← Back to search

Unit 264B, Greenhills Industrial Estate, Dublin 12

Granted

Planning application S01A/0155

Dublin - South Dublin County Council

Proposed Development

Division of industrial/warehouse unit into 2 units and new sign over front door at

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    16 Mar 2001

  2. Decision due

    11 May 2001

  3. Decision: Grant Permission

    14 May 2001

  4. Grant issued

    29 Jun 2001

Application Details

Location
Unit 264B, Greenhills Industrial Estate, Dublin 12.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
655 ha
Floor Area
290 sq m

Timeline

Registration Date
16 March 2001
Status
Decision
Decision
Grant Permission
Decision Date
14 May 2001
Grant Date
29 June 2001

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

25m
SD07A/0646Granted15 Feb 2008

(1) Proposed demolition of 1 no. detached decommissioned ESB substation; (2) proposed construction of 1 no. 2 storey detached commercial unit with cladded finish with floor area totaling 140.69sq.m. and 5 car parking spaces. Unit to be called 11B.

Mulcahy Keane Industrial Estate, Greenhills Road, Dublin 12

28m
SD08A/0742Grant Permission & Grant Retention24 Feb 2009

Retention for alterations to partially constructed unit including proposed mirroring of front elevation & internals of unit; (2) retention permission for alterations to location of unit 11B relative to existing unit to the east; (3) proposed permission for alterations to proposed car parking layout for Unit 11B. Previous planning application for Unit 11B Ref: SD07A/0646.

Unit 11B Mulcahy Keane Industrial Estate, Greenhills Road, Dublin 12

33m
S00A/0641Granted8 May 2001

Retention of first floor extension to offices at side of Industrial unit and additional front window

Greenhills Industrial Estate, Walkinstown, Dublin 12.

34m
SD04A/0438Granted3 Sept 2004

Construction of a 2-storey front extension to the existing industrial unit consisting of a loading bay with offices over and a covered canopy at front; first floor offices over existing offices and new stairs at ground floor to serve these offices; first floor offices over previously approved ground floor offices (previous permission Reg. Ref. SD03A/0065) and alterations to previously approved front and side elevations; and new parking layout and railings at front of site; proposed extensions amount to 212 sq. m. to an existing/previously approved premises of 2,253 sq. m. floor area.

Unit 3, Greenhills Industrial Estate, Walkinstown, Dublin 12

34m
SD03A/0065Granted20 Aug 2003

Construction of a single-storey extension to the side and a two - and single storey extension to the front of the Industrial Unit, with a total floor area of 1103sq.m., and alterations to the front of the existing premises including new front canopies.

Unit 3, Greenhills Industrial Estate, Walkinstown, Dublin 12

60m
SD25A/0299WGranted8 Dec 2025

The development shall consist of the Demolition of the existing centrally located Single Storey industrial unit and ancillary offices housing the operations of AE Doors and the construction of a new three-storey Office and Welfare block housing the Staff facilities including Staff Entrance, bike parking, changing areas, toilets, canteen and office facilities. The development shall be formed in a three-storey steel and precast concrete structure clad with rendered blockwork to a parapet level and punctuated with Vertical Strip fenestration on the North and West Elevation with a full elevation of curtain walling on the North West Elevation incorporating vertical brise soleil. Ground floor shall house the Welfare facilities with two storeys of office above. Each floor shall measure 745 sqm giving an overall building floor area of 2,235 sqm. The overall height to parapet shall be 12m, giving a level of 67.59m OD. The roof shall support an extensive green roof. Some local car and bike parking shall be provided however the majority shall be housed with the wider Brennans site. A new boundary wall shall define the site and shall be set back to improve the footpath width. Local Landscaping shall be installed within the boundary incorporating the maximum permissible Suds infrastructure.

Unit 10, Greenhills Industrial Estate, Greenhills Road, Walkinstown, Dublin 12, D12 HY24

60m
SD06A/0195Granted20 Mar 2006

Works to partially demolish the existing Northright roof structure (incorporating controlled removal and disposal of existing asbestos roof sheeting in accordance with the requirements of the Health & Safety Authority and the European Communities (Protection of Workers) (Exposure to Asbestos) Regulations 1989) and replace with duopitch roof structure.

Mulcahy Keane Industrial Estate, Greenhills Road, Walkinstown, Dublin 12.

62m
SD07A/0643Granted15 Feb 2008

(1) Proposed removal of existing roof of Unit 11; (2) proposed raising of existing walls with cladded structure & proposed construction of new roof at higher level than previous roof.

UNIT 11, Mulcahy Keane Estate, Greenhills Road, Dublin 12

68m
SD07A/0321Granted3 May 2007

Construction of new entrance to existing showrooms on the north west elevation' new signage over proposed new entance and associated siteworks.

Fantasy Lights, Mulcahy Keane Industrial Estate, Greenhills Road, Walkinstown, Dublin 12

80m
SD25A/0139WGranted19 Nov 2025

The development shall consist of the phased partial demolition, reconstruction and extension of the existing Bakery Production and distribution complex at their expanded site in Greenhills Industrial Estate. The overall development shall consist of a number of consecutive phases designed and implemented to ensure the maintenance of the ongoing operations of the facility namely: 1) Area 1 a. Demolition of the existing Varian brushes building which forms part of the expanded site. b. Creation external staff parking area constructed the North Eastern End of the site along with a new Public footpath and cycleway constructed around the Northern Boundary and providing access from St James Road into and through Greenhills Industrial estate. c. New Boundary wall formed with a brickwork wall with piers and Steel fence to match existing. d. Van Loading Building measuring 3082m2 on plan with a height of circa 5m at eaves level. The building shall be formed with a curved green roof with Solar panels and a step at the external elevation to reduce massing to the surrounding properties. The building shall be externally clad with Insulated Microrib panel which shall be augmented on the Southern and South Eastern elevations with Acoustic protection to minimise the operational noise at the boundary. 2) Area 2 a. Demolition of the existing centrally located two storey Office & Welfare accommodation and Van loading canopies. b. Construction of new Welfare Accommodation housing the Staff facilities including Staff Entrance, bike parking, Changing areas, toilets, canteen and office. Facility shall be formed in a Two storey concrete building clad with rendered blockwork to a parapet level and punctuated with windows along the Northern elevation. The footprint shall measure 829m2 and the overall height to parapet shall be 11m2. The roof shall house a mixture of green roof and solar panels. c. Reroofing and expansion of existing Packing operations to the South and adjoining the New Welfare Accommodation. Construction shall be of Structural Steel lattice girders supporting a mixture of Trapezoidal Insulated roof panels and built up insulated roof system. The Southern wall shall be externally clad with Insulated Microrib panel which shall be augmented on the Southern and South Eastern elevations with Acoustic protection to minimise the operational noise at the boundary. The extended Packing area shall measure 1273m2 on plan with a general height above floor level of 10.5m. 3) Area 3 a. Construction of new Bakery Facility on the site of the existing Car Park and loading area at the North Western edge of the site, directly adjoining the existing facility. The bakery shall measure 3007m2 and shall be 11m high at the boundary stepping up to 14m on the Bakery proper and 18m on the North Western Corner. The facility shall be completed with a mixture of rendered blockwork and brick work panels with high level windows into the Production area. The bakery shall be constructed of Structural Steel lattice girders supporting Trapezoidal Insulated roof panels solar panels. b. Demolition of the existing services area at the Western boundary. c. A three storey Plant and Process Area shall be constructed on the Western elevation and shall be constructed in a Concrete frame and clad with insulated Cavity walls finished with a mixture of Brick and Plastered blockwork external Elevations. The construction shall be completed with a tower structure in the North Western Corner. Roof Construction shall be an insulated built up system supported from a precast concrete superstructure. d. Reroofing of the existing batch and Multiplant Bakery areas to the South and adjoining the New Bakery. The existing low double pitch roofs shall be removed and a new higher Structural Steel lattice girder structure supporting a mixture of Trapezoidal Insulated roof panels and built up insulated roof system installed along with Solar Panels. e. Reroofing and regeneration of the existing Pan Plant located on the Southern boundary to consist of the replacement of the existing external envelope of the building. 4) Area 4 a. Demolition of the existing Administration office and Silo Enclosure. b. Construction of a new three Storey Office block with ground floor covered car parking. The building shall be completed in a concrete frame and precast concrete floors. The facility shall be completed with a mixture of rendered blockwork and brick work panels with strip windows to the Western elevation. c. Realignment of the existing Flour Silos and the installation of four additional silos which hall shall be contained within a Micro rib clad steel Enclosure for visual purposes. d. Alterations to existing boundary and the creation of a new car park and Intake Vehicle unloading area including the relocation of the existing entrance gates and the addition of a new gateway specifically for the office area. e. Redefinition of the existing boundary treatments and improvements to the existing internal estate footpath network with increased definition of cyclist facilities and road separation. Improved lighting installations to the environs of the development and adjoining areas. f. Installation of Sustainable surface water drainage and retention systems to all upgraded areas.

Brennans Bakeries, Greenhills Industrial Estate, Greenhills Road, Walkinstown, Dublin 12, D12 XR92.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?