Lurgan , Ballintogher , Co. Sligo
CONDITIONALPlanning application 2460235
Sligo - Sligo County Council
Proposed Development
Permission to construct new detached dwelling house with onsite wastewater treatment system, detached domestic garage, connection to public services and all associated site works at Lurgan, Ballintogher, Co. Sligo.
View the full application file on the council's planning portal →Application Timeline
Application received
14 Jul 2024
Further information requested
3 Sept 2024
Further information received
16 Sept 2024
Decision: CONDITIONAL
11 Oct 2024
Decision due
13 Oct 2024
Grant issued
19 Nov 2024
Application Details
- Location
- Lurgan , Ballintogher , Co. Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.47 ha
Timeline
- Registration Date
- 14 July 2024
- Status
- APPLICATION FINALISED
- Decision
- CONDITIONAL
- Decision Date
- 11 October 2024
- Grant Date
- 19 November 2024
- Permission Expires
- 18 November 2029
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Development consisting of forest road site entrance
Ardleebeg , Co Sligo
development consisting of the proposed construction of a loose house along with all associated site works
Carricknagat , Ballintogher , Co. Sligo
for construction of detached domestic garage with all associated site works
Killala , Ballygawley , Co. Sligo
Development consisting of the carrying out of alteration works to dwelling house. The works will include the following: The conversion of existing storage sheds with a floor area of 36 sq. metres to residential usage. The construction of an extension of approx. 64 sq. metres that will connect the existing house with these converted sheds so that the sheds and extension and house form a single residential unit totalling 205 sq. metres in floor area. And to install a new wastewater treatment system on site to replace existing septic tank and percolation area, with all associated site works.
Doonally , Ballygawley , Co. Sligo
Development consisting of the retention of two number existing domestic garages and all associated ancillary works.
Doonally , Ballygawley , Co. Sligo
Development consisting of the construction of a dwelling house, effluent treatment unit system and soil polishing filter and new entrance together with all ancillary site works and services.
Knockatober , Ballintogher , Co Sligo
The development will consist of an enclosed battery energy storage system compound on c. 2.04 hectares. The development will consist of up to 15 no. BESS units comprising of battery cells, modules and racks set within containers stored on concrete bases and ancillary equipment (4 no. BESS containers within each ‘BESS unit’); an individual unit inverter at each BESS unit with some additional ancillary equipment; a Transformer Compound, Control building (including control room and switch room), Interface Kiosk and all associated electrical infrastructure equipment and works; attenuation drainage pond to the northwest of the site; a temporary site compound and all associated works (to be located to the south of the BESS site); a new vehicular entrance to local road and all associated internal access tracks; associated electrical underground cabling and ducting works facilitating the connection of proposed electrical substation to the adjacent Srananagh transmission station; all associated site development, lighting, landscaping, CCTV, security fencing, boundary treatment works above and below ground and all associated ancillary infrastructure.
Townland of Ballysumaghan , Srananagh , Co. Sligo
development consisting of the construction of a dormer type domestic house, domestic garage, upgrading of an existing access and access lane, construction of a domestic waste water treatment system to current EPA Code of Practice standards together with all associated ancillary works
Carricknagat , Ballintogher , Co. Sligo
development consisting of: The 10 year permission for the construction and operation of a synchronous condenser facility. The facility will be a fenced compound ca. 1.196ha in size. The development will have a 30 year operational lifetime and will consist of a synchronous condenser, which will include the following elements: generator and flywheel building (ca. 600 sq.m., ca. 12.5m high) to house the equipment including the generator, flywheel, lube oil skid, vacumn skid, TEWAC pump skid, reverse switch cubicle and star point cubicle; SFC start-up equipment room (ca. 43.650 sq.m., ca. 4.20m high); AC/DC room (ca. 81.480 sq.m., ca. 4.20m high); C&P room (ca. 70.685 sq.m., ca. 4.20m high); battery room (ca. 28.130 sq.m., ca. 4.20m high); storage room (ca. 49.200 sq.m., ca. 4.20m high); supporting components of plant within the compound that include: outdoor cooler (ca. 190.925 sq.m., ca. 2.660m high); start-up transformer & auxiliary transformer structure (ca. 68.265 sq.m., ca. 4.50m high; step-up transformer (ca. 170.985 sq.m., ca. 8.0m high) partially surrounded by a fire wall; and, generator circuit breaker (40.160 sq.m., ca.10m high). All other ancillary and miscellaneous site works including: six (6 No.) lightening masts - height of lightening masts will be determined by lightening protection study prior to commencement of construction; site clearance; site access; separation walls (ca. 8m high) to the south of the transformers; internal hardcore access track; and, development of areas of hard standing including a maintenance layout area. The development will be bound by 2.4m high perimeter fencing. The application is accompanied by a Natura Impact Statement (NIS)
Ballysumaghan , Co. Sligo
Development consisting of permission for the construction of a new forestry access entrance to an existing mature forestry and all ancillary works.
Gadden Beg , Sooey , Co. Sligo
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?