← Back to search

Unit 14, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

Granted

Planning application S00A/0655

Dublin - South Dublin County Council

Proposed Development

Retention of the internal sub-divison of Unit 14 into Unit 14(1) and 14(2) as manufacturing/warehousing including retention of internal first floor offices in Unit 14(1) and internal Ground floor offices in Unit 14 (2)

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    19 Sept 2000

  2. Decision due

    14 Nov 2000

  3. Decision: Grant Permission

    15 Nov 2000

  4. Grant issued

    8 Jan 2001

Application Details

Location
Unit 14, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
3204.21240733766 ha

Timeline

Registration Date
19 September 2000
Status
Decision
Decision
Grant Permission
Decision Date
15 November 2000
Grant Date
8 January 2001

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

12m
SD08A/0045Grant Permission for Retention27 Mar 2008

Single storey 'lean-to' to the rear of unit and planning permission is sought for a new usage at the front area of the building for use as a 90sq.m. cafe outlet (presently light industrial / office use) creating a sub-division of the unit into cafe and industrial unit, the construction of a new mezzanine floor within the industrial portion, increasing the internal area from 977sq.m. to 1390sq.m., a new fire door and zinc cladding to the front elevation and associated works.

Unit 14, Cherry Orchard Industrial Estate, Palmerstown, Ballyfermot, Dublin 20.

12m
SD09A/0243Granted10 Jun 2009

Modification of internal mezzanine at first floor level and increase in height of rear section of building (6.455n) to accommodate additional (approx. 15sq.m.) mezzanine. The building is subject of previously approved Planning Permission Reg. Ref. SD08A/0657.

rear of Unit 14B, Cherry Orchard Industrial Estate, Dublin 10

12m
SD08A/0657Granted18 Sept 2008

Demolition of existing sub standard ground floor internal accomodation, construction of new internal office area on ground & first floor, new internal mezzanine at first floor level, single storey extension to rear for Shot Blast & Paint area 3.9m high. Alterations to elevations, roller shutter security screens to front elevation, new roller shutter doors to side elevations, new side security gates & screen wall approx. 3m high. Solar panels to roof on south/east elevation, new zinc panel cladding to front & part side elevation, new signage with over illumation at high level on front elevation & all ancillary works.

Unit 14B, Cherry Orchard Industrial Estate, Dublin 10

63m
S00B/0391Granted14 Jun 2000

Single storey extension at front and side

62 Oakcourt, Palmerstown, Dublin 20

69m
S00A/0425Granted18 Sept 2000

Two storey office extension to side of existing warehouse building and associated site works and elevational treatment

32-33 Cherry Orchard Industrial Estate, Ballyfermot, D. 10

70m
SD10A/0230Granted30 Jul 2010

Change of existing warehouse use of 2 units, Nos. 32 and 33 (sub-divided from existing larger holding), to allow the applicant to carry on the business of a builder's providers, selling to trade and public customers, and provision of proposed new entrance screen, signage and associated sundry work.

Units 32 & 33, Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10

71m
S01A/0627Granted25 Sept 2001

Two storey office/warehouse extension between existing warehouse buildings and associated site works and elevational treatment.

32, 33 & 34 Cherry Orchard Industrial Estate, Ballyfermot, Dublin 10.

75m
SD18A/0075Refused1 Jun 2018

(a) Partial change of use of existing light industrial unit to recreation facility/family entertainment centre, (b) permission for removal of existing roller shutter door located along the front elevation and insertion of glazed unit incorporating double pedestrian doors at ground floor level with windows at first floor level, (c) internal modifications to include reception area, play school, revised toilet arrangements, kitchen/servery and all ancillary spaces pertinent to that of a family entertainment centre at ground floor level and office space/storage at mezzanine level, (d) revised pedestrian escape door arrangement along side elevation, (e) enclosed secure bin store to be located to front of building, (f) connection to all existing mains services on-site and all associated development works.

Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

75m
SD18A/0009Invalid - Site Notice15 Jan 2018

(a) Partial change of use of existing light industrial unit to recreation facility/family entertainment centre, (b) removal of existing roller shutter door located along the front elevation and insertion of glazed unit incorporating double pedestrian doors at ground floor level with windows at first floor level, (c) internal modifications to include reception area, play school, revised toilet arrangements, kitchen/servery and all ancillary spaces pertinent to that of a family entertainment centre at ground floor level and office space/storage at mezzanine level, (d) revised pedestrian escape door arrangement alongside elevation, (e) enclosed secure bin store to be located to front of building, (f) connection to all existing mains services on-site and all associated development works.

Unit 67, Cherry Orchard Industrial Estate, Ballyfermot Road, Dublin 10

97m
SD18B/0107Granted20 Mar 2018

Single storey living room, extension to front of existing dwelling and associated site works.

56, Oakcourt Park, Dublin 20

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?