Proposed Development
The development will consist of the following:
- 1.Construction of a detached four-bedroom, single storey dwelling
- 2.Construction of a detached garage
- 3.Construction of a new wastewater treatment system and percolation area in accordance with EPA Code of Practice
- 4.Construction of a new site access including construction of access road and driveway
- 5.New connection to public watermain
- 6.All associated site development works
Application Timeline
Application received
23 Oct 2026
Decision due (upcoming)
17 Dec 2026
Application Details
- Location
- Formoyle , Calry , Co. Sligo
- Applicant
- N/A
- Application Type
- PERMISSION
- Planning Authority
- Sligo County Council
- Site Area
- 0.253 ha
- Floor Area
- 239 sq m
- Residential Units
- 1
Timeline
- Registration Date
- 23 October 2026Other applications received that week
- Status
- NEW APPLICATION
- Decision
- N/A
- Decision Due
- 17 December 2026
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Development consisting of construction of a split level dwelling house, detached domestic garage, effluent treatment system with percolation area and all associated site works
Formoyle TD , Calry , Co Sligo
Retention Permission for the partial demolition of existing dwelling house. Full planning permission to reconstruct same together with the decommissioning of existing septic tank, the proposed installation of a new onsite sewerage treatment system with polishing filter in accordance with EPA Code Of Practice 2021 to service the above dwelling house and all ancillary works
Formoyle , Calry , Sligo
Retention Permission is being sought from Sligo County Council for the partial demolition of existing dwelling house. Full planning permission is also being sought to reconstruct same together with the decommissioning of existing septic tank, the proposed installation of a new onsite sewerage treatment system with polishing filter in accordance with EPA Code Of Practice 2021 to service the above dwelling house and all ancillary works
Formoyle , Calry , Sligo
Revision of site boundaries to that granted under PL76/6549 and installation of new proprietary effluent treatment system and percolation area (to replace existing septic tank)
Fermoyle , Calry , Co. Sligo
to decommission existing septic tank serving dwellinghouse, relocate and install a new onsite wastewater treatment system to serve existing dwelling house with all associated site works
Fermoyle , Calry , Co. Sligo
Permission to decommission existing septic tank serving dwelling house and relocate and install a new onsite wastewater treatment system to serve existing dwelling house. Permission to construct new detached dwelling house with installation of new onsite wastewater treatment system to serve dwelling house with all associated site works at Fermoyle, Calry, Co. Sligo F91 HY49
Fermoyle , Calry , Co. Sligo
to construct new detached dwelling house with installation of new onsite wastewater treatment system, connection to services with all associated site works
Fermoyle , Calry , Co. Sligo
Develop an all weather sport pitch on an existing (wet) pitch at St Patrick National School Calry, with flood lights, running/walk track outside of the all weather pitch.
Colgagh , Calry , Co.Sligo
Develop an all weather sport pitch on an existing (wet) pitch at St Patrick National School Calry, running/walk track outside of the all weather pitch.
Clogagh , Calry , Co.Sligo
Develop an all weather sport pitch on an existing (wet) pitch at St Patrick NS Calry, with running/walk track outside of the all weather pitch.
Colgagh , Calry , Co.Sligo
Affected by this application?
Closing soonObservations close on Thursday 26 November 2026, five weeks from the date the application was received. The fee is €20, and only planning grounds count.
Check if you have grounds — freeTwo questions, no payment: we'll tell you whether what concerns you is something the council can actually take into account.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?