48 E&F, Robinhood Ind Estate, Clondalkin, Dublin 22
Declared ExemptPlanning application ED09/0035
Dublin - South Dublin County Council
Proposed Development
Temporary storage whilst awaiting shipment of used gasses
View the full application file on the council's planning portal →Application Timeline
Application received
19 Nov 2009
Decision due
16 Dec 2009
Decision: Declared Exempt
11 Jan 2010
Application Details
- Location
- 48 E&F, Robinhood Ind Estate, Clondalkin, Dublin 22
- Applicant
- N/A
- Application Type
- Declaration of Exemption Sect. 5
- Planning Authority
- South Dublin County Council
- Site Area
- 78.1411539777381 ha
Timeline
- Registration Date
- 19 November 2009
- Status
- Decision
- Decision
- Declared Exempt
- Decision Date
- 11 January 2010
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Extension to the rear for the following: external works which are ancillary to the main operation. These works comprise of the erection of a 4,500sq.ft. building, 7.2m high, to house a base for the storage and distribution of gas products; canopy over the existing rear door measuring 13.0m long attached to the existing building; erection of perimeter fence and entrance gates to the front and side boundary; car parking marked out to cater for 24 car spaces and 1 disabled car space.
Unit 49, Robinhood Industrial Estate, Dublin 22.
The development will consist of the construction of a roofed extension (approx. 450 sqm), to incorporate forklift movements to the packaging area of the existing factory and associated site works to include access doors to existing buildings and demolition of existing storage sheds.
Ballymount Road Lower, Walkinstown, Dublin 12, D12 YV59.
The development will consist of the erection of an 18 metre high antennae support structure carrying cellular antennae, radio links plus associated containerised equipment and security fencing to form part of the digital mobile communications network (GSM).
Site adjacent to Orchard Sweet Manufacturing Co. Ltd. (Site No. 111, which is , part of lands held under Folio No. 6573) at the Robinhood Industrial Estate, , Dublin 22.
Retain existing 18 metre high telecommunications monopole support structure (previously granted permission under reference SD10A/0399 which was a temporary permission for a period of 5 years which has expired) carrying antennas and a link dish together with ground-based equipment and security fencing.
Site Adjacent to Rose Confectionary Ltd, Robinhood Industrial Estate, Robinhood Road, Clondlakin, Dublin 22
Retention of an existing 18m high telecommunications support structure carrying antennas and link dishes together with ground based equipment and security fencing at site adjacent to Rose Confectionary Ltd.
Robinhood Industrial Estate, Robinhood Road, Dublin 22
Existing 18 metre high telecommunications support structure carrying antennas and link dish together with ground-based equipment and security fencing.
Robinhood Industrial Estate, Robinhood Road, Clondalkin, Dublin 22
Piping the existing open stream for a length of approx. 70 meters using a 900mm diameter pipe within their property.
Smurfit Kappa Corrugated Cases, Ballymount Road, Walkinstown, Dublin 12
Construction of a single storey extension approx. 10.3 metres high to the existing Finished Goods/Warehouse Building and divided into a Reel Store of floor area 352sq.m. and a canopy with a covered area of 754sq.m. together with ancillary site works.
Smurfit Kappa Corrugated Cases, Ballymount Road Lower, Dublin 12.
Piping the existing open stream for a length of appox. 70m using a 900mm diameter pipe within their property, together with ancillary works.
Smurfit Kappa Corrugated Cases, Ballymount Road, Walkinstown, Dublin 12
Erect 7 no. signs approx 0.6m x 1.2m and a double sided sign 2.4m x 2.4m.
44 Robinhood Industrial Estate, Clondalkin, Dublin 22.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?