Unit 2007-2008, Orchard Avenue, Citywest Business Campus, Dublin 24, D24 RW52
Declared Not ExemptPlanning application ED23/0044
Dublin - South Dublin County Council
Proposed Development
(1,964 m2) Solar PV installation on the roof of the building located at 2007 -2008 Orchard Avenue , Citywest D24 RW52.
View the full application file on the council's planning portal →Application Timeline
Application received
5 Oct 2023
Decision due
1 Nov 2023
Decision: Declared Not Exempt
1 Nov 2023
Application Details
- Location
- Unit 2007-2008, Orchard Avenue, Citywest Business Campus, Dublin 24, D24 RW52
- Applicant
- N/A
- Application Type
- Declaration of Exemption Sect. 5
- Planning Authority
- South Dublin County Council
- Eircode
- D24 RW52
- Site Area
- 8331.53084753045 ha
Timeline
- Registration Date
- 5 October 2023
- Status
- Decision
- Decision
- Declared Not Exempt
- Decision Date
- 1 November 2023
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Unit 2007-2008, Orchard Avenue, Citywest Business Campus, Dublin 24, D24 RW52
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
Units 2007 and 2008, Orchard Avenue, Citywest Business Campus, Dublin 24
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.
Unit 2007 & 2008, Orchard Avenue, Citywest Business Campus, Dublin 24
Construction of 2 no. car parks on grade, each of area 262m.sq. and with 14 car spaces and are to be located off existing private circulation road which serves the factory.
Unit 2008, Orchard Avenue, Citywest Business Campus, Naas Road, Dublin 24
Amendments to existing planning permission (Reg. Ref. No. S00A/0268) for alterations and extensions to previously approved industrial facility, unit 2007, consisting of a single storey production/warehouse building with two storey ancillary offices attached, with an overall gross floor area of 5,090 sq.m. The amended building shall be attached to, and interconnect with adjoining unit 2008 (Reg. Ref. No. S97A/0594). The development, which will include all associated site works, car parking, delivery yards and site services on a site of circa 3 acres. The site forms part of the previous overall permission, Reg. Ref. No. 90A/2340.
Phase1, Citywest Business Campus, Brownsbarn, Naas Road, Co. Dublin.
For 2 facilities, to be constructed in 2 phases, consisting of a single storey production/warehouse building with 2 storey ancillary offices attached, and a terrace of 5 no. single storey production/warehouse units with 2 storey ancillary offices attached, with an overall floor area of 5,687 sq.m. The development which will include all associated site works, car parking, delivery yards and site services on a site of c.3 acres,with access from the main distributor road off the Naas Road via the new grade separated junction. The Site forms part of a previous overall permission, Reg. Ref. 90A/2340.
Phase 1, Citywest Business Campus, Brownsbarn, Naas Road, Co. Dublin.
Extension out of back of house. Adding one ground floor room to house.
15, Cuil Duin Lawn, CityWest, Dublin 24
Revisions to part of the permitted residential development (Reg. Ref. SD06A/0933) on this site (3.2ha), The revised scheme consists of 80 no. residential units in lieu of the previously permitted 61no. residential units comprising the following: 40 no. 3 bed semi detached units (incorporating 10 no. 2 storey units and 30 no. 2.5 storey units), 34 no. 4 bed semi detached units (all 2.5 storey units) and 6 no. 4 bed detached units (all 2.5 storey units). Permission is also sought for amendments/modifications to the layout and design of the permitted internal access roads and the central public open space. A revised landscaping plan is also submitted with the current application. Vehicular and pedestrian access is proposed from Fortunestown Lane via the permitted access road off the existing roundabout and associated internal Spine Road (Reg. Ref. SD06A/0933) within the applicant's lands. Associated and ancillary development will consist of surface car parking spaces, ESB substations and all associated site and development works. Significant Further Information: the number of residential units has been reduced from 80 units to 75 units comprising 40 no. 3 bed semi-detached units (incorporating 10 no. 2 storey units and 30 no. 2.5 storey units), 32 no. 4 bed semi-detached units (all 2.5 storey units) and 3 no. 4 bed detached units (all 2.5 storey units); amendments are proposed to the design/layout of the proposed residential units and associated public and private open spaces; the layout and design of the internal access roads/footpaths have been amended; the overall site area has been increased to 3.5ha and a creche facility (552sq.m. gross floor area) is now proposed within the current application.
Cooldown Commons, Fortunestown Lane, Dublin 24
The development seeking permission will consist of the construction of one dormer window in the main roof to the rear, one rooflight in the main roof to the front of the property and one window in the gable (south) elevation.
38, Edenbrook Green, Citywest, Co. Dublin, D24 DXC6
Addition of 7 no. new windows and 2 no. new glazed screens to the north elevation.