Proposed Development
The development will consist the decommissioning of the existing septic tank & soak pit and replace with a waste water treatment system with polishing filter and carrying out all other associated site and ground works, all contained within the registered boundaries of the applicant.
Application Details
- Location
- Loge View House , Larass , Strandfill
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
Timeline
- Registration Date
- 19 July 2026Other applications received that week
- Status
- INCOMPLETED APPLICATION
- Decision
- N/A
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Planning Permission to the decommissioning of the existing septic tank ad soak pit and remove same, and replace with a waste water treatment system with polishing filter in a revised site location contained within the confines of the registered site boundary of the applicants at Lodge View, House, Larass, Strandhill , Co Sligo
Lodge View House , Larass , Strandhill
to decommission the existing septic tank & soak pit and remove same,and replace with a waste water treatment system & polishing filter in a revised site location contained within the confines of the registered site boundary of the applicant's and carrying out all other associated site & ground works
Lodge View , Larass Strandhill , County Sligo
Outline planning permission for development consisting of the construction of a dwelling house, connection to all services, sewerage, water etc and all ancillary site works including entrance from R292 at Larass, Strandhill
Larass , Strandhill , Co. Sligo
for a capped and plastered block wall 26 metres long, height varies from 1.25 metres to 3 metres high. The wall is on the Western boundary of the existing house. The wooden fence that continues the Western boundary has been reduced to 2 metres high
Larass , Strandhill , Co. Sligo
Development consisting of the addition of a new window on ground floor, alterations to window size and positions, alterations to rooflight dimensions and a reduction in the height and width of the garage from that permitted under the Planning Application Ref. 19218. Planning Permission is sought for a new flue, a change in dimensions (from that permitted under Planning Permission Ref. 19218) to covered outdoor area on the East elevation, a new covered outdoor area on the West elevation and a new stone boundary wall at the existing site entrance.
Larass , Strandhill , Co. Sligo
Development consisting of construction of a new dwelling, a new garage, a new gateway for vehicular access, a septic tank and percolation area and associated site works. The permission is sought as a redesign of the existing permission granted for a dwelling PL18/365 on 16/01/2019.
Larass , Strandhill , Co Sligo
development consisting of construction of a new dwelling, a new garage, a new gateway for vehicular access, a septic tank and percolation area and all associated site works.
Larass , Strandhill , Co. Sligo
for development consisting of 19 no. residential units comprising 4 no. semi-detached 2 beds, 4 no. semi-detached 3 beds, 1 no. detached 3 bed, 6 no. semi-detached 4 beds and 4 no. detached 4 beds. This development also includes the demolition of an existing derelict cottage, site development works and services
Killaspugbrone , Strandhill , Co. Sligo
development consisting of permission for (1) New single storey southwest side changing room extension and rear store room extension (2) Alterations to existing front facade and northeast side elevation. (3) New entrance canopy together with all associated site works.
Hamilton Park , Strandhill , Co. Sligo
development consisting of (a) demolition of existing shed on site (b) construct a single storey dwelling house on site (c) connect to public sewer, togther with all ancillary site works and services
Killaspugbrone , Strandhill , Co. Sligo
The submission window has closed
Observations on this application closed on Saturday 22 August 2026, five weeks after it was received. The authority cannot accept a late submission.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?