Greystone House , Shannon Eighter , Co. Sligo
N/APlanning application 2460271
Sligo - Sligo County Council
Proposed Development
1. Retention of change of use of dwelling house to guest accommodation at first and second floor levels comprising 10 bedrooms and ancillary accommodation and kitchen and studio apartment at ground floor level. 2. Change of use of garage area to 4 guest bedrooms at ground floor level
View the full application file on the council's planning portal →Application Timeline
Application received
23 Aug 2024
Application withdrawn
14 Oct 2024
Decision due
17 Oct 2024
Application Details
- Location
- Greystone House , Shannon Eighter , Co. Sligo
- Applicant
- N/A
- Application Type
- RETENTION
- Planning Authority
- Sligo County Council
- Site Area
- 0.365 ha
Timeline
- Registration Date
- 23 August 2024
- Status
- WITHDRAWN
- Decision
- N/A
- Decision Due
- 17 October 2024
- Withdrawn
- 14 October 2024
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
to renovate and extend existing derelict cottage
Shannon Eighter Sligo ,
The construction of a new detached dwellinghouse and domestic garage, together with connections to public services and all ancillary site development works
Shannon Eighter Td. , Sligo , Co. Sligo
the construction of a detached dwelling house together with all connections to all services and all associated site development works
Shannon Eighter , Sligo , Co. Sligo
development consisting of retention of the change of use and conversion of former outbuildings to 2 no. Apartments, retention for 1 no apartment on first floor extension over existing outbuilding and for the enhancement of existing entrance and construction of a new road and all associated site works (this site is within the curtilage of a Protected Structure).
Mountshannon House , Shannon Eighter , Bundoran Road
development consisting of single storey extensions to the side and rear of our dwelling
Lisnalurg , Co. Sligo
development consisting of construction of an extension to the front elevation (southern gable). Construction of new window opes to the side and rear gables. Alterations to the existing roof finishes to include provision of solar PV panels. All associated site development works deemed necessary.
Shannon Oughter , Co. Sligo
development consisting of construction of (1) a prefabricated steel shed for domestic storage to the rear of the existing dwelling. (2) Install 3 nr roof lights on the eastern elevation roof (side gable) and associated site works and planning permission for retention of the following (3) existing glazed conservatory to the western elevation (side gable) (4) existing raised deck structure to the western elevation (side gable).
Lisnalurg , Sligo
Development consisting of the following; construction of dwelling house with connection to public services and all associated site works on site
Shannon Oughter , Co. Sligo
development consequent following the grant of outline permission (Ref. PL 20/85) consisting of construction of a new dwelling house with connection to existing public services and all associated landscape works
Old Bundoran Road , Shannon Oughter , Sligo
to change of house design of previously granted dwelling PL22/378. The works will consist of revised floor plans, elevations and finishes, minor reduction in gross floor area and minor modifications to site layout to accommodate the new proposed dwelling. All associated site works, access, drainage, connection to public main, and garage remain the same as granted in PL22/378
Old Bundoran Road , Shannon Oughter , Sligo
Affected by this application?
Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.
Make a Submission or ObjectionPlanning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?