← Back to search

Unit 6 Cookstown Industrial Estate, Tallaght, Dubl

Granted

Planning application S00A/0800

Dublin - South Dublin County Council

Proposed Development

Erection of 15m lattice antennae support structure carrying GSM Telecommunications Equipment, associated equipment container and palisade fencing.

View the full application file on the council's planning portal →

Application Timeline

  1. Further information requested

    18 Jan 2001

  2. Application received

    11 Jul 2001

  3. Further information received

    11 Jul 2001

  4. Decision due

    5 Sept 2001

  5. Decision: Grant Permission

    6 Sept 2001

  6. Grant issued

    22 Oct 2001

Application Details

Location
Unit 6 Cookstown Industrial Estate, Tallaght, Dubl
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
71.6 ha

Timeline

Registration Date
11 July 2001
Status
Decision
Decision
Grant Permission
Decision Date
6 September 2001
Grant Date
22 October 2001

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
SD05A/0845Granted20 Feb 2006

Change of use of premises to waste management use.

Unit 7A, Cookstown Industrial Estate, Tallaght, Dublin 24

29m
S99A/0799Granted11 Nov 1999

Sub-division of existing single office/warehouse units, with car parking to front and side and alterations to front elevation to include new warehouse roller shutter door and modifications to existing entrance.

Unit 7, Cookstown Industrial Estate, Tallaght, Dublin 24.

29m
S00A/0911Refused22 Dec 2000

Retention of existing warehouse extension to rear and also construction of new extension to rear and side of warehouse.

Unit 7, Cookstown Industrial Estate, Tallaght, Dub

44m
SD14A/0075Granted22 Apr 2014

Erection of 4.19sq.m. sheet metal signage fixed to south, east and west face of existing 3.975m high 'totem' style concrete structure in south west corner of site; erection of 15.71sq.m. sheet metal signage fixed to existing 5.1m high 'goal post' style structure abutting south east (front) corner of existing building; erection of 18m long x 3m high (54sq.m.) pvc 'banner' style signage fixed to rear (north facing) wall of building; erection of new 1.25m x 1.25m x 3.975m high steel advertising structure in south east corner of site with associated 5.34sq.m. sheet metal signage fixed to south, east and west face of structure.

Unit 5, Cookstown Estate Road, Cookstown Industrial Estate, Tallaght, Dublin 24.

44m
S00A/0167Granted15 Mar 2000

Alterations and extensions to their existing premises to include replacing and extending the original Warehouse by 90 sq. metres and increasing the eaves heights from 4.5 metres to 9.7 metres, together with a new facade and first floor extension of 24 sq. metres to the existing two-storey Office area, in addition to general internal mezzanine extensions to 70 sq. metes.

Hilary House, Cookstown Industrial Estate, Tallaght, Dublin 24.

98m
SD26A/0046WRefused19 Feb 2026

Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.

Unit 21, Site of c.1.28ha at, First Avenue, Cookstown Industrial Estate, Dublin 24

99m
SHD3ABP-303911-19Refused12 Mar 2019

The demolition of 5,500sq.m of existing 1 and 2 storey industrial buildings (including a small operating cafe) and associated site clearance works, and the construction of 150 'Build to Rent' apartments in 3 5-6 storey blocks and 222 Shared Living units in a fourth 6-8 storey (parapet level) block. The proposal provides a total of 725 bedspaces. The proposed development will include a retail/cafe unit of 92sq.m, 64 car parking spaces at grade, communal, public and private open space and communal resident facilities and services, a total of 488 sheltered bike parking spaces split into each block and an additional 98 visitor bike parking spaces at grade. An upgrade to the public realm, to include cycle paths and footpaths along First Avenue and Cookstown road adjoining the site is also proposed.

Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24

100m
SD21A/0196Refused15 Jul 2021

Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.

Unit 21, First Avenue, Cookstown Industrial Estate, Dublin 24

102m
ED13/0009Declared Exempt20 Feb 2013

Use of building for the intake of dry waste material (paper, cardboard etc) for compression into bulk bales for export for recycling abroad. A waste permit will be applied for separately.

Unit 8, Cookstown Industrial Estate, Tallaght, Dublin 24.

116m
ED24/0070Declared Exempt9 Jan 2025

The proposed change of use of an existing commercial storage building into Accommodation for use under SI 605 for International Protection Applicants

Unit 81, Cookstown Estate Road, Cookstown Industrial Estate, South Dublin, D24 WVT4

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?