← Back to search

Lislary , Ballinfull , Co. Sligo

N/A

Planning application 2660369

Sligo - Sligo County Council

Proposed Development

retention Permission for extensions to existing dwelling and material alterations as constructed, retention Permission for extensions to existing detached domestic garage and material alterations as constructed, retention Permission for onsite waste water treatment system as constructed , retention Permission for decrease to domestic site area, and associated site works as constructed, proposed Planning Permission for associated site works to proposed revised site boundary. Previous Planning Register Number: PL04/1471

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    8 Sept 2026

  2. Further information requested

    30 Oct 2026

Application Details

Location
Lislary , Ballinfull , Co. Sligo
Applicant
N/A
Application Type
RETENTION
Planning Authority
Sligo County Council
Site Area
0.672 ha

Timeline

Registration Date
8 September 2026Other applications received that week
Status
FURTHER INFORMATION
Decision
N/A

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

210m
19179CONDITIONAL8 May 2019

for development consisting of the demolition of an existing cottage and the construction of a replacement single-storey dwelling house, a new shed building and a greenhouse, as well as a proprietary effluent treatment system, percolation area, and all associated site works and use of existing vehicular entrance and out-building

Ballinful , Co. Sligo

311m
18471CONDITIONAL3 Dec 2018

Development consisting of construction of dwelling house with proprietary effluent treatment (p.e.t) system and percolation area.

Lislary , Ballinfull , Co. Sligo

348m
17167CONDITIONAL8 May 2017

development consisting of the construction of a single domestic dwelling, waste water treatment system and percolation area and all associated site works

Lislarry , Ballinfull , Co. Sligo

406m
17429REFUSED16 Nov 2017

for development consisting of the construction of dwelling house and garage with proprietary effluent treatment (p.e.t) system and percolation area

Lislary , Ballinfull , Co. Sligo

406m
17269REFUSED14 Jul 2017

development consisting of the construction of dwelling house and garge with proprietary effluent treatment (p.e.t) system and percolation area

Lislary , Ballinfull , Co. Sligo

415m
2044CONDITIONAL17 Feb 2020

development consisting of the change of plans of dwelling house previously granted (Planning File Reference PL09/584)

Lislary , Ballinfull , Co. Sligo

602m
2660421N/A8 Oct 2026

the construction of a single-storey dwelling house, a new vehicular entrance onto the public road and the closure of the existing agricultural entrance, installation of an on-site wastewater treatment system and soil polishing filter, surface-water drainage works, connection to the public water supply, and all associated landscaping and site development works

Lislary , Ballinfull , Co.Sligo

674m
2560500N/A3 Dec 2025

Construct a Slatted House with ancillary concrete slab, including all ancillary site works and services on this site at the above address

Ardtrasna , Ballinfull , Co. Sligo

674m
2660338CONDITIONAL25 Aug 2026

Planning Permission to construct a Slatted House with ancillary concrete slab, including all ancillary site works and services on this site at the above address

Ardtrasna , Ballinfull , Co. Sligo

677m
22377CONDITIONAL14 Nov 2022

1) The construction of an extension to the rear of the existing dwelling, 2) First floor attic conversion, from storage to habitable rooms, including new gable windows. 3) Upgrade existing wastewater treatment system on site, consisting of a mechanical aeration system with packaged tertiary treatment system and decommission existing septic tank on site. Includes all associated site works.

Lislary , Ballinfull , Co Sligo

The submission window has closed

Observations on this application closed on Monday 12 October 2026, five weeks after it was received. The authority cannot accept a late submission.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?