← Back to search

Leekfield , Skreen , Co. Sligo

N/A

Planning application 2660193

Sligo - Sligo County Council

Proposed Development

to construct a two storey extension to the side and a single-storey extension to the rear of a single-storey dwelling and associated site works

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    22 May 2026

  2. Further information requested

    9 Jul 2026

Application Details

Location
Leekfield , Skreen , Co. Sligo
Applicant
N/A
Application Type
PERMISSION
Planning Authority
Sligo County Council
Site Area
0.202 ha
Floor Area
195 sq m
Residential Units
1

Timeline

Registration Date
22 May 2026
Status
FURTHER INFORMATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

793m
2560434CONDITIONAL21 Oct 2025

to convert and extend the former O'Connor's public house to a residential dwelling. Development works to include the reroofing of the adjoining derelict barn and replacement of the existing septic tank with a proprietary effluent treatment system

Gerrib Little , Skreen , Co. Sligo

1.0km
214CONDITIONAL11 Jan 2021

development consisting of the construction of a dwelling house, construct domestic garage, install effluent treatment system with percolation area and to carry out all associated ancillary site works

Gerrib Little Td. , Skreen , Co. Sligo

1.1km
2660102CONDITIONAL13 Mar 2026

retention of southeast facing roof light on the pitched roof of existing dwelling and all ancillary site works

'The Cottage' , Masreagh Td. , Skreen Co. Sligo

1.1km
22157CONDITIONAL9 May 2022

development consisting of (1) extension to existing farm building to provide commercial short-term holiday accommodation with total extension floor area of 84 sqm, (2) proposed effluent treatment system and percolation area and all associated site works

Masreagh , Skreen , Co. Sligo

1.2km
21439CONDITIONAL5 Nov 2021

PP - development comprising of the following: a) The conversion of existing garage to domestic accommodation, And all associated site works and service connections.

Carrowdurneen , Skreen , Co Sligo

1.3km
2460216N/A19 Jun 2024

The development will consist of the construction of an extension to an existing dwelling, demolish existing porch, renovate dwelling, construction of an extension to an existing granary, renovate / convert granary to a habitable dwelling and minor elevational changes to both, retention for an existing shed and for a temporary mobile home (for the duration of the works only) and the decommissioning & removal of existing wastewater treatment system and installation of an onsite wastewater treatment system and all ancillary works

Masreagh , Skreen , Co. Sligo

1.4km
19332CONDITIONAL12 Aug 2019

development consisting of (1) construction of bedroom extension to the East side of the existing dwelling (2) Construction of living room extension to the west side of existing dwelling (3) Install Wastwewater Treatment System and polishing filter.

Farranharpy , Skreen , Co. Sligo

1.4km
21499CONDITIONAL17 Dec 2021

Development consisting of the restoration of and extensions to the existing derelict mill buildings for use as a dwelling house, provision of a waste water treatment system and percolation area to EPA recommendation 2021, an entrance to the public road, a pedrestrian entrance from the public road, provision of a water well, together with all works ancillary to the overall development

Masreagh , Skreen , County Sligo

1.5km
21179CONDITIONAL19 May 2021

Development consisting of the construction of dwelling house, install effluent treatment system with percolation area and to carry out all associated ancillary site works

Farranyharpy Td , Skreen , Co. Sligo

1.5km
21341CONDITIONAL30 Aug 2021

development consisting of (1) construction of new slatted shed with cubicles (2) all associated site works

Carrownree , Skreen , Co. Sligo

Affected by this application?

Submissions can be made for 5 weeks from the date the application was received. Only material planning grounds count. Build a valid submission letter in minutes.

Make a Submission or Objection

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?