Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Declared Not ExemptPlanning application ED15/0028
Dublin - South Dublin County Council
Proposed Development
Whether the subdivision of Unit No. 16 into two separate units is development and whether it is, or is not, exempted development, & whether a material change in use of part of Unit 16 has occurred where it is used by McMahon Builders Providers.
View the full application file on the council's planning portal →Application Timeline
Appeal decided: Declared not Exempt
23 Feb 2015
Application received
18 Aug 2015
Decision due
14 Sept 2015
Decision: Declared Not Exempt
14 Sept 2015
Appeal submitted
12 Oct 2015
Application Details
- Location
- Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
- Applicant
- N/A
- Application Type
- Declaration of Exemption Sect. 5
- Planning Authority
- South Dublin County Council
- Site Area
- 78.1411539819481 ha
Timeline
- Registration Date
- 18 August 2015
- Status
- Decision
- Decision
- Declared Not Exempt
- Decision Date
- 14 September 2015
- Permission Expires
- 12 February 2015
An Coimisiún Pleanála Appeal
- Appeal Reference
- RL06S.RL3420
- Decision
- Declared not Exempt
- Submitted
- 12 October 2015
- Decided
- 23 February 2015
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Additional warehouse space as an extension to the south of the existing warehouse; additional office space as an extension to the existing office building at the ground and first floors (to east of warehouse and north of office building) and one additional storey of accommodation above the existing two storey office building and extension; railings and gates as a boundary to the road; and ancillary works above and below ground to facilitate the development.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Retention for the change of used of part of an existing warehouse from warehouse to builders’ provider retail sales area. Retention is also sought for the change of use from open yard to ancillary open storage yard and retention of a security hut in the yard and all ancillary works
Unit 16A, Cherry Orchard Industrial Estate, Ballyfermot, Dublin, 10
1. Removal of existing diesel tank and external block bund area 2. Removal of small disused storage area beside tank 3. Insertion of CP6FR fuel retention seperator unit from Carlow Pre-Cast Ltd 4. Addition of new 9000 ltr bunded diesel tank and associated ground works.
16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
The retention of 54sq.m of internal office space on first floor along with 2 windows.
Unit 17, Cherry Orchard Industrial Estate, Dublin 10
The development will consist of a relocated / replacement Cellular Base Station comprising a 30-metre high concrete "bird cage" antennas support structure carrying 9 No. GSM antennas, 10 No. 0.6m diameter link dishes, 9 No. 0.3m diameter link dishes plus, a possible further 3 UMTS antennas and a possible 15 further link dishes ( 3 No. 1.2m diameter, 6 No. 0.6m diameer and 6 No. 0.3m diameter link dishes) with associated containerised equipment containers and security fencing to form part of the digital mobile communications network.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Retain 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Retention of the existing 30 metre high telecommunications support structure carrying antennas and link drums/dishes and ground based equipment all enclosed in security fencing.
Unit 16, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10
Erect security railings and landscaping
Securiscreen Ltd, Unit 17, Cherry Orchard Ind. Est
Construction of ESB substation.
Unit 21-22, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10
Retention of use of warehouse as industrial unit and for the installation of a lift shaft, paper filtration equipment, collection bins and ducting to rear of unit.
Unit 6, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?