← Back to search

Clutterland td, Ballybane, Clondalkin, Co. Dublin

Refused

Planning application S01A/0600

Dublin - South Dublin County Council

Proposed Development

A 25m antennae support structure, containerised equipment, security fence and access track.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    17 Oct 2001

  2. Decision due

    12 Dec 2001

  3. Decision: Refuse Permission

    13 Dec 2001

  4. Appeal submitted

    9 Jan 2002

  5. Appeal decided: Refuse Permission

    8 May 2002

Application Details

Location
Clutterland td, Ballybane, Clondalkin, Co. Dublin.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
400 ha
Floor Area
9 sq m

Timeline

Registration Date
17 October 2001
Status
Appeal decided
Decision
Refuse Permission
Decision Date
13 December 2001
Permission Expires
8 May 2002

An Coimisiún Pleanála Appeal

Appeal Reference
06S.128222
Status
Appeal decided
Decision
Refuse Permission
Submitted
9 January 2002
Decided
8 May 2002

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

146m
SD18A/0027Granted30 Jan 2018

A new car sales show room building with car display, valet, service, and ancillary areas; a new perimeter wall and fence with a new entrance and gates, external car parking compound and all associated site works.

Milltown Cross, Nangor Road, Clondalkin, Co. Dublin

172m
S01A/0472Granted27 Aug 2001

Construction of new basement storey and new ground and first floor extension to existing building to accommodate new kitchen office , storage and staff areas.

Pollyhops Public House, Lucan Road, Newcastle, Co. Dublin.

172m
SD19A/0153Granted27 Feb 2020

3 new buildings. Block A: two storey with six industrial and office units; Block B: two storey with one industrial and office unit; Block C: three storey with ground floor café and office, first floor offices, second floor gym and ancillary areas; new perimeter wall and fence with two revised entrances and gates; surface car parking and all associated site works.

Milltown Cross, Nangor Road, Clondalkin, Dublin 22

226m
SD02A/0236Granted31 Jul 2002

Construction of a two storey private dwelling with domestic effluent treatment system with percolation area, new site entrance and associated site works.

Milltown, Newcastle, Co Dublin.

230m
SD04B/0109Grant Permission for Retention25 May 2004

Detached domestic double garage as constructed adjacent to existing dwelling

Grange, Newcastle Road, Lucan, Co. Dublin

264m
SD25A/0135WGranted24 Oct 2025

The development will consist of the omission of a permitted above ground installation (AGI) compound under Reg. Ref.: SD20A/0058, the provision of an AGI at an alternate location within the site, and the provision of a Pressure Reduction Metering System (PRMS) and a foul pumping station, along with road upgrades to the public road (R120 Peamount Road), and provision of a foul sewer connection from the site to the northeast, via Peamount Road and Old Nangor Road. The relocated AGI, PRMS compound, and foul pumping station will be located in the southeastern corner of the site. It is proposed to demolish an existing two storey vacant house (with a gross floor area of 235 sq.m.) to provide for the AGI, PRMS compound, and foul pumping station. The relocated Gas AGI and the PRMS will be located within fenced compounds and will comprise of the following buildings and gas-related infrastructure: - 2 no. AGI buildings comprising AGI Building 1 with a total area of c.18 sq.m and overall height of c. 3.4m and AGI Building 2 with a total area of c. 8 sqm and overall height of c. 3.1m; - A Boiler House Kiosk with a total area of c. 12 sq.m and overall height c. 3.5m and boiler flues with a total height c. 5.4m; - A new E&I Kiosk with a total area of c. 12 sq.m and overall height of c. 2.7m; - A new Control Room with a total area of c. 12 sq.m and overall height of c. 3m; - A new Skid House with a total area of c. 123 sq.m and overall height of c. 3.3m; - The compounds will also accommodate associated valves and pipework. A new foul water pumping station with associated chambers, meters and a 24-hour storage tank will be provided to the east of the AGI and PRMS compounds. The proposed developmbent includes all associated and ancillary works including site lighting, boundary treatments, landscaping, drainage and infrastructure. The proposed development is located within a site subject to an application for an EPA Industrial Emissions (IE) Directive license.

A site within the townlands of Miltown, Clutterland & Kilmactalway, on and adjacent Peamount Road (R120, and Old Nangor Road Newcastle, Co. Dublin.

312m
SD06A/0527Granted26 Jun 2006

Demolition of an existing habitable house and associated farm outhouses and construction of Head Quarters Offices; Production Plant and National Distribution Centre which comprises of a five-storey office block (total gross floor area 5,375sq.m.) linked via a glazed 365sq.m.) atrium to a two-storey office block (total gross floor area 1618sq.m.; a production plant (total gross floor area 17,153sq.m.) with ancillary plant, substation, storage, workshop, offices and staff facilities including storage at mezzanine level; a distribution centre (total gross floor area 17,480sq.m.) comprising of a cold store, an ambient store; other ancillary storage areas; forklift battery charging area, plant and staff facilities with office space at mezzanine level; 10 no. flour silos, water tank and substation screened by a free-standing structure and ESB station; a water treatment plant and underground attenuation tank; an underground pump-house; new site entrance and access security hut located to the south-east of the site with access onto an internal Business Park distributor road; provision of 60 no. truck parking spaces with power plug in points; provision of 470 no. staff car parking spaces; provision of water feature/attenuation lake and all other landscaping and boundary works; provision of all other associated site and development works. Total development will comprise of 42,600sq.m. of buildings on an overall site area of 9.3 ha. This planning application is accompanied by an Environmental Impact Statement.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.

312m
SD07A/0102Granted13 Feb 2007

Modifications to previously permitted development under South Dublin County Council Register Reference SD06A/0527. The modifications include the reconfiguration of building layout and the following changes: an increase in the front office of HQ building from 4970sq.m. to 6,241sq.m. (gross floor area (gfa)), an increase in the rear office from 1,497 to 2,053 sq.m. (gfa), an increase in the atrium area from 324sq.m. to 398sq.m. (gfa); on the ground floor a reduction in the cold store/distribution area from 10,178sq.m. (gfa) to 9,483 sq.m. (gfa), a new mezzanine area to cold store of 840 sq.m. (gfa), an additional mezzanine area to battery charging area of 506 sq.m. (gfa), an additional plant room on mezzanine level of 68sq.m. (gfa), an additional fire escape adjacent to the ambient store, an additional external fire escape on north elevation adjacent to battery charging area, two additional silo buildings of 64 sq.m. (gfa) and 58sq.m. (gfa), the removal of 1 flour silo and new layout for remaining silos, an additional building of 58sq.m. (gfa) to accommodate a water pump room, new roller shutter doors for the waste compactor room's east elevation, a new pedestrian gate at the southern boundary, a new covered bus stop area and covered smoking area, new automatic sliding gates to main entrance and 4 no. new covered bicycle shelters accommodating 48 no. parking spaces. All building floor levels and site levels to be dropped by 200mm with the implication that all parapet heights change. The main car and truck entrance and the gate house to be moved north east on the Proposed Western Road. The modifications will also include an additional parking area at basement level under the HQ building of 803sq.m. (gfa) with new entrance ramp to accommodate 21 no. additional parking spaces, changes to the parking layout south east of HQ Building to accommodate the basement entrance ramp, change of layout to previously approved truck parking to the north and north east, and 3 no. additional loading bays at the east elevation. The modifications result in an overall increase in the gross floor area of entire development from 42,600sq.m. to 45,400sq.m. on an overall site area of 9.3ha.

Grange Castle Business Park, Nangor Road, Clondalkin, Dublin, 22

312m
SD14A/0262Granted3 Dec 2014

A 111sq.m (gross) single storey extension to the north facade of the existing facility; the development includes connection to existing storm water drainage, process water drainage and associated site works required for the extension.

Aryzta Bakeries Ireland, Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22.

376m
S00A/0404Refused14 Jun 2000

(a) Bungalow (b) domestic garage and (c) septic tank with effluent treatment system.

Castlebaggot, Baldonnel, Co. Dublin.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?