← Back to search

Ballytivnan , Sligo

CONDITIONAL

Planning application 2560547

Sligo - Sligo County Council

Proposed Development

(1) Alterations to existing warehouse and office facility including internal reconfiguration; and (2) Extension to the existing attached external storage area to the rear to form a covered bicycle storage area; and (3) Increase in wall and roof height of the existing rear block to facilitate a plant area and communications storage space at first floor level; and (4) Revised elevational treatments including new window and door openings, new wall and roof finishes, removal of existing ventilation cowls at roof level, new roof light windows, new canopy over front entrance and new building signage; and (5) Construction of all ancillary site features including boundary treatments, car parking and drainage systems, together with all associated landscaping and site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Dec 2025

  2. Decision: CONDITIONAL

    19 Feb 2026

  3. Decision due

    21 Feb 2026

  4. Grant issued

    26 Mar 2026

Application Details

Location
Ballytivnan , Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.391 ha

Timeline

Registration Date
19 December 2025
Status
APPLICATION FINALISED
Decision
CONDITIONAL
Decision Date
19 February 2026
Grant Date
26 March 2026
Permission Expires
24 March 2031

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

138m
21232REFUSED15 Jun 2021

Development consisting of location of a mobile shop unit & sandwich board signage on 3 no spaces of the existing car park

Spar Express , Bundoran Road (N15) , Sligo

207m
2460158CONDITIONAL8 May 2024

The revisions to the previously granted planning permission comprise the following: a) Proposed showroom handover over bay circa 20sqm b) Revised internal layouts including omission of previously granted new showroom area circa 152sqm. c) Revised elevational treatment d) Revised location of valet standalone structure and associated site works.

RD Porter Bundoran Road Shannon Eighter Co. Sligo F91FW70 ,

208m
21522CONDITIONAL23 Dec 2021

Development consisting of the following: a) Alterations to existing car showroom facility and workshops including demolition of circa 40 sqm, b) Construction of a new showroom area circa 152 sqm, c) Construction of new valet standalone structure circa 66sqm, d) Revised elevational treatment, e) Construction of all ancillary site features including signage, boundary treatments, drainage systems, landscaping and car parking. A Natura Impact Statement accompanies this application.

Bundoran Road , Shannon Eighter , Sligo

224m
2074CONDITIONAL10 Mar 2020

development consisting of a temporary classroom

St. Joseph's Special School , Ballytivnan , Sligo

236m
1889CONDITIONAL26 Mar 2018

for development consisting of retention permission for roofs as constructed over extensions that differ from those permitted under PD 999 and PD 1487 and all associated site works

Ardenode , Old Cartron Hill , Sligo

295m
20454CONDITIONAL23 Dec 2020

development consisting of (1) construction of first floor extension to south elevation (2) construction of 2 storey extension to east elevation to replace existing single storey extension all to existing terraced dwelling house

34 Cartron , Sligo

315m
2460178CONDITIONAL22 May 2024

construction of a one storey extension to the rear of an existing two storey residential institutional building; modifications to the site layout and car parking involving a reduction in car park spaces; and all associated site works

Brescia , Ballytivnan Road , Sligo

316m
2323CONDITIONAL28 Feb 2023

development consisting of (a) single storey extension and refurbishment of existing enhanced community care facility (b) demolition of existing water tower (c) addition of car parking to the north west and east of the site (d) all associated works and site works including fencing and connection to foul & storm drainage

St. John's Hospital , Ballytivnan , Sligo

326m
17155CONDITIONAL27 Apr 2017

development consisting of the construction of a fully glazed 3.12 sq.m porch to south elevation of existing house with flat roof and timber screen to south elevation (which is an amendment to previously granted planning application PL 16/414)

Westbourne , Old Cartron , Sligo

346m
19344CONDITIONAL20 Aug 2019

development consisting of the pay-to-use waste portable compactor for dry recyclables and a pay-to-use portable waste compactor for residual waste and food waste

Circle K Service Station , Cartron Hill , Sligo

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?