← Back to search

Summerhill College , Knocknaganny , College Road

CONDITIONAL

Planning application 2386

Sligo - Sligo County Council

Proposed Development

development consisting of the installation of floodlighting and ball stop netting in the existing allweather pitch. It will also include an intensification of use to allow the pitch to be used during the evenings and at weekends. The proposed intensification of use will also include permission to rent out the facility

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    4 Sept 2023

  2. Decision: CONDITIONAL

    26 Oct 2023

  3. Decision due

    29 Oct 2023

  4. Grant issued

    1 Dec 2023

Application Details

Location
Summerhill College , Knocknaganny , College Road
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
3.19 ha

Timeline

Registration Date
4 September 2023
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
26 October 2023
Grant Date
1 December 2023
Permission Expires
30 November 2028

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

29m
2156N/A24 Feb 2021

development consisting of the construction of an all new all-weather pitch enclosure with a synthetic all-weather grass surface, associated fencing, footpath, ball-stop netting, 6 No. flood lighting masts and ancillary services. The development will be located to the southern end of the site and include levelling off existing ground to provide for the new pitch. It will also include the widening of the existing L-92137 road to provide vehicular and pedestrian access to the west of the site. The Development will include modification of the internal roads, provision of new parking and a bus set down area. It will include associated and ancillary works, services, landscaping and site works

Summerhill College , Knocknaganny , College Road

148m
21509CONDITIONAL21 Dec 2021

development consisting of the construction of a part two-storey and part single storey extension with pitched roofs to the East of the existing school. The single storey extension includes 2 x SEN Classrooms with toilets and ancillary spaces. The two-storey extension includes 4 classrooms, a wood technology room with preparation area, 2 science laboratories with a preparation area, an office, new locker spaces, storage, toilets, stairs and a lift. It will include a service yard and access road to the south. It will include associated and ancillary works, services, landscaping, steps, ramps and site works. It will include the relocation of 8 existing car spaces within the site to accommodate the extension

Summerhill College , Knocknaganny , College Road

151m
2460492CONDITIONAL19 Dec 2024

1) Elevational modifications including replacement windows and external wall insulation, also high-level fibre cement panels over the existing red brick band. 2) Alterations to entrance lobby at southern elevation and modifications to the staff entrance at the north elevation. 3) New covered bicycle parking to south side of the building. 4) Associated external works including signage, new hard and soft landscaping and car charging points

Department of Social Protection , College Road , Sligo

160m
19282CONDITIONAL11 Jul 2019

Development consisting of the installation of 3 no. temporary classrooms and 1 no. special education needs classroom at the existing school including connection to existing on-site services and all associated ancillary works (the proposed works will be carried out within the curtilage of protected structure (RPS no 29 on map sheet no 1012-11).

Summerhill College , College Road , Knocknaganny

168m
2560410CONDITIONAL3 Oct 2025

a) A new single storey energy centre comprising an internal plant room with roof mounted photovoltaic panels and associated external compound, along with a sub-station and switch room. b) 24 permanent car spaces with covered canopy incorporating photovoltaic panels (300 m²). c) Associated alterations to car parking, drainage and site works. Permission is also sought for the retention of the existing car park on a temporary basis for 10 years. The car park shall have a reduced parking capacity of 294 spaces (excluding the 24 spaces mentioned above)

Department of Social Protection , College Road , Sligo

168m
2460491N/A19 Dec 2024

The development will consist of a deep energy retrofit comprising the following: 1) New energy centre comprising a plant room with deck at ground level and reduced floor level below ground, external compound for an air source heat pump, and a sub-station and switch room. 2) Car park canopies incorporating photovoltaic panels (800 m²). 3) Associated alterations to car parking, drainage and site works.

Department of Social Protection , College Road , Sligo

201m
18289CONDITIONAL20 Jul 2018

Development consisting of new access and gates. The access is proposed in the roadside boundary wall within the curtilage of the former Summerhill College which is a Protected Structure, RPS No 29.

Circular Road , Sligo

233m
20352REFUSED12 Oct 2020

development consisting of 58 No. Dwelling units comprising (1) 8 No. 4 bedroom semi-detached 2 -storey dwellinghouses, 2 No. 3 bedroom semi-detached 2-storey dwellinghouses, 2 No. Blocks of 2-storey terraced houses with 2 No. 4 bedroom dwellinghouses and 4 No. 3-bedroom dwellinghouses in each block, total 22 No. housing units. (2) 1 No. 5-storey apartment block(including basement) comprising 16 No. 2-bedroom apartments and 1 No. 6-storey apartment block (including basement) comprising 10 No. 3-bedroom apartments and 10 No. 2-bedroom apartments, with internal circulation and services areas in each block, total 36 apartments, also with associated car and bicycle parking, bin storage and storage areas and circulation at each apartment block basement level, all together with connection to existing public sewer network via Summerhill Village including all necessary enabling works, creation of new access from Circular Road and also estate road network and paths including traffic calming measures as shown, creation of public open spaces, works to site boundaries as shown, and all other ancillary site works and services including ESB sub-station and public lighting as shown

Magherboy and Caltragh , Circular Road , Sligo

233m
2360084CONDITIONAL18 Apr 2023

The development will comprise the construction of 53 no. new residential units on a 1..19 ha site consisting of: • 19 no. 1 bed duplex units • 15 no. 2 bed apartments • 19 no. 3/4 bed duplex units The works will consist of the creation of a new site access from Circular Road that includes a raised tabletop with a controlled pedestrian crossing, car parking and bicycle parking, foul pumping station and rising main to an existing public foul sewer on Circular Road, sustainable drainage system, street lighting, open space, landscaping and all ancillary site works.

Circular Road , Townlands of Magheraboy and Caltragh , Sligo

275m
21363CONDITIONAL10 Sept 2021

development consisting of a ground floor extension to rear and side of existing house and extension to bedroom on the first floor to side of house and widening of the entrance gate to front drive

No. 91 , Crozon Park , Knocknaganny

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?