← Back to search

37 Castle Park, Tallaght, Dublin 24

Granted

Planning application S01B/0610

Dublin - South Dublin County Council

Proposed Development

Single-storey kitchen and dining room extension at rear and computer room at side.

View the full application file on the council's planning portal →

Application Timeline

  1. Application received

    23 Nov 2001

  2. Decision due

    18 Jan 2002

  3. Decision: Grant Permission

    18 Jan 2002

  4. Grant issued

    1 Mar 2002

Application Details

Location
37 Castle Park, Tallaght, Dublin 24.
Applicant
N/A
Application Type
Permission
Planning Authority
South Dublin County Council
Site Area
198 ha
Floor Area
25 sq m

Timeline

Registration Date
23 November 2001
Status
Decision
Decision
Grant Permission
Decision Date
18 January 2002
Grant Date
1 March 2002

Location

Loading map...

Planning Applications Nearby

What the council has granted and refused around this site is the best guide to how a similar application will fare.

8m
SD11B/0280Refused27 Oct 2011

Construction of a single storey extension to the existing single storey rear garden shed and covered carport.

36, Castlepark, Balrothery, Tallaght, Dublin 24

46m
S00B/0620Granted19 Dec 2000

Retention of existing kitchen extension and addition of a ground floor utility room and first floor bedroom and bath- room.

No.20 Castlepark, Tallaght, Dublin 24.

46m
SD05B/0587Grant Permission for Retention31 Aug 2005

First floor, pitched roof extension to the rear of the existing house incorporating a bedroom extension and en-suite having a total floor area of 6.12m.sq. and two no. velux roof lights.

20, Castlepark, Tallaght, Dublin 24.

47m
SD06B/0658Invalid - Site Notice28 Aug 2006

Side gate to rear of house.

51, Castle Park, Tallaght, Dublin 24

61m
S01B/0606Granted22 Nov 2001

Construct a single storey extension to the front of the existing dwelling tiled roof over, alterations to the existing entrance gates and associated site works

54 Castle Park, Tallaght, Dublin 24.

72m
SD04B/0694Granted7 Apr 2005

Convert existing attic space to dormer bedroom of 21.48sq.m with high level windows and additional velux roof light or similar approved, to the front of the attic space with associated and ancillary site works.

8, Castle Park, Tallaght, Dublin 24

73m
SD04B/0387Grant Permission for Retention19 Jul 2004

Retention of an existing porch and canopy roof at ground floor level to the front.

48, Castle Park, Tallaght, Dublin 24

76m
SD08B/0220Granted3 Apr 2008

Proposed garage and workshop with pitched roof to rear

26, Castle Park, Dublin 24

78m
SD16B/0370Granted15 Nov 2016

New porch and extended sitting room extension to the front of the existing terraced dwelling with new tiled roof and external finishes to match existing, internal alterations and all associated site works.

57, Castle Park Estate, Balrothery, Tallaght, Dublin 24

96m
S01B/0582Granted9 Nov 2001

Two-storey extension at rear comprising kitchen and bathroom at ground floor, two bedrooms at first floor with ground floor living room extension at front.

62 Castle Park, Tallaght, Dublin 24.

Planning a project of your own?

Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.

Do I Need Permission?