25 Feb 2022

development consisting of the following: relocation and upgrading of the existing onsite wastewater treatment system serving the dwelling house and demolition of glass house extension with all associated site works, together with alterations to existing site boundaries

Glenard , Ballincar , Co. Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?