← Back to search

Coolbock , Riverstown , Co Sligo

N/A

Planning application 262

Sligo - Sligo County Council

Proposed Development

To Construct a slatted house with ancillary concrete slab, and to retain existing machinery storage shed, including all ancillary site works and services

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 Apr 2026

  2. Further information requested

    12 Jun 2026

  3. Further information received

    4 Aug 2026

Application Details

Location
Coolbock , Riverstown , Co Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council

Timeline

Registration Date
22 April 2026
Status
FURTHER INFORMATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

381m
2360264CONDITIONAL4 Oct 2023

construct a dwelling house, domestic garage, install an effluent treatment unit with soil polishing filter, upgrade existing field entrance for domestic use entrance and carry out ancillary site works

Coolbock Td. , Riverstown , Co. Sligo.

615m
2067CONDITIONAL5 Mar 2020

development consisting of as built dwelling house, 6 No. existing domestic sheds, an existing Pollytunnel and an existing glasshouse together with all ancillary site works and services

Ardneeskan , Drumfin , Co. Sligo

754m
2294CONDITIONAL15 Mar 2022

development consisting of construction of a two storey detached dwelling house and install a waster water treatment system with associated percolation area. The application is accompanied by a Natura Impact Statement

Lisbanagher , Riverstown , Co. Sligo

1.2km
1843CONDITIONAL22 Feb 2018

Development consisting of the construction of a new slatted shed and creep area and all associated site works

Drumfin , Via Boyle , Co Sligo

1.2km
17256CONDITIONAL4 Jul 2017

development consisting of the demolition of existing outbuildings, provision of new single storey extension with part basement, domestic shed, wastewater treatment unit with raised percolation area, together with ancillary and associated works (the extension is to a Protected Structure RPS No. 201 former Carrigeenview House)

Drumfin , Riverstown , Co. Sligo

1.3km
2460421CONDITIONAL20 Nov 2024

for the erection of a 24m lattice telecommunications support structure on a 1.2 metre high raised foundation (providing an overall height of 25.2 metres) together with associated antennas and dishes and to remove the existing 15 metre lattice telecommunications structure with antennas (resulting in an overall height of 15.1 metres). The proposed development is all enclosed within an existing compound

Drumfin (Td) , Drumfin , County Sligo

1.4km
2285N/A7 Mar 2022

development consisting of the construction of a two storey four bedroom dwelling house, installation of a new proprietary wastewater treatment system with discharge to a packaged tertiary unit and a distribution attenuation layer, connection to public utilities, provision of a new vehicle access into the site from the public road via the west boundary and ancillary site works

Drumfin , Co. Sligo

1.4km
22254CONDITIONAL21 Jul 2022

development consisting of construction of a two storey four bedroom dwelling house, installation of a new proprietary wastewater treatment system with discharge to a packaged tertiary unit and a distribution attenuation layer, connection to public utilities, provision of a new vehicle access into the site from the public road via the west boundary and ancillary site works

Drumfin , Co Sligo

1.5km
2360159CONDITIONAL29 Jun 2023

construction of A bungalow type dwelling house, detached garage, entrance, boundary fence/wall, onsite suitable treatment system with polishing filter and all ancillary site works

Lisconny , Drumfin , Co. Sligo

1.5km
1886CONDITIONAL23 Mar 2018

for development consisting of the retention of a domestic garage previously granted under PL 04/679, plus ancillary site works

Knocknagroagh , Drumfin , Sligo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?