← Back to search

Site 14E, Phase 3, Greenogue Industrial Estate, Ra, Co. Dublin

Granted

Planning application S01A/0220

Dublin - South Dublin County Council

Proposed Development

Construct 576 sq.m. of warehousing/light industrial units in 1 no. block including 216 sq.m. of integral related office accommodation on two floors together with service utilities, boundary fences, paving, parking, landscaping and planting at site.

View the full application file on the council's planning portal →

Application Timeline

  1. Further information requested

    14 Jun 2001

  2. Application received

    29 Jun 2001

  3. Further information received

    29 Jun 2001

  4. Decision due

    24 Aug 2001

  5. Decision: Grant Permission

    28 Aug 2001

  6. Grant issued

    10 Oct 2001

Application Details

Location
Site 14E, Phase 3, Greenogue Industrial Estate, Ra, Co. Dublin.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
3035 ha
Floor Area
576 sq m

Timeline

Registration Date
29 June 2001
Status
Decision
Decision
Grant Permission
Decision Date
28 August 2001
Grant Date
10 October 2001

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

18m
SD04A/0356Granted29 Jul 2004

Relocate previously approved warehouse/light industrial unit (Reg. Ref. S01A/0220) towards Road 3.

Site 14E, Phase 3, Greenogue Industrial Estate, Rathcoole, Co. Dublin

45m
S00A/0154Granted10 Mar 2000

Construct a temporary proprietry foul treatment plant and associated percolation area.

Greenogue Industrial Estate, Phase 3, Rathcoole, Co. Dublin

55m
SD03A/0607Granted16 Jan 2004

An increase in the volume of waste accepted at it's facility to 95,000 tonnes per annum. This project is the subject of an application to the Environmental Protection Agency for a waste licence to include waste recovery and disposal activities as per the third and fourth schedules of the Waste Management Act 1996 and the European Communities (Amendment of the Waste Management Act, 1996) Regulations, 1998 (S.I. 166 of 1998) all of which are described in detail in an accompanying Environmental Impact Statement (EIS), which is being submitted to the planning authority with this application.

Site 14B, Phase 3, Road 3A, Greenogue Industrial Estate, Rathcoole, Co. Dublin.

55m
SD03A/0581Grant Permission & Refuse Permission11 Aug 2003

Retention of works at present under construction as follows: a) Omission of 233m.sq. integral ancillary office accommodation on three floors from within warehouse and revision to elevations. b) Provision of 175m.sq. ancillary office accommodation in 3 storey (9.25m high) freestanding prefabricated block in yard area. c) Provision of additional site entrance and weighbridge. d) Provision of truck marshalling, refuelling and skip storage areas. e) Relocation/alteration of/to washbay, weighbridge, car parking, yard area, drainage and landscaping to suit items b to d above. (Reg Reference No. S01A/0868) warehouse unit.

Site 14B, Phase 3, Road 3A, Greenogue Industrial Estate, Rathcoole, Co. Dublin

55m
SD03A/0893Granted2 Dec 2003

Development of temporary office for 5 years comprising of 162m.sq. of prefabricated free standing ancillary office accommodation in 2 no. adjacent blocks. (i) Block 1A to consist of 58m.sq. of ancillary office on 2 no. floors, 116m.sq. total, 6.15m high including external access stairs to side. (ii) Block 1B to consist of 46m.sq. of ancillary office on ground floor only, 3.15 high to approved (Reg. No. S01A/0868) warehouse unit and subsequent retention (Reg. No. SD03A/0581).

Site 14B, Phase 3, Road 3A, Greenogue Industrial Estate, Rathcoole, Co. Dublin

55m
S01A/0868Granted28 Mar 2002

Waste transfer and recycling facility including: erection and use of a 1729m2 warehouse building including 233sq.m of ancillary office accommodation on 3 floors, for receiving, unloading, storing, loading and transferring wastes; skip storage, weighbridge; civic amenity area/bring centre for use by the public; truck wash area; hardstands; security gate; parking: drainage systems and retention tanks; landscaping and all ancillary services and works on a 0.603HA site.

Site 14B, Phase 3, Road 3A, Greengoue Industrial Estate, Rathcoole, Co. Dublin.

57m
SD25A/0101WGranted30 Oct 2025

A new hazardous medical waste processing facility, including a change of use of the existing building (Building B) on site from general waste disposal to hazardous medical waste processing, and the extension of the current operating hours to 24/7 The demolition/removal of the existing outbuildings/structures including 2 no. storage units, an office and staff room canteen; The construction of an extension (c. 966 sqm) to the existing building c.1,577 sqm on site (Building B) and associated outbuildings including a new boiler house and storage areas; The construction of a new building (c. 984 sqm) to the northwest of the site (Building A); The construction of a new 2 storey office building (c. 287 sqm) to the southeast of the site; Provision of 26 no. car parking spaces, 5 no. truck parking spaces and 18 no. bicycle stands (30 no. spaces) to serve the proposed development; All ancillary landscaping, boundary treatments, associated infrastructure, internal roads, associated processing and treatment plant, weighbridges, pv panels, and site development works to support the development. The operation of the proposed development will require an Industrial Emissions Licence (IEL) from the Environmental Protection Agency. A Review of the existing IEL relating to the site will be sought from the Environmental Protection Agency in relation to the proposed development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.

Unit 14B, Grant’s Way, Greenogue Business Park, Rathcoole, Co Dublin, D24 FV02

57m
SD19A/0234Refused17 Jul 2019

Amalgamation of Units 14A and 14B to create a single waste processing facility as follows: (1) demolition of a 60m long by 6m high internal wall, single storey site office and store and the removal of 3 portacabin offices; (2) change of use from timber recycling to hazardous waste processing and construction of a new hazardous waste processing Building A (1,831sq.m) with a 14.58 ridge height all at Unit 14A; (3) processing of hazardous waste within existing waste processing Building B and the construction of an extension (1,000sq.m) with a 14.60m ridge height to Building B; new two storey offices (288sq.m) with a 8.5m ridge height; new weighbridge and weighbridge office (40sq.m) and alterations to existing site layout to provide 25 car parking spaces, 4 truck parking spaces and 24 bicycle stands all at Unit 14B; (4) new internal circulation road and the relocation of existing weighbridge; new weighbridge; alterations to the surface water drainage systems; (5) installation of an aqueous waste treatment plant in the new waste processing Building A; (6) installation of a sewage sludge treatment plant in the extended waste processing Building B and associated odour control unit (32sq.m) with 18m high stack; (7) installation of a waste oil recovery plant in the extended waste processing Building B and associated natural gas boiler house and stores (102sq.m) with 16m high stack; (8) installation of a waste oil re-refining plant and storage tanks in the extended processing Building B and associated de-asphalting and fractionating columns (60sq.m total floor area) both with 16m high stacks and all ancillary and associated works; the proposed development entails a phased transition, hazardous waste and non-hazardous waste will be accepted and processed simultaneously at the waste facility and the total quantum of waste accepted will not exceed 95,000 tonnes per annum as permitted at the existing licenced waste facility; the proposed development will require a review of the Industrial Emissions Licence granted by the Environmental Protection Agency; an Environmental Impact Assessment Report (EIAR) is submitted with the application.

Units 14A & 14B, Greenogue Industrial Estate, Rathcoole, Co. Dublin

58m
SD18A/0055Declared Withdrawn19 Feb 2018

Installation of roof mounted solar panels to existing waste transfer station and all ancillary works and services.

Site 14B, Greenogue Industrial Estate, Rathcoole, Co. Dublin.

60m
S00A/0153Granted10 Mar 2000

Construct roads and to carry out site development works.

Greenogue Industrial Estate, Phase 3, Rathcoole, Co. Dublin.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?