← Back to search

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

Declared Not Exempt

Planning application ED15/0028

Dublin - South Dublin County Council

Proposed Development

Whether the subdivision of Unit No. 16 into two separate units is development and whether it is, or is not, exempted development, & whether a material change in use of part of Unit 16 has occurred where it is used by McMahon Builders Providers.

View the full application file on the council's planning portal →

Application Timeline

  1. Appeal decided: Declared not Exempt

    23 Feb 2015

  2. Application received

    18 Aug 2015

  3. Decision due

    14 Sept 2015

  4. Decision: Declared Not Exempt

    14 Sept 2015

  5. Appeal submitted

    12 Oct 2015

Application Details

Location
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Applicant
N/A
Application Type
Declaration of Exemption Sect. 5
Planning Authority
South Dublin County Council
Site Area
78.1411539819481 ha

Timeline

Registration Date
18 August 2015
Status
Decision
Decision
Declared Not Exempt
Decision Date
14 September 2015
Permission Expires
12 February 2015

An Coimisiún Pleanála Appeal

Appeal Reference
RL06S.RL3420
Decision
Declared not Exempt
Submitted
12 October 2015
Decided
23 February 2015

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

14m
SD10A/0243Granted17 Aug 2010

Additional warehouse space as an extension to the south of the existing warehouse; additional office space as an extension to the existing office building at the ground and first floors (to east of warehouse and north of office building) and one additional storey of accommodation above the existing two storey office building and extension; railings and gates as a boundary to the road; and ancillary works above and below ground to facilitate the development.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

34m
SD16A/0272Grant Permission for Retention29 Jul 2016

Retention for the change of used of part of an existing warehouse from warehouse to builders’ provider retail sales area. Retention is also sought for the change of use from open yard to ancillary open storage yard and retention of a security hut in the yard and all ancillary works

Unit 16A, Cherry Orchard Industrial Estate, Ballyfermot, Dublin, 10

43m
ED09/0019Declared Exempt16 Jul 2009

1. Removal of existing diesel tank and external block bund area 2. Removal of small disused storage area beside tank 3. Insertion of CP6FR fuel retention seperator unit from Carlow Pre-Cast Ltd 4. Addition of new 9000 ltr bunded diesel tank and associated ground works.

16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

63m
SD20A/0183Grant Permission for Retention23 Jul 2020

The retention of 54sq.m of internal office space on first floor along with 2 windows.

Unit 17, Cherry Orchard Industrial Estate, Dublin 10

67m
SD05A/0639Granted28 Jul 2005

The development will consist of a relocated / replacement Cellular Base Station comprising a 30-metre high concrete "bird cage" antennas support structure carrying 9 No. GSM antennas, 10 No. 0.6m diameter link dishes, 9 No. 0.3m diameter link dishes plus, a possible further 3 UMTS antennas and a possible 15 further link dishes ( 3 No. 1.2m diameter, 6 No. 0.6m diameer and 6 No. 0.3m diameter link dishes) with associated containerised equipment containers and security fencing to form part of the digital mobile communications network.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

68m
SD21A/0075Grant Permission for Retention29 Mar 2021

Retain 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

68m
SD11A/0025Grant Permission for Retention2 Feb 2011

Retention of the existing 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.

Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

69m
S01A/0201Granted4 Apr 2001

Erect security railings and landscaping

Securiscreen Ltd, Unit 17, Cherry Orchard Ind. Est

72m
SD19A/0267Request Additional Information20 Aug 2019

Construction of ESB substation.

Unit 21-22, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

98m
SD03A/0718Declared Withdrawn10 May 2004

Retention of use of warehouse as industrial unit and for the installation of a lift shaft, paper filtration equipment, collection bins and ducting to rear of unit.

Unit 6, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?