Proposed Development
Construct a 3 storey office block and associated site development works and services.
View the full application file on the council's planning portal →Application Timeline
Further information requested
8 Mar 1999
Application received
16 Mar 1999
Further information received
16 Mar 1999
Decision: Grant Permission
20 Apr 1999
Decision due
13 May 1999
Grant issued
27 May 1999
Application Details
- Location
- Newlands Cross, Dublin 22.
- Applicant
- N/A
- Application Type
- Permission
- Planning Authority
- South Dublin County Council
- Site Area
- 1905 ha
- Floor Area
- 1284 sq m
Timeline
- Registration Date
- 16 March 1999
- Status
- Decision
- Decision
- Grant Permission
- Decision Date
- 20 April 1999
- Grant Date
- 27 May 1999
Location
Planning Applications Nearby
What the council has granted and refused around this site is the best guide to how a similar application will fare.
Alterations to existing boundary wall/railings; proposals to construct a new pedestrian entrance gate and new concrete path to existing bank with all associated site works.
Newlands Cross, Clondalkin, Dublin 22
Two new fascia signs of 1.8sq.m each and one fascia sign of 10.3sq.m on existing building; one pole sign of 1.7sq.m and one railing sign of 5.2m at entrance.
Bank of Ireland, Newlands Cross, Clondalkin, Dublin 22.
Retention of third floor area of 155sq.m. within existing three storey commercial building used for banking purposes including eight roof lights to existing roof.
Bank of Ireland, Newlands Cross, Clondalkin, Dublin 22
Alterations to side (east) elevation of bank to comprise of the removal of window and part wall below; installation of external door and make to remaining opening to match existing; all associated site works.
Newlands Cross, Clondalkin, Dublin 22
Change of use of existing ground floor Bank Of Ireland Business Centre to Retail Banking use.
West Dublin Business Centre, Newlands Cross, Clondalkin Dublin 22
The development will consist of the material alteration to existing medical centre (150msq) with the proposed expansion of the medical centre to provide additional floor Area (25msq) provided by the proposed reduction of the adjacent existing retail shop area reduced from 96msq to 71msq, new window to the east elevation in accordance with lodged plans and documents to include all associated/ancillary works
Newlands Cross, Dublin 22, D22C1P3
Modifications to Outline Permission (S98A/0217) for construction of two storeys of apartments in two blocks (6 apartments), two storeys of apartments (14 apartments) with 390 sq.m. of retail floorspace at ground floor in a single block and additional retail floor space totalling 1214 sq.m.in a single unit.
Newlands Cross, Dublin 22.
(1) The demolition of the existing shed/garage building to the rear of the existing dwelling; (2) the construction of 2 2-bedroom, 3 person detached two storey pitched roof mews dwellings with a single storey flat roof rear projection, located to the rear of the existing dwelling and fronting onto Brideswell Lane (3) the vehicular entrance is off Brideswell Lane (4) connection to all public services, and (5) all necessary ancillary site development works to facilitate this development.
104 Boot Road, Clondalkin, Dublin 22
Retain work shop unit.
Rear 104 Boot Road, Clondalkin, Dublin 22.
Demolition of shed buildings; construction of a 2 storey, 2 bedroom detached dwelling with attic conversion with dormer window within rear roof slope within the side garden of the existing house; vehicular entrance off Boot Road is as existing; connection to all public services; all necessary ancillary site development works.
104 Boot Road, Clondalkin, Dublin 22
Planning a project of your own?
Find out in two minutes whether you need planning permission. It's free, and based on the exempted development regulations.
Do I Need Permission?